* LIST OF CLOSED ACTION ITEMS *
=================================

Last update:
Tue Jul 10 13:04:58 MET DST 2001

----------------------------------------------------------------------------------------------
ID Chronological number.
Comp Name of the DFS project or component (SAF, VCSOlac, FrameIngest, DO, RBS,
-pipe, ...). In most of the cases, it's enough to have a To-Do list
per DFS project (e.g. SAF). However, project managers may decide to have a
To-Do list per component, if appropriate.
Origin Meeting name/review/date during which the action item was originated.
Type ACTION= for a normal action item;
BUG= for an item related to a bug report;
CHANGE= for an item related to a change request.
Prior Priority= LOW, HIGH, CRITIC
DueDate Either a specific date (YYYY-MM-DD) or a specific new release (in that case,
corresponding date has to be specified in corresponding DFS component schedule).
Resp Responsible name; even if several persons can be involved in the action item, one
should be responsible for follow-up.
Status DONE= action item done; CANCEL=cancelled.
Description
Detailed description. For BUG and CHANGE, specify the SPR number and a short
description: the complete description of the SPR must be found in Action Remedy.
Justification
Description of "HOW" the action item has been done (if different from the
"description" field or if important details have to be reported) or
"WHY" the action item is cancelled.
----------------------------------------------------------------------------------------------
ID Comp Origin Type Prior DueDate Resp Status
Description
==> Justification
----------------------------------------------------------------------------------------------

0003 ISAAC clidman-21jan2001 CHANGE HIGH 2001-04-01 ndevilla DONE
Recipe SW Darks: validation.
The new read-out noise computation algorithm has been validated
both by PSO and DFO. Considered operational now.

0005 ISAAC clidman-21jan2001 ACTION LOW 2001-09-01 ndevilla CANCEL
Recipe SW Background: implementation, validation.
This task has been superseded by task 0023

0006 ISAAC clidman-21jan2001 ACTION HIGH 2001-09-01 ndevilla CANCEL
Recipe LW Background: implementation, validation.
This task has been superseded by task 0023


0019 ISAAC clidman-21jan2001 ACTION LOW 2001-07-01 ndevilla DONE
Recipe LWI Zero points: validation.
Recipe validated by Paranal, now active on the mountain.


0022 ISAAC pamico-21jan2001 ACTION HIGH 2001-02-01 yjung DONE
Recipe: file renaming for operations.
The command has been completed, with support for FITS images, tables,
PAF files and also several other naming conventions (archive file
name, original file name). Although this command will be updated
for every new class of product, this action is considered completed.

0024 ISAAC IOT-Apr20001 ACTION HIGH 2001-07-01 IOT DONE
Complete ISAAC Data Reduction Guide.
Guide completed, release controlled by instrument scientist.