VLBI teleconference, Tuesday 03 December 2013
02:30 UT - 10:30 Perth, 13:30 AEST, 15:30 New Zealand
Phones: **NEW PHONE NUMBERS**
ACT: | 02 6276 2888 |
NSW: | 02 9490 8088 |
Vic: | 03 9545 8088 |
WA: | 08 6436 8688 |
SA: | 08 8305 0688 |
Tas: | 03 6232 5088 |
International | +61 2 6276 2888 |
Meeting ID: 6869
Chair: Tasso Tzioumis
Attendance: Cormac Reynolds, Hayley Bignall (Curtin); Tasso Tzioumis, Chris Phillips, Phil Edwards, Ioannis Gonidakis, Jamie Stevens (CASS); Shinji Horiuchi (ATDSCC); Jamie McCallum, Brett Reid (UTas); Oleg Titov(GA)
Apologies: Simon Ellingsen
Agenda
- Debrief 18-26 November 2013 LBA session
- Telescope issues
- ATNF
- UTAS
- South Africa
- Tid
- SOC remote observing
- Monitoring
- Disks
- Correlator
- Real-time fringe tests
- Tests
- 32 GHz testing
- KVN tests
- Xcube testing
- Other testing
- Next LBA session(s)
- Upcoming RadioAstron observations
- e-VLBI developments/demos
- Future plans: LBA wide-banding?
- Xcube tests
- telescope issues
- correlator issues
- e-VLBI
- Next Ops meeting - 11-12 February 2014
- Organise scientific meeting in Northern Territory in 2014/2015 ?
- Review of Actions from meeting on 08 November 2013
- AOB
Actions arising
CARRIED FORWARD/UPDATED/CONTINUING
- LBA data archive consolidation and copy at CASS. (CASS, Curtin)
- LBA data archive. Need ATNF disk space (Chris,Tasso, Shaun) Continuing
- ATCA phasing. Check performance and implementation (Jamie S, Richard) Updated
- Definitely need >200 mJy calibrators. Stress in documentation. (ATNF)
- Ask PIs to nominate phase-cals and check fluxes BEFORE scheduled observations (Phil, Jasmie S)
- Extract phasecals from Vex files and check at ATCA before run (Chris, Jamie S.)
- Need at least 6 cycles for auto-phase = 30secs if 5sec integration.
- Phase-impact on pahse-ref and claibration? Phase jumps?
- consult with Ojha re auto-phasecal for TANAMI (ATNF)
- ATCA Tsys via CABB (CASS) Updated
- Consult with Carrad and Sault about Tsys implementation on the CABB (Tasso)
- Observer training and remote observing (Tasso) Continuing
- Wiki logs (All) Continuing
- Log transfers quickly to FTP area and/or Wiki (ALL) Continuing
- Annual "best" wiki-log competition. To be judged by correlator at annual Ops meeting. (Cormac)
- Pawsey centre access for VLBI and eVLBI (Chris, Cormac) Continuing
- Linear to Circular polarisation conversion. (Chris, Richard, Cormac) Continuing
- Monitoring "check-list" for ATNF telescopes (Chris, Jamie S) Continuing
- For ATCA include in Wiki log: ref ant, pad, tied-array. Default ant03 on W104. (Jamie S, ALL observers)
- Implement "intents" keyword from Vex schedule into ATNF schedules for auto-phasing (Jamie, Chris) Continuing
- Curtin Xcube testing. Unit install at ASKAP. (Chris, Cormac, Tasso) Continuing
- Onsource info from ATCA. Fix cgi scripts (Chris) Continuing
- DA role during LBA sessions (Phil, Tasso, Jamie S)
- Procedures for raising Ho observers on Skype. Telephone? (UTas)
- Implement lists on Skype and/or Wiki for observers(ATNF)
- Get Ww FS log comments onto Wiki. Use UTas "floggit" script and automate? (Stuart, Chris, Jamie M.)
- Fix recmon to track correct experiment name, especially due complex recordings for Ellingsen (Chris, Jamie S)
- List Mk5 rtfc times for each observation from schedules (Cormac, Chris)
- Encourage and train PIs and CoIs for VLBI observing (Tasso)
- RadioAstron schedules and check setups (Chris)
- Mk5C test with Tid (Chris, Shinji)
- Use new numbers for ATCA (4077 for DA; 4078 for Observer)
NEW ACTION ITEMS
- ATCA and Mp 7mm LO setup offsets
- Check if KVN tests affected. (Chris)
- Fix Mp losetup (MJK)
- ASKAP web monitoring
- For wideband systems more efficient to stop data recording in slews/stops AND better effieciency in correlator.
- Future for LBA recorders. Discuss at LBA-ops mtg (LBA)
- Cd upgrades
- DAS replacement by dBBc (UTas).
- L-band sensitivity measurements? (UTas)
- Tid tests for JPL DAS and Mk5c recorder
- Let JPL know re VDIF format (Chris)
- Web monitoring? Ports?
- ASKAP VLBI monitoring (Chris, Jamie S)
- KVN tests
- 40/80 GHz possible? Test.
- Proposal from Richard.
- Xcube testing (Chris)
- CABB wide-band proges?
- Email Tim Bateman and get report (Tasso)
STANDING ACTION ITEMS
- Plan for replacements of old LBA DAS and some failing recorders.
- Plans to replace at each station (UTas, CASS)
- Next LBA Ops meeting 11-12 Feb 2014 at Curtin.
- Draft block program and speakers before Xmas (Tasso)
- Book hotels early. List on Wiki. (ALL)
- Prepare for Feb-March 2014 runs around VSOP sessions. 2-3 days every 9 days. 4 runs (21/2, 2/3, 10/3, 17/3) - ALL
- VLBI science meeting in 2015 at Darwin/Katherine (NB. Now in 2015!!)
- Setup LOC, SOC (Tasso, Jim)
Next meeting: TBD (Feb 2014)