Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.energia.ru/en/iss/vkd/vkd2015.html
Дата изменения: Unknown
Дата индексирования: Sun Apr 10 01:14:30 2016
Кодировка: Windows-1251

Поисковые слова: р п р п р п р п р р п п р п п р р п р п п р п
S.P. Korolev RSC Energia - International Space Station
 Русский

Cronology of Extravehicular Activity

? Space Flight Members Started and Ended (UTC) Duration, Criterion The EVA tasks and features
185 ISS
Expedition ISS-42
EVA-1
(from the Quest module)
B. Wilmore
T. Virts
12 h 44 min

19 h 17 min
February 21, 2015
6 h 33 min
(from the opening to the closure of the exit hatch)
Routing power and data cables on pressurized mating adapter PMA2 in the nose part of the ISS USOS Node2 required to install the International Docking Assembly IDA-1 on Node 2 PMA2.
186 ISS
Expedition ISS-42
EVA-2
(from the Quest module)
B. Wilmore
T. Virts
11 h 45 min

18 h 29 min
February 25, 2015
6 h 44 min
(from the opening to the closure of the exit hatch)
Removing the pressurized mating adapter PMA2 cover to install Docking assembly IDA 1. Completing routing of IPIM cables associated with IDA 1. Lubricating Latching End Effector (LEE A) (ball screws and grooves). Clearing CBM capture latches on the nose part of Node3 to prepare for PMM relocation. Removing NPV valve and handrail on module Node3.
187 ISS
Expedition ISS-42
EVA-3
(from the Quest module)
B. Wilmore
T. Virts
12 h 44 min

17 h 25 min
March 1, 2015
5 h 41 min
(from the opening to the closure of the exit hatch)
Installing equipment on the ISS USOS external surface to activate the communications system for visiting vehicles: (two antennas and two reflectors on truss Р3, two antennas and one reflector on truss S3). Routing antenna cables on trusses Р3, S3. Returning two mates GTEC to the ISS (additionally performed).
188 ISS
Expedition ISS-44
EVA-1
(from the Pirs module)
G.I. Padalka
M.B. Kornienko
17 h 19 min

22 h 50 min
August 10, 2015
5 h 31 min
(from the opening to the closure of the exit hatch)
Installation of soft handrails on Zvezda module, eplacement of PCE AFD WAL6 antenna (plane II, SM WC small diameter), cleaning of window #2 (plane IV, SM WC), installation of antennas PCE AFD WAL1-WAL5 protective caps, imagery of science hardware Expose-R, removal of sensor unit of experiment Obstanovka on SM and its delivery to CO1, wipe sampling t from SA-IV, radiator panel of WC small diameter, plane IV and near the drainage valves of system Vozdukh and Electron (SE Test), photography of the Electron system union, changing of orientation of pressure monitoring unit on MRM2 Poisk, imagery of external surface of the ISS RS.
189 ISS
Expedition
ISS-45
EVA-1
(from the Quest module)
S. Kelly
K. Lindgren
15 min 10 min

21 min 26 min
October 28, 2015
7 h 16 min
(from the opening to the closure of the exit hatch)
Laying two cables for the future docking port for US spacecraft, Canadarm-2 robotic arm lubrication, installation of a thermal blanket onto magnetic alfa-spectrometer AMS.
190 ISS
Expedition ISS-45
EVA-2
(from the Quest module)
S. Kelly
K. Lindgren
14 h 22 min

22 h 10 min
November 28, 2015
7 h 48 min
(from the opening to the closure of the exit hatch)
Reconfiguring the cooling system of the P6 truss.
191 ISS
Expedition ISS-46
EVA-1
(from the Quest module)
S. Kelly
T. Kopra
15 h 45 min

19 h 01 min
December 21, 2015
3 h 16 min
(from the opening to the closure of the exit hatch)
Relocation of the stuck mobile transporter to a required position to prepare the Station for receiving Progress MC cargo