Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.eso.org/projects/dfs/to-do-list/seg-to-do-close.txt
Дата изменения: Wed Jun 6 15:16:27 2001
Дата индексирования: Sat Dec 22 23:38:43 2007
Кодировка:

Поисковые слова: п п п п п п п п п
=================================
* LIST OF CLOSED ACTION ITEMS *
=================================

Last update: Wed Jun 6 13:16:27 MET DST 2001

----------------------------------------------------------------------------------------------
ID Chronological number.
Comp Name of the DFS project or component (SAF, VCSOlac, FrameIngest, DO, RBS,
-pipe, ...). In most of the cases, it's enough to have a To-Do list
per DFS project (e.g. SAF). However, project managers may decide to have a
To-Do list per component, if appropriate.
Origin Meeting name/review/date during which the action item was originated.
Type ACTION= for a normal action item;
BUG= for an item related to a bug report;
CHANGE= for an item related to a change request.
Prior Priority= LOW, HIGH, CRITIC
DueDate Either a specific date (YYYY-MM-DD) or a specific new release (in that case,
corresponding date has to be specified in corresponding DFS component schedule).
Resp Responsible name; even if several persons can be involved in the action item, one
should be responsible for follow-up.
Status DONE= action item done; CANCEL=cancelled.
Description
Detailed description. For BUG and CHANGE, specify the SPR number and a short
description: the complete description of the SPR must be found in Action Remedy.
Justification
Description of "HOW" the action item has been done (if different from the
"description" field or if important details have to be reported) or
"WHY" the action item is cancelled.
----------------------------------------------------------------------------------------------
ID Comp Origin Type Prior DueDate Resp Status
Description
==> Justification
----------------------------------------------------------------------------------------------
0038 SEG GM/MZ,10/05 Action Low OCT2001 CG
/MZ Done
Remove the Tcl version of P2PP from the offical deliveries. Only jp2pp should b
e used.
==> CG. 05.06.01: Tcl OT/P2PP removed for next dfs-4_5 release.

0037 SEG SEGmeet30/04 Action High 2001-03-08 CG
/GM Done
Prepare a patch and send it to the mountain with the following content:
. FTU plugin ftuGetMoonPars,
. translationtables spectroscopy.ht and imaging.ht including the generation of moon parameters
. new dfslogd with reconnecting to the database after shutdown and reboot
. solution to allow user astro to delete his files on the user workstation
==> CG. 05.06.01: dfs-4_4_2 patch file sent to Paranal 08.05.01

0036 SEG SEGmeet05/03 Action HIGH 2001-03-12 KH Done
Test LISP on HP11 with new OT 1.4.1
==> Done by MZ/KH

0035 SEG SEGmeet05/03 Action HIGH 2001-03-15 CG
Done
IDL licenses server upgrade : waiting for Pascal's answer.
==> CG. 05/06/01: VLTI in Paranal is using one of the 4 IDL licenses from VLT.

0034 SEG MP/KH Action HIGH 2001-03015 GM Done
DFS MARCH2001 commissioning: Pipelines testsL: run 2 instrument pipeline parallell
==> gm, 19/03/01: see testcase 98-014 of test-rbs.sh

0031 SEG ndevilla Action HIGH 2001-04-30 Ca
rlos Done
Extend Purify license on dfs2 (Solaris) for Nicolas
==> CG. 05/06/01: Release 5.3 installed today on dfs1,dfs2 by Kevein Maguire.


0029 SEG SCCB15/02 Action HIGH 2001-03-01 GM Done
SPR FTU DFS00738: split filenames. Merge headers first. Add a testcase for this.
==> gm, 19/03/01: see testcase 05-065 of test-ftu.sh

0026 SEG SCCB15/02 Action HIGH 2001-03-12 GM Done
SPR FTU DFS00811: FTU: error reporting exceeds 1 KB.
To be tested for MARCH2001.
==> gm,19/03/01: tested manually, no regression test exists.

0024 SEG SCCB15/02 Action HIGH 2001-03-01 GM DONE
SPR RBS DFS00417: remove testcase.
==> Testcase not removed, but the behaviour is accepted as OK. (19/02/02,GM)


0022 SEG SEGmeet05/02 Action CRITIC 2001-02-19 GM/MP Done
Check the dictionaries.
==> gm,19/03/01: dictionaries correlated with the ones in vlt cmm. Newest version checked
in into SNIFF

0021 SEG mperon Bug CRITIC 2001-02-15 GM Done
Test new DO release delivered by Michele.
==>Changes of DO tested. DO accepts again a list of instruments. (13.2.01,GM)


0020 SEG mperon Bug CRITIC 2001-02-08 CG/MZ Done
Put into sniff new DO release delivered by Michele from wu0pl
on ~flowmgr/dfsSrc/dfs-4_3_1/dfsCore/dfsCoreLib/ostcrea.c

0018 SEG SCCB#1/Feb2001 Bug High 2001-02-15 GM Done
Add testcases for DFS00834 ("vcsolac uses 98% of the CPU"), and run it on OLAS MARCH2001.
==>02.02.01: Testcase installed (10-021) in test-vcsolac.sh.
Because the testcase is now within the regression tests, it
will be performed everytime, the VCSOLAC is tested.

0017 SEG SCCB#1/Feb2001 Bug High 2001-03-12 GM Done
DFS00666 ("UVES BIAS frames have non-zero EXPTIME keyword content) and
DFS00668 ("no DPR TECH keyword in UVES BIAS and DARK frames"). If there are still
inconsistencies in the DB (coordinate with szampier), check with rhanusch.
==> 16/02/01 GM: szampier told me, that there are still inconsistencies in the DB,
also for newer files. He will contact rhanusch.
==> SCCB meeting#3: SPR closed/rejected (see VLT SPR)

0016 SEG GM Action Low 2001-03-01 GM Done
Update AR report documentation in testreport for dhs


0010 SEG SEGmeet15/01 Action High 2001-01-19 GM Done
Deliver a complete FrameIngest Test Report release to MP

0007 SEG SEGmeet27/11 ACTION CRITIC 2001-02-12 MZ+GM Done
Define and install a procedure to get a snapshot of DB
==> see tools DB_setdefault.sh (12.2.01, GM)

0006 SEG MZ ACTION HIGH 2001-03-01 CG Done
See with Maurizio how to improve OHS deliveries (CVS -> RCS interface with 3
trees ? Specific P2PP, specific OT, common P2PP/OT). Tar file from the web ?
==> JP2PP and JOT deliveries are now consistent

0005 SEG SEGmeet24/07 ACTION CRITIC 2001-03-15 GM Done
Analyze impact of merging the 2 Off-line workstations
==> 03.03.2001: Test were performed to connect 2 different user at the
same offline workstation to 2 different UTs. The dhsSubscribes could
be set up to store the data into directories /data1 and /data2, where
user1 has access to /data1 but not to /data2 and user2 vice versa.


0002 SEG SEGmeet22/05 ACTION CRITIC 2001-03-01 MZ Done
Implement automatic installation of PIPELINES : one unique script for checking,
creating new files, removing old ones, logging each installation steps, ...
Release a corresponding documentation.
==> see the IPIP procedure on the DFS Home Page

0001 XXX DFSmeet2999-02-01 ACTION HIGH 2999-03-01 ZZ CANCEL
This is a HIGH priority action item originated during the DFS meeting on 2999-02-01.
It's about the project or component called XXX. It has to be solved by ZZ before 2999-03-01.
The current status of this action item is CANCEL.
==> it has been cancelled because this and this ...