Space Flight |
Members |
Started and Ended (UTC) |
Duration, Criterion |
The EVA tasks and features |
185 |
ISS Expedition ISS-42 EVA-1 (from the Quest module) |
B. Wilmore T. Virts |
12 h 44 min 19 h 17 min February 21, 2015 |
6 h 33 min (from the opening to the closure of the exit hatch) |
Routing power and data cables on pressurized mating adapter PMA2 in the nose part of the ISS USOS Node2 required to install the International Docking Assembly IDA-1 on Node 2 PMA2. |
186 |
ISS Expedition ISS-42 EVA-2 (from the Quest module) |
B. Wilmore T. Virts |
11 h 45 min 18 h 29 min February 25, 2015 |
6 h 44 min (from the opening to the closure of the exit hatch) |
Removing the pressurized mating adapter PMA2 cover to install Docking assembly IDA 1. Completing routing of IPIM cables associated with IDA 1. Lubricating Latching End Effector (LEE A) (ball screws and grooves). Clearing CBM capture latches on the nose part of Node3 to prepare for PMM relocation. Removing NPV valve and handrail on module Node3. |
187 |
ISS Expedition ISS-42 EVA-3 (from the Quest module) |
B. Wilmore T. Virts |
12 h 44 min 17 h 25 min March 1, 2015 |
5 h 41 min (from the opening to the closure of the exit hatch) |
Installing equipment on the ISS USOS external surface to activate the communications system for visiting vehicles: (two antennas and two reflectors on truss Р3, two antennas and one reflector on truss S3). Routing antenna cables on trusses Р3, S3. Returning two mates GTEC to the ISS (additionally performed). |
188 |
ISS Expedition ISS-44 EVA-1 (from the Pirs module) |
G.I. Padalka M.B. Kornienko |
17 h 19 min 22 h 50 min August 10, 2015 |
5 h 31 min (from the opening to the closure of the exit hatch) |
Installation of soft handrails on Zvezda module, eplacement of PCE AFD WAL6 antenna (plane II, SM WC small diameter), cleaning of window #2 (plane IV, SM WC), installation of antennas PCE AFD WAL1-WAL5 protective caps, imagery of science hardware Expose-R, removal of sensor unit of experiment Obstanovka on SM and its delivery to CO1, wipe sampling t from SA-IV, radiator panel of WC small diameter, plane IV and near the drainage valves of system Vozdukh and Electron (SE Test), photography of the Electron system union, changing of orientation of pressure monitoring unit on MRM2 Poisk, imagery of external surface of the ISS RS. |
189 |
ISS Expedition ISS-45 EVA-1 (from the Quest module) |
S. Kelly K. Lindgren |
15 min 10 min 21 min 26 min October 28, 2015 |
7 h 16 min (from the opening to the closure of the exit hatch) |
Laying two cables for the future docking port for US spacecraft, Canadarm-2 robotic arm lubrication, installation of a thermal blanket onto magnetic alfa-spectrometer AMS. |
190 |
ISS Expedition ISS-45 EVA-2 (from the Quest module) |
S. Kelly K. Lindgren |
14 h 22 min 22 h 10 min November 28, 2015 |
7 h 48 min (from the opening to the closure of the exit hatch) |
Reconfiguring the cooling system of the P6 truss. |
191 |
ISS Expedition ISS-46 EVA-1 (from the Quest module) |
S. Kelly T. Kopra |
15 h 45 min 19 h 01 min December 21, 2015 |
3 h 16 min (from the opening to the closure of the exit hatch) |
Relocation of the stuck mobile transporter to a required position to prepare the Station for receiving Progress MC cargo |