Recent Changes
edit SideBar
|
VLBI teleconference, Friday 08 November 2013
02:30 UT - 10:30 Perth, 13:30 AEST, 15:30 New Zealand
Phone:
Vic: | 03 9545 8222 |
NSW: | 02 9490 8022 |
ACT: | 02 6276 6622 |
Qld: | 07 3214 2311 |
WA: | 08 6436 8844 |
SA: | 08 8273 8122 |
NT: | 08 8944 8488 |
Tas: | 03 6232 5188 |
Meeting ID: 9690
Chair: Tasso Tzioumis
Attendance: Cormac Reynolds (Curtin); Tasso Tzioumis, Chris Phillips, Phil Edwards, Jamie Stevens (CASS); Shinji Horiuchi (ATDSCC); Jamie McCallum, Brett Reid, Simon Ellingsen (UTas); Oleg Titov(GA)
Apologies: Ioannis Gonidakis
Agenda
- Next LBA session 18-26 November 2013
- Block schedule
- Detailed schedules
- Telescope availability/issues
- ATNF
- UTAS & AuScope
- WW
- South Africa
- People availability
- SOC remote observing
- Monitoring
- Disks
- Correlator
- Real-time fringe tests
- Tests
- Xcube testing
- KVN tests?
- Other testing
- Upcoming RadioAstron observations ?
- Future LBA session(s)
- Korea VLBI technical meeting 10-12 Oct 2013
- Reports and Actions arising
- DiFX technical meeting 14-18 Oct, Korea
- Reports and Actions arising
- e-VLBI developments/demos
- Future plans: LBA wide-banding?
- Xcube tests
- telescope issues
- correlator issues
- e-VLBI
- Next Ops meeting - 11-12 February 2014
- Organise scientific meeting in Northern Territory in 2014?
- Review of Actions from meeting on 27 August 2013
- AOB
Actions arising
CARRIED FORWARD/UPDATED/CONTINUING
- LBA data archive consolidation and copy at CASS. (CASS, Curtin)
- LBA data archive. Need ATNF disk space (Chris,Tasso, Shaun) Continuing
- ATCA phasing. Check performance and implementation (Jamie S, Richard) Updated
- Definitely need >200 mJy calibrators. Stress in documentation. (ATNF)
- Ask PIs to nominate phase-cals and check fluxes BEFORE scheduled observations (Phil, Jasmie S)
- Extract phasecals from Vex files and check at ATCA before run (Chris, Jamie S.)
- ATCA Tsys via CABB (CASS) Updated
- Consult with Carrad and Sault about Tsys implementation on the CABB (Tasso)
- Observer training and remote observing (Tasso) Continuing
- Wiki logs (All) Continuing
- Log transfers quickly to FTP area and/or Wiki (ALL) Continuing
- Annual "best" wiki-log competition. To be judged by correlator at annual Ops meeting. (Cormac)
- Pawsey centre access for VLBI and eVLBI (Chris, Cormac) Continuing
- Linear to Circular polarisation conversion. (Chris, Richard, Cormac) Continuing
- Monitoring "check-list" for ATNF telescopes (Chris, Jamie S) Continuing
- For ATCA include in Wiki log: ref ant, pad, tied-array. Default ant03 on W104. (Jamie S, ALL observers)
- Implement "intents" keyword from Vex schedule into ATNF schedules for auto-phasing (Jamie, Chris) Continuing
- Curtin Xcube testing. Unit install at ASKAP. (Chris, Cormac, Tasso) Continuing
- Onsource info from ATCA. Fix cgi scripts (Chris) Continuing
- DA role during LBA sessions (Phil, Tasso, Jamie S)
- Procedures for raising Ho observers on Skype. Telephone? (UTas)
- Implement lists on Skype and/or Wiki for observers(ATNF)
- Get Ww FS log comments onto Wiki. Use UTas "floggit" script and automate? (Stuart, Chris, Jamie M.)
- Need VSIC remote switch for Tid to avoid cable problems.
- Cables needed from ATNF (Chris, Jamie S.)
- Fix recmon to track correct experiment name, especially due complex recordings for Ellingsen (Chris, Jamie S)
- List Mk5 rtfc times for each observation from schedules (Cormac, Chris)
- Arrange support for spacecraft observations on 29 Dec. (ATNF)
NEW ACTION ITEMS
- Check disk packs at narrabri and whether more are needed for emergency disk usage (Jamie S, Chris)
- Check Mp at 22 and 32 GHz for coherence and fringes (Chris, Jamie S, Tasso, Phil)
- Need Mp visit to setup K-band
- Check re moisture in mm-Rx window.
- Encourage and train PIs and CoIs for VLBI observing (Tasso)
- RadioAstron schedules and check setups (Chris)
- Mk5C test with Tid (Chris, Shinji)
- Use new numbers for ATCA (4077 for DA; 4078 for Observer)
STANDING ACTION ITEMS
- Plan for replacements of old LBA DAS and some failing recorders.
- Plans to replace at each station (UTas, CASS)
- Next LBA Ops meeting 11-12 Feb 2014 at Curtin.
- Draft block program and speakers before Xams (Tasso)
- Book hotels early. List on Wiki. (ALL)
- Prepare for Feb-March 2014 runs around VSOP sessions. 2-3 days every 9 days. 4 runs (21/2, 2/3, 10/3, 17/3) - ALL
- VLBI science meeting in 2014 at Darwin/Katherine
- Setup LOC, SOC (Tasso, Jim)
Next meeting: TBD. After LBA session. 3 Dec 2013.
|