Äîêóìåíò âçÿò èç êýøà ïîèñêîâîé ìàøèíû. Àäðåñ îðèãèíàëüíîãî äîêóìåíòà : http://www.gao.spb.ru/english/personal/malkin/publ/zm08l.pdf
Äàòà èçìåíåíèÿ: Thu Apr 14 13:33:55 2011
Äàòà èíäåêñèðîâàíèÿ: Tue Oct 2 03:15:59 2012
Êîäèðîâêà:

Ïîèñêîâûå ñëîâà: m 8
Recent Progress in the VLBI2010 Development
D. Behrend1 , J. B¨hm2 , P. Charlot3 , T. Clark1 , B. Corey4 , J. Gipson1 , R. Haas5 , Y. Koyama6, o D. MacMillan1 , Z. Malkin7 , A. Niell4 , T. Nilsson5 , B. Petrachenko8, A. Rogers4, G. Tuccari9 , J. Wresnik2 (1 (2 (3 (4 (5 (6 (7 (8 (9 ) ) ) ) ) ) ) ) ) NVI, Inc./NASA GSFC, Code 698, Greenbelt, MD 20771, USA Institute of Geodesy and Geophysics, University of Technology Vienna, AT-1040 Wien, Austria Observatoire de Bordeaux ­ CNRS/UMR 5804, BP 89, FR-33270 Floirac, France MIT Haystack Observatory, Westford, MA 01886-1299, USA Onsala Space Observatory, Chalmers University of Technology, SE-439 92 Onsala, Sweden Kashima Space Research Center, NICT, 893-1 Hirai, Kashima, Ibaraki 314-8501, Japan Pulkovo Observatory, St. Petersburg 196140, Russia Geodetic Survey Division, Natural Resources Canada, Ottawa, ON, K1A 0E9, Canada Istituto di Radioastronomia INAF, IT-96017 Noto, Siracusa, Italy ICRF and the link between the ICRF and ITRF by providing the full set of Earth orientation parameters (EOP), in particular DUT1 and nutation. The current VLBI system was conceived and constructed mostly in the 1960's and 1970's. Aging antennas, increasing interference problems (RFI), obsolete electronics, and high operating costs make it increasingly difficult to sustain the current levels of accuracy, reliability, and timeliness. To alleviate this situation, in 2003 the International VLBI Service for Geodesy and Astronomy (IVS) (Schluter and Behrend, 2007) ¨ initiated Working Group 3 (WG3) to define the next generation geodetic VLBI system, which has come to be called VLBI2010. Over a two-year period, WG3 looked into the conceptual aspects of a new VLBI system. In particular, the observing strategies, frequencies and timing, backend systems, data acquisition and transport, correlation and fringe-finding, data analysis, and data archiving and management were investigated. The WG3 work culminated in a "vision paper" (Niell et al., 2006) on the future VLBI system; with this final report the WG was closed in 2005. At the same time, in order to encourage the implementation of the recommendations of WG3, the IVS established the VLBI2010 Committee (V2C) as a permanent body of IVS. The V2C takes an integrated view of VLBI and evaluates the effectiveness of proposed system changes based on the degree to which they improve IVS's final products. The V2C work went hand-in-hand with the gradual establishment of the Global Geodetic

Abstract. From October 2003 to September 2005, the International VLBI Service for Geodesy and Astrometry (IVS) examined current and future requirements for geodetic VLBI, including all components from antennas to analysis. IVS Working Group 3 `VLBI 2010', which was tasked with this effort, concluded with recommendations for a new generation of VLBI systems. These recommendations were based on the goals of achieving 1 mm measurement accuracy on global baselines, performing continuous measurements for time series of station positions and Earth orientation parameters, and reaching a turnaround time from measurement to initial geodetic results of less than 24 hours. To realize these recommendations and goals, along with the need for low cost of construction and operation, requires a complete examination of all aspects of geodetic VLBI including equipment, processes, and observational strategies. Hence, in October 2005, the IVS VLBI2010 Committee (V2C) commenced work on defining the VLBI2010 system specifications. In this paper we give a summary of the recent progress of the VLBI2010 pro ject. Keywords. geodetic VLBI, next generation VLBI2010, IVS, Monte Carlo simulations

1

Intro duction

Very Long Baseline Interferometry (VLBI) is a vital technique in the realization and maintenance of the terrestrial and celestial reference frames (TRF and CRF). It uniquely provides the


Observing System (GGOS) (Pearlman et al., 2006) of the International Accociation of Geodesy (IAG). The IVS aligned the design goals for the VLBI2010 system with the GGOS goals and strives for global baselines to be accurate to 1 mm and stable to 0.1 mm/yr. To reach these goals, a new set of criteria to measure the next generation geodetic VLBI system was established, based on: · the recommendations for future IVS products detailed in the IVS Working Group 2 Report (WG2) (Schuh et al., 2002) · the requirements of the Global Geodetic Observing System pro ject (GGOS) of the International Association of Geodesy (IAG) · the science driven geodetic goals outlined in the NASA Solid Earth Science Working Group Report (SESWG) To realize the demanding goals, the IVS VLBI2010 Committee investigated the various facets that the new system needs to have in order to fulfill the requirements. The ma jor focus right now is on reducing the ma jor error sources stemming from the atmosphere, the instrumentation, and the structure of the radio sources. Furthermore, the following strategies are investigated: · a reduction of the random component of the delay-observable error, e.g., the perobservation measurement error, the stochastic properties of the clocks, and the unmodeled variation in the atmosphere · a reduction of systematic errors, e.g., the thermal and gravitational deflection of the antenna, drifts of the electronics, and radio source structure · an increase of the number of antennas for geodetic VLBI and an improvement of their geographic distribution · an increase of observation density, i.e., the number of observations per unit time · a reduction of susceptibility to external radio-frequency interference

· decreasing the length of time to slew from source to source

· decreasing the time to acquire data while on a source

· improving the scheduling algorithm Although the steps taken to increase the number of observations have been successful, the effort has shown that more work needs to be done to optimize the sky coverage in the short (< 10 minute) intervals corresponding to the atmospheric variability, perhaps at the expense of the total number of observations. Figure 1 shows the number of observations as a function of slew speed of the antennas and different observing strategies.

200

NM-NL-NS NM-NL-OS NM-OL-NS NM-OL-OS OM-OL-OS

Observations (1000's)

175 150 125 100 75 50 25 0

RDV42

0

3

6

9

12

AZ Slew Rate (deg/sec)

2

Increasing the Numb er of Observations p er Day

Increasing the number of observations per day depends on three factors: 2

Fig. 1. Numb er of observations as a function of slew sp eed of the antennas. All schedules were generated assuming identical 12 meter antennas. Improvements in hardware, software and source selection all contribute to an increase of the numb er of observations. Shown are the effects of OM (old mode, i.e. standard observing mode where data are recorded as they are observed), NM (new mode, i.e. "burst mode" where data are buffered and then written to a disk), OL (old list, i.e. old geodetic radio soure list), NL (new list, i.e. new extended geodetic radio source list), OS (old scheduling , i.e. standard scheduling strategy), and NS (new scheduling, i.e. new scheduling strategy). For comparison we also include the results for RDV42, a recent VLBI session involving 10 VLBA stations (slew sp eed 1.5 deg/sec) and 9 other stations (various slew sp eeds) as a red dot. The remaining curves (from b ottom to top) are: 1) OM­OL­OS; 2) NM­OL­OS; 3) NM­OL­NS; 4) NM­NL­OS; 5) NM­NL­NS.


Table 1. Sp ecifications of the current VLBI system and the VLBI2010 system. parameter antenna size slew sp eed sensitivity frequency range recording rate data transfer current VLBI system 5-100 m dish 20­200 deg/min SEFD 200­15 000 S/X-band 128, 256 Mbps usually disk shipping some e-transfer planned VLBI2010 system 12 m dish 360 deg/min SEFD 2 500 2­15 (18) GHz 8­16 Gbps e-transfer, e-VLBI disk shipping when required

3

Decreasing the p er Observation Measurement Error

Recent technological advances have made it economically feasible to simultaneously use several (four or more) frequency bands spread across a wide frequency range, e.g. 2 GHz to 15 GHz. Analysis shows that, with such systems, VLBI phase ambiguities can be reliably resolved, resulting in typical delay precision of about 2.5 ps (less than 1 mm) (Petrachenko, 2007). For comparison, with current group delay systems, the per-observation delay measurement error is typically about 10­30 ps. Table 1 gives an overview of the key-parameters of the current VLBI system and the planned VLBI2010 system. To demonstrate that this broadband delay concept will work in practice, NASA is supporting an R&D pro ject to build a proof-of-concept "broadband" system and to evaluate its performance under real-world conditions. Ma jor challenges for the concept include successful operation in the presence of RFI, realistic radio source structure, and uncalibrated instrumental offsets. The principal components of the new system a r e: · Broadband dual linearly polarized feeds covering 2 GHz to 15 GHz (see e.g. Figure 2) · Broadband low noise amplifiers for 2 GHz to 15 GHz · Digital backends with four 512 MHz channels each and 2 bits/sample · Mark5B+ recorders (Whitney, 2007) with 2 gigabits per second Initial tests will be performed on a 600 km long baseline using the Westford (near Boston) 18 m antenna and the GGAO (at Goddard Space Flight Center, Washington, D.C.) 5 m antenna. 3

Fig. 2. The ETS-Lindgren quad-ridge broad band feed-horn (ETS-Lindgren, 2007) inside a heat shield attached to the 15 K station of the cryogenic refrigerator. The dewar is on the right hand.

The proof-of-concept system will record both linear polarizations from four 500 MHz bands that can be independently positioned in the frequency range from 2 GHz to approximately 12 GHz. The aggregate data rate at each site will be 8 Gbps using four Mk5B+'s (Whitney, 2007) and two Digital Back Ends (DBEs) (Whitney et al., 2007). Detailed designs are at an advanced stage, parts are being acquired and assembled, and the first tests are expected in autumn of 2007.

4

Simulations

As part of the development of specifications for the new VLBI2010 observing system, the IVS has been performing simulations to evaluate the geodetic performance of VLBI2010 networks. Monte Carlo simulations with different system specifications have been performed by geodetic analysis using simulated data consisting of troposphere, clock, and thermal noise delay contributions. The o-c vector (observed minus computed


group delay) is set up as follows:
o-c = WZD2 · mfw2 () + CL
2

25 CONT05 real data CONT05 simulated data 16 station network simulated data wzd: turbulence model

(1)
1

20

- WZD1 · mfw1 () + CL

+ WNBsl

Length Repeatability [mm]

15

For each observable, WZD1,2 and CL1,2 are the simulated wet zenith delay and clock values at station 1 and 2, respectively, and mfw1,2 () are the wet mapping functions for the elevation angle . The wet mapping functions are assumed to be without error in our studies. For each baseline a white noise contribution WNBsl is added. The clock values are simulated as the sum of a random walk plus an integrated random walk (Herring et al., 1990). These processes are driven by white noise with a PSD (power spectral density) of 0.3 ps2 /s for the random walk and 0.1 2 (fs/s) /s for the integrated random walk. The wet zenith delay values are simulated with a turbulence model that is described in detail in Nilsson et al. (2007). This model has been empirically verified with microwave radiometry by Nilsson et al. (2005) and Nilsson et al. (2006). The turbulence model uses as input station dependent structure constants Cn , tropospheric height h, saturation scale length L and wind speed and direction. The wind speed and direction and the tropospheric height for the VLBI2010 simulations are taken from the ERA40 numerical weather model (ERA40, 2007) of the European Center for Medium-Range Weather Forecast (ECMWF, 2007). The structure constants are derived by an empirical fit to highresolution radiosonde data, and the saturation scale length is fixed to the values proposed by Treuhaft and Lanyi (1987). Once the o-c vector is created the simulations allow us to investigate optimal network antenna locations, antenna sensitivities, slew rates and observing schedules. Figure 3 compares the results of an analysis of real CONT05 data (which is the best VLBI data set to date), a Monte Carlo simulation of the CONT05 data, and a Monte Carlo simulation of an anticipated VLBI2010 observing scenario. Both simulations were carried out with parameterizations of the atmospheres, clocks and measurement errors intended to be as realistic as possible. In both cases, the wet zenith delays are simulated using the turbulence model while the clocks are simulated using the random walk plus integrated random walk model constrained by an 4

