Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.energia.ru/eng/land-launch/tk.html
Дата изменения: Unknown
Дата индексирования: Mon Oct 1 20:00:10 2012
Кодировка:

Поисковые слова: sirds
S.P.Korolev RSC Energia - LAND LAUNCH SYSTEM

 
homepage
LAND LAUNCH
COMPLEX CONTENT
TECHNICAL COMPLEXES AND FUELING
 STATION

Russian
   

Technical Complex for the Zenit TM LV/ILV Processing

The Zenit TM technical complex includes LV assembly & testing facilities envisaged for LV stages reception, storage, servicing, autonomous assembly and testing; LV mating with the Ascent Unit with formation of the Integrated Launch Vehicle; ILV integrated electrical tests and its loading to the transporter-erector before roll-out to the launch complex for launch.

Main Characteristics of the Zenit TM Technical Complex

Factor name
Value
  Number of work stations at ATF
1
  Maximum production rate
  (number of ILV prepared for launch), pc/year
up to 12
  Duration of the Zenit-3SLB assembly and processing, days
~ 35
  Number of bridge cranes at ATF, pcs
2
  Bridge crane load-carrying capacity, t
50/10
  Periodicity of maintenance
once a year
  Clean room for AU processing its mating with LV
available
  Class of air cleanliness in rooms №1 and clean chamber
  per USA FS (GOST 5076-95)
10000
(п8)

Technical Complex for US Processing

The technical complex for the Upper Stage processing is envisaged for storage, autonomous preparation and verification of Block DM-SLB before its delivery to the fueling station.


Technical Complex for SC/AU Processing and Fueling Station

The technical complex and fueling station are intended for SC processing, US and SC fueling, pressurization, pyros preparation and AU assembly.

 

 

 

Official WEB-site of S.P.Korolev RSC Energia
E-mail:mail@rsce.ru