VLBI teleconference, 04 August 2010
12.00 Perth, 14.00 Eastern, 16.00 New Zealand
Phone:
Vic: | 03 9545 8222 |
NSW: | 02 9490 8022 |
ACT: | 02 6276 6622 |
Qld: | 07 3214 2311 |
WA: | 08 6436 8844 |
SA: | 08 8273 8122 |
NT: | 08 8944 8488 |
Tas: | 03 6232 5188 |
Meeting ID: 4554
Chair: Tasso Tzioumis
Attendance: Cormac Reynolds, Hayley Bignall(Curtin); Tasso Tzioumis, Chris Phillips, Phil Edwards, John Reynolds (ATNF Marsfield); Jamie Stevens (ATNF, Narrabri); Jamie McCallum, Brett Reid (UTas, Mt Pleasant); Richard Dodson, Maria Rioja (UWA); Shinji Horiuchi (SDCCC, Canberra)
Apologies: Steven Tingay, Randall Wayth (Curtin); Simon Ellingsen (UTas); Tim Natush, Sergei Gulyaev (Auckland); Jonathan Quick (Hart)
Agenda
- Debrief from VLBI session July (22-27) & ToOs
- ATNF
- UTas
- Tid
- Data transfers
- IKAROS observations
- General comments
- Reports from observatories & correlator(s)
- ATNF
- UTas
- Curtin
- Tid
- NZ
- AuScope
- Hart
- Next session(s) for VLBI
- Proposals & scheduling
- Issues
- * Review of Actions from last meeting 09 July 2010
- Any other issues
Actions arising
CARRIED FORWARD/UPDATED
- Consolidation of the LBA Archive to include all ATNF + Swinburne + Curtin correlated LBA data. Should also add in eVLBI output data. Maintain complete archives at Curtin and ATNF (ATNF/Curtin)
- ATNF to develop online access to this archive (ATNF) - Continuing
- Implement Mk5b eVLBI operation (Chris) - postponed till Mk5b eVLBI tests are feasible later in the year.
- Mk5b operations at correlator (Curtin) - continuing
- Mk5b test data to Curtin (UTas)
- Test with Mopra (Chris, UTas)
- Parallel LBA amd Mk5 test data (UTas, Cormac) - to be arranged
- Notify WEW of times of any ATCA delay jumps (Correlators)
- Correlate Boolardy geodetic data to get better position, before next session. (Curtin) - in queue
NEW ACTION ITEMS
- Test ATCA data from the vlbi_64_1_tda mode and compare 64 MHz and 1 MHz modes (Jamie S.)
- Guidelines for phasing the atca more often during vlbi observations (ATNF)
- Clarify availability of atca data during VLBI. Include in letter to PIs to allow informed choice (ATNF)
- Inform PIs of ~150ns delay difference in polarizations at the atca (ATNF, Correlator)
- Publicise availability of OH and S-band form next period at atca due to the L/S upgrade.(ATNF)
- UTas is implementing a pre-planning meeting to plan Rx setups and avoid mix-ups. Must have setup instructions at least 2 days before session. (UTas)
- New equipment in Ceduna town to mitigate interference to wi-fi link to the telescope. New 5 GHz wi-fi operation. (UTas)
- Address XRAID issues at Tid. Power-cycle testing and/or upgrade hardware. Swinburne could be source of XRAID. (Shinji, Chris)
- Urgent input to JPL re Tid scheduling beyond 25 Oct. (Shinji, Phil)
- Check cx016b data and correlate full dataset when all data at Curtin. (Correlator)
- Implement upgrade for programmable cable changes on VLBI DAS. Testing needed. (Chris, Jamie S)
- Fix faulty CAVE nodes (04 and 07) - (Chris)
- Test Mp lo_setup after synthesiser upgrade. Test cm observation online and need full test for K-band (ATNF, Tasso)
Next meeting: TBD ---> 10 November 2010.