Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.eso.org/sci/publications/announcements/sciann16020.html
Дата изменения: Unknown
Дата индексирования: Sun Apr 10 23:21:36 2016
Кодировка: IBM-866

Поисковые слова: п п п п п п п п п п п п п п п п п
ESO - MOONS passes its Preliminary Design Review
 
 

MOONS passes Its Preliminary Design Review

Published: 05 Apr 2016
CAD view of MOONS

The Multi-Object Optical and Near-Infrared Spectrograph (MOONS), has officially passed the major milestone of Preliminary Design Review (PDR). MOONS will be able to deploy ~1000 fibres over a field of view of ~500 square arcminutes, the largest patrol field offered at VLT Nasmyth focus. Total wavelength coverage is 0.6тАУ1.8 ѕ®m in the medium resolution (4000тАУ6000) mode; higher (R~9000) resolution will be available for the Ca II triplet (~0.85 ѕ®m) region and one region at R~20000 in H-band.

The MOONS consortium is led by the UK STFC Astronomy Technology Centre and includes: Institute of Astrophysics and Space Sciences (IA), Portugal; GEPI, Observatoire de Paris; Italian National Institute for Astrophysics (INAF) with its centres in Florence, Bologna, Milan and Rome; AIUC, Centre for Astro-Engineering, Pontificia Universidad Cat†Ѓlica de Chile; Cavendish Laboratory and Institute of Astronomy, UK; ETH Z†®rich, Institute for Astronomy; Universit†й de Gen†иve, through its Astronomical Observatory; and ESO.

MOONS is due to begin operation in 2019.