Land Launch Project
Complex Content
Technical Complexes and Fueling Station
Technical Complex for the Zenit TM LV/ILV Processing
The Zenit TM technical complex includes LV assembly & testing facilities envisaged for LV stages reception, storage, servicing, autonomous assembly and testing; LV mating with the Ascent Unit with formation of the Integrated Launch Vehicle; ILV integrated electrical tests and its loading to the transporter-erector before roll-out to the launch complex for launch.
Main Characteristics of the Zenit TM Technical Complex
Factor name |
Value |
Number of work stations at ATF |
1 |
Maximum production rate
(number of ILV prepared for launch), pc/year |
up to 12 |
Duration of the Zenit-3SLB assembly and processing, days |
~ 35 |
Number of bridge cranes at ATF, pcs |
2 |
Bridge crane load-carrying capacity, t |
50/10 |
Periodicity of maintenance |
once a year |
Clean room for AU processing its mating with LV |
available |
Class of air cleanliness in rooms ?1 and clean chamber
per USA FS (GOST 5076-95) |
10000 (Р8) |
Technical Complex for US Processing
The technical complex for the Upper Stage processing is envisaged for storage, autonomous preparation and verification of Block DM-SLB before its delivery to the fueling station.
Technical Complex for SC/AU Processing and Fueling Station
The technical complex and fueling station are intended for SC processing, US and SC fueling, pressurization, pyros preparation and AU assembly.