10

5

0 0

2

4

6

8

10

12

14

Baseline Length [1000 km]

Fig. 3. Baseline length rep eatability as a function of baseline length: The blue dots show the analysis of real CONT05 data. The red crosses show the analysis of simulated CONT05 data using the Monte Carlo simulator with clock parameters of 1 · 10-14 at 50 min, a turbulence model for the trop ospheric parameters, and delay measurement errors based on the real CONT05 observation errors. The green triangles show the simulation of a 16 station network of VLBI2010 antennas. Here the clock and atmosphere delays are simulated as for the CONT05 simulation, and a delay measurment error of 4 ps was used.

Allan Standard Deviation (ASD) of 1 · 10-14 at 50 min. In the case of the CONT05 simulation, the delay measurement errors are based on the observing errors of the real observations, which have a mean value over all observed baselines of 29 ps. For the VLBI2010 simulation, a delay measurement error of 4 ps, which is realistic for phase delays, is used for all observations.

5

Network Size

A series of Monte Carlo runs were performed to evaluate the relative performance of networks of different size. For this purpose, a series of theoretical networks were generated that have roughly uniform global coverage and use plausible locations (e.g. the sites are on land and are co-located with GPS). These simulations indicate that the VLBI2010 network could improve the determination of the TRF scale to roughly several parts in 1010 in a single session, compared to the current level of determination of the TRF scale of about less than one part in 109 . Figure 4 shows the precision of the relative scale parameter as a function of the number of network stations. Simulation and analysis of the


1.0 Relative Scale Precision 0.8 0.6 0.4 0.2 0.0

0

10

20 Number of Network Sites

30

40

Fig. 4. Terrestrial Reference Frame scale parameter precision from Monte-Carlo simulations. Precision is expressed relative to the precision of the 8-site net work. The line represents a simple (1/ n)-law.

dependence of EOP quality on the network size have shown an expected twofold improvement in both EOP precision and accuracy compared to existing regular IVS networks. Figure 5 shows an example of a test network with 16 stations with VLBI2010 antennas.

to correct for such source structure errors. As an example, Figure 6 (Charlot, 2002) shows in the top a contour plot of the X-band radio emission for a structure index 3 radio source, and in the bottom the corresponding absolute values of structural delays for this source for baselines up to the length of one Earth diameter. There is also temporal variation of radio source structure as for example shown in Figure 7 (Charlot, 2002) for a typical X-band radio source that is regularly observed by the IVS. This phenomenon is impossible to address with the current VLBI system. With the new VLBI2010 observing scenarios that include larger networks and a manifold increase in the number of observations per session, UV-coverage will improve to the point where precise VLBI images of the ICRF sources can be constructed on a daily basis directly from the geodetic observations, therefore enabling source structure corrections to be calculated. Simulations are currently underway to evaluate the potential of this approach. Figure 8 shows the UV-coverage of a typical IVS experiment in today's R1-series compared to the UV-coverage of a VLBI2010 schedule.

7

Summary

As part of the IVS VLBI2010 renewal process studies are carried out to develop requirements for achieving 1 mm position accuracy on global length baselines. This is a work in progress. The highlights of this work include: · Studies show that faster slewing antennas, burst mode recording and improved scheduling algorithms yield a quantum increase in VLBI observations per session.
Fig. 5. Example of a 16 station test network of VLBI2010 antennas.

