Recent Changes
edit SideBar
|
VLBI teleconference, Thursday 27 March 2014
02:30 UT - 10:30 Perth, 13:30 AEST, 15:30 New Zealand
ACT: | 02 6276 2888 |
NSW: | 02 9490 8088 |
Vic: | 03 9545 8088 |
WA: | 08 6436 8688 |
SA: | 08 8305 0688 |
Tas: | 03 6232 5088 |
International | +61 2 6276 2888 |
Meeting ID: 4698
Chair: Tasso Tzioumis
Attendance: Attendance: Cormac Reynolds, Hayley Bignall (Curtin); Tasso Tzioumis, Chris Phillips, Phil Edwards, Jamie Stevens (CASS); Shinji Horiuchi (ATDSCC); Jamie McCallum, Simon Ellingsen (UTas); Oleg Titov(GA)
Apologies:
Agenda
- Debrief Feb - Mar 2014 LBA sessions
- Telescope issues
- UTAS
- ATNF
- Tid
- South Africa
- SOC remote observing
- Monitoring
- Disks
- Correlator
- Real-time fringe tests
- Tests
- 32 GHz observing?
- Xcube testing
- Other testing
- Next LBA session(s)
- Short LBA sessions
- 3 April
- 30 April
- June 2014 - long sessions
- Upcoming RadioAstron observations
- e-VLBI developments/demos
- Future plans: LBA wide-banding?
- Xcube tests
- telescope issues
- correlator issues
- e-VLBI
- Organise scientific meeting in Northern Territory in 2014/2015 ?
- Review of Actions from meeting on 03 December 2013
- AOB
Actions arising
CARRIED FORWARD/UPDATED/CONTINUING
- LBA data archive consolidation and copy at CASS. (CASS, Curtin)
- LBA data archive. Need ATNF disk space (Chris,Tasso, Shaun) Continuing
- ATCA phasing. Check performance and implementation (Jamie S, Richard) Updated
- Definitely need >200 mJy calibrators. Stress in documentation. (ATNF)
- Ask PIs to nominate phase-cals and check fluxes BEFORE scheduled observations (Phil, Jasmie S)
- Extract phase-cals from Vex files and check at ATCA before run (Chris, Jamie S.)
- Need at least 6 cycles for auto-phase = 30secs if 5sec integration.
- Phase-impact on phase-ref and calibration? Phase jumps?
- consult with Ojha re auto-phasecal for TANAMI (ATNF)
- ATCA Tsys via CABB (CASS) Updated
- Consult with Carrad and Sault about Tsys implementation on the CABB (Tasso)
- Observer training and remote observing (Tasso) Continuing
- Wiki logs (All) Continuing
- Log transfers quickly to FTP area and/or Wiki (ALL) Continuing
- Annual "best" wiki-log competition. To be judged by correlator at annual Ops meetings. (Cormac)
- Pawsey centre access for VLBI and eVLBI (Chris, Cormac) Continuing
- Linear to Circular polarisation conversion. (Chris, Richard, Cormac) Continuing
- Monitoring "check-list" for ATNF telescopes (Chris, Jamie S) Continuing
- For ATCA include in Wiki log: ