December 1991 - March 1992 |
NPO Energia together with a number of Russian enterprises has conducted preliminary studies on development of
a Sea-Based Rocket and Space Complex on the basis of large-capacity means of domestic marine for modern launchers
Zenit, Energia-М, Energia. |
March 1993 |
NPO Energia specialists at a meeting in the Boeing premises
have presented a Sea-Based Rocket and Space Complex
project (SB RSC). |
November 1993 |
In Turku (Finland) the future partners (Boeing, NPO Energia, Кvaerner) have discussed proposals on Launch
Platform and signed a frame agreement on SB RSC development and necessity for foundation of an international company.
|
March 1994 |
RSC Energia has developed technical proposals on Sea-Based Rocket And Space Complex (SB RSC) with participation
of conventional Russian cooperative agencies. Involved in activities is NPO Yuzhnoye (Ukraine). |
May 1995 |
Presidents of four companies have signed the Sea Launch Joint Venture Foundation Agreement (for Boeing,
Seattle, USA - James Noblitt; for RSC Energia, Korolev, Russia - Juri Semenov; for Кvaerner, Oslo, Norway
- Ditrich Schnitler; for NPO Yuzhnoye, Dnepropetrovsk, Ukraine - Yuri Alekseyev). The subsequent meeting
of partners began to determine the stragedy of Sea Launch program development.
RSC Energia together with subcontractors has developed a conceptual project on Sea Launch RSC.
|
December 1995 |
RSC Energia President Yu. Semenov for the purposes of enhancement of work efficiency has taken a decision to establish
a Directorate and Science and Technology Center 10 under the Sea Launch program. An operational-technical management
for activities of RSC Energia cooperative agencies is established. |
February 1996 |
RSC Energia has developed proposals on structure, responsibility, and sequence of concurring joint (international) documents. |
March 1996 |
At Boeing Commercial Space Company/RSC Energia/ Кvaerner/ NPO Yuzhnoye and KBTM meeting in Oslo, Norway, on RSC
Energia initiative a decision is taken to establish an international structure of working groups for project management on the working level. Leads of working groups from RSC Energia are identified. |
January - December 1996 |
Integrated project documentation is developed:
- Sea Launch RSC breakdown chart (identification
of cooperating subcontractors);
- procedure for performing operations, structure
and composition of personnel;
- integrated documents (master procedure, prelaunch
processing program, integrated test program).
Project and design documentation on Rocket Segment
in support of building of ships is developed:
- documentation for Rocket Segment systems and equipment;
- interface documentation and specifications of
Rocket Segment equipment for shipyards and project
agencies.
Documentation for payload integration with ILV is
developed.
|
Construction work on Assembly-Command Ship (Kvaerner-Govan
shipyard, Glasgo, Great Britain) and Launch Platform
(Kvaerner-Rosenberg, Stavanger, Norway) is launched.
|
Manufacturing work on Rocket Segment systems and equipment (Russian enterprises) is launched. |
Initial data and requirements on rocket equipment installation on ships are developed. |
March 1997 |
Cooperation of Russian enterprises on Rocket Segment
equipment installation on ships is identified:
- TsKB МТ Rubin - development of installation documentation;
- Kvaerner-Vyborg shipyard - additional outfitting
of the Launch Platform;
- АО "Kanonersky sudoremontny zavod"
(joint-stock venture Kanonersky shipyard) - additional
outfitting of the Launch Platform.
|
March 1997 - March 1998 |
Manufacturing and deliveries of Rocket Segment equipment are implemented. |
March 1997 |
The Board of Chief Designers is held in Korolev with review of problematic issues connected with Sea Launch RSC development. |
March-April 1997 |
International Bank for reconstruction and development guarantees are received for commercial risks during Sea Launch program
implementation. Project funding scheme definition is completed. |
May 30, 1997 |
The Launch Platform has come to Kvaerner-Vyborg shipyard for outfitting with Rocket Segment systems and equipment
and completion of work on marine equipment. |
June 16-27, 1997 |
First review on project certification (Moscow) with participation of representatives from customers. |
July 28, 1997 |
RF Government decree "On Russian Federation administration of guarantees for the international project on Sea Launch
Sea-Based Rocket and Space Complex development" is signed. |
September, 1997 |
In Dnepropetrovsk is held the Board of Chief Designers on status assessment w.r.t. integrated documentation
issue in support of Sea Launch RSC development. |
December 27, 1997 |
The Assembly-Command Ship has come to Kanonersky shipyard. |
January - June, 1998 |
Outfitting of the Assembly-Command Ship at Kanonersky shipyard with Rocket Segment systems and equipment and completion
of work on marine equipment. |
April 1998 |
Sea Launch Company has performed at PO Yuzhmashzavod and RSC Energia the technical acceptance of the manufactured
first flight unit of Zenit-2S Launch Vehicle and Block DМ-SL Upper Stage. |
May 1998 |
Work at Saint-Petersburg Port aboard the Assembly-Command Ship: debugging of handling operations using a Zenit-2S
Launch Vehicle mockup, loading of two units of Zenit-2S Launch Vehicle and Block DM-SL Upper Stage. |
June 1998 |
The basic work on additional outfitting of the Launch Platform with Rocket segment systems and equipment is complete. |