· Proof-of-concept tests are in preparation to demonstrate the broadband delay technique for achieving an order of magnitude improvement in delay precision. · Monte Carlo simulators have been developed to evaluate the benefits of improved instrumentation and scheduling strategies. · The Monte Carlo simulators are being calibrated against CONT05 real data. · Monte Carlo results indicate that increased observation density and delay precision lead to precisions of positions in the range 1.5­ 3.5 mm. Better scheduling and analysis 5

6

Source Structure Corrections

As we approach 1 mm precision, source structure becomes an ever more significant error component for geodetic VLBI. Furthermore, it significantly degrades our potential to use the proposed "broadband delay" technique to access VLBI's precise phase delay observable. As a result, it will be important to apply appropriate modeling


Fig. 7. (Charlot, 2002) VLBI images of 2200+420 at X-band for 10 successive ep ochs, spanning the p eriod 1997.1­1998.6, as available from (Fey et al., 2002).

Fig. 6. Top: Contour plot of the X-band radio emission for a structure index 3 source. Structure index 3 indicates that the median structure error over all p ossible baselines is b etween 10 picoseconds (ps) and 30 ps. Ab out 35% of the current ICRF defining sources are in this structure class. Bottom: The corresp onding absolute values of structural delays for this source. The structural delay is plotted as a function of the length and orientation of the VLBI baseline pro jected onto the sky, expressed in millions of wavelengths (u, v coordinates), and the color coded scale ranges from 0 to 100 ps. The circle drawn in this plot has a radius equal to one Earth diameter, corresp onding to the longest baselines that can b e theoretically observed with Earth-based VLBI.

Fig. 8. Top: UV-coverage of a typical R1exp eriment. Bottom: UV-coverage of a VLBI2010 schedule.

6


strategies are expected to lead to further improvements. · Initial studies indicate that the increase in observation density and larger networks will enable active source structure corrections. Further simulations are underway.

Nilsson, T., G. Elgered, and L. Gradinarsky (2006). Characterizing Atmospheric Turbulence and Instrumental Noise Using Two Simultaneously Operating Microwave Radiometers. In: Proc. 9th Specialist Meeting on Microwave Radiometry and Remote Sensing Applications, MicroRad 2006, pp. 270­275. Nilsson, T., R. Haas, G. Elgered (2007). Simulations of atmospheric path delays using turbulence models. In: Proc. of the 18th European VLBI for Geodesy and Astrometry Working Meeting, J B¨hm, A Pany, H Schuh (Eds.), o Geowissenschaftliche Mitteilungen, Schriftenreihe der Studienrichtung Vermessung und Geoinformation, Technische Universit¨t Wien, 79, pp. a 175­180. http://mars.hg.tuwien.ac.at/ evga/ proceedings/S64 Nilsson.pdf Pearlman, M., Z. Altamimi, N. Beck, R. Forsb erg, W. Gurtner, S. Kenyon, D. Behrend, F.G. Lemoine, C. Ma, C.E. Noll, E.C. Pavlis, Z. Malkin, A.W. Moore, F.H. Webb, R.E. Neilan, J.C. Ries, M. Rothacher, and P. Willis (2006). Global Geodetic Observing System­ Considerations for the Geodetic Network Infrastructure. Geomatica, 60(2), pp. 193­204. Petrachenko, B. (2007). Achieving a Quantum Leap in Observation Density. In: International VLBI Service for Geodesy and Astrometry 2006 General Meeting Proceedings, D. Behrend and K. Baver (Eds.), NASA/CP-2006-214140, pp. 67­71, ftp://ivscc.gsfc.nasa.gov/pub/ general- meeting/2006/pdf/petrachenko.pdf Schluter, W., and D. Behrend (2007). The Interna¨ tional VLBI Service for Geodesy and Astrometry (IVS): current capabilities and future prosp ects. Journal of Geodesy, 81(6-8), pp. 379­387. Schuh, H., P. Charlot, H. Hase, E. Himwich, K. Kingham, C. Klatt, C. Ma, Z. Malkin, A. Niell, A. Nothnagel, W. Schluter, K. Takashima, and ¨ N. Vandenb erg (2002). IVS Working Group 2 for Product Sp ecification and Observing Programs. In: International VLBI Service for Geodesy and Astrometry 2001 Annual Report, N. Vandenb erg and K. Baver (Eds.), NASA/TP-2002-210001, pp. 13­45, ftp://ivscc.gsfc.nasa.gov/pub/ annual- report/2001/pdf/wg2 report 2.pdf Treuhaft, R.N., and G.E. Lanyi (1987). The effect of the dynamic wet trop osphere on radio interferometry measurements. Radio Science, 22(2), pp. 251­265. Whitney, A. (2007). The Mark 5 VLBI Data System. In: Proc. of the 18th European VLBI for Geodesy and Astrometry Working Meeting, J B¨hm, A Pany, H Schuh (Eds.), Geowiso senschaftliche Mitteilungen, Schriftenreihe der

Acknowledgement
J. B¨hm and J. Wresnik are grateful to the Auso trian Science Fund (FWF) for supporting this work within Pro ject P18404-N10.

References
Charlot, P. (2002) Modeling Radio Source Structure for Improved VLBI Data Analysis. In: International VLBI Service for Geodesy and Astrometry 2002 General Meeting Proceedings, N. Vandenb erg and K. Baver (Eds.), NASA/CP-2002-210002, pp. 233­242, ftp://ivscc.gsfc.nasa.gov/pub/ general- meeting/2002/pdf/charlot.pdf ECMWF: http://www.ecmwf.int/ ERA40: http://data.ecmwf.int/research/era/ ETS-Lindgren horn: http://www.ets- lindgren. com/page/?i=3164- 05 Fey, A.L, D.A. Bob oltz, R.A. Gaume, and K.A. Kingham (2002). USNO Analysis Center for Source Structure Rep ort. In: International VLBI Service for Geodesy and Astrometry 2001 Annual Report, N. Vandenb erg and K. Baver (Eds.), NASA/TP-2002-210001, pp. 249­252. ftp://ivscc.gsfc.nasa.gov/pub/ annual- report/2001/pdf/acusnoss.pdf Herring, T.A., J.L. Davis, and I.I. Geodesy by radio interferometry: of Kalman filtering to the analy baseline interferometry data. J. 95(B8), pp. 12561­12581. Shapiro (1990). the application sis of very long Geophys. Res.,

Niell, A., A. Whitney, B. Petrachenko, W. Schluter, ¨ N. Vandenb erg, H. Hase, Y. Koyama, C. Ma, H. Schuh, and G. Tuccari (2006). VLBI2010: Current and future requirements of geodetic VLBI systems. In: International VLBI Service for Geodesy and Astrometry 2005 Annual Report, D. Behrend and K. Baver (Eds.), NASA/TP-2006-214136, pp. 13­40. ftp://ivscc.gsfc.nasa.gov/pub/ annual- report/2005/pdf/spcl- vlbi2010.pdf Nilsson, T., L. Gradinarsky, and G. Elgered (2005). Correlations Between Slant Wet Delays Measured by Microwave Radiometry. IEEE Trans. Geosci. Rem. Sens., GE-43(5), pp. 1028­1035.

7


Studienrichtung Vermessung und Geoinformation, Technische Universit¨t Wien, 79, pp. a 33­38. http://mars.hg.tuwien.ac.at/ evga/ proceedings/S21 Whitney.pdf Whitney, A.R, S.S Doeleman, B. Fanous, H.F. Hinteregger, and A.A.E. Rogers (2007). A WideBand VLBI Digital Backend System. In: International VLBI Service for Geodesy and Astrometry 2006 General Meeting Proceedings, D. Behrend and K. Baver (Eds.), NASA/CP-2006-214140, pp. 72­76, ftp://ivscc.gsfc.nasa.gov/pub/ general- meeting/2006/pdf/Whitney2.pdf

8