CHRONOLOGY OF ACTIVITIES
April 27 - May 24, 2009
|
Prelaunch processing of Block DM-SLB ?3L within the
Zenit-3SLB ILV.
|
May 19-30, 2009
|
MEASAT-За SC processing (Malaysia).
|
May 25, 2009
|
US filling with high-boiling propellant components and compressed gases.
|
May 31 - June 5, 2009 |
MEASAT-За SC filling with propellant components and compressed gases.
|
June 5-11, 2009 |
Assembly and nominal processing of Ascent Unit ?3L. |
May 29- June 11, 2009 |
Nominal prelaunch processing of launch vehicle Zenit-2S ?3L within the Zenit-3 SLB ILV. |
June 12-17, 2009 |
Assembly and nominal prelaunch processing of the Zenit-3SLB ILV. |
June 18, 2009 |
State Committee accepted a decision on the Zenit-3SLB ILV roll-out to LC for ILV further processing for the MEASAT-За SC launch. |
June 19, 2009 |
1-st launch day. ILV transportation to the Launch Complex ILV installation on LC. Start of ILV nominal prelaunch processing. |
June 20, 2009 |
2-nd launch day. Critical launch readiness checklist (CLRC). |
June 21, 2009 |
3-rd launch day. CLRC mode analysis. Meeting of the State Committee (launch readiness review with Customer participation). LC preparation for prelaunch processing (PLP) mode. At 20:50, Moscow time (16:50 UTC) PLP mode. |
June 22, 2009 |
At 1:50, Moscow time (on June 21, 2009 at 21:50 UTC) the launch of the Zenit-3SLB ILV with the MEASAT-За spacecraft was performed. |
LAUNCH RESULTS
The MEASAT-За spacecraft was injected into the calculated geo-transfer orbit with the following parameters:
Perigee altitude,
km |
Apogee
altitude,
km |
Inclination,
deg. |
11596 |
35601 |
10.62 |
|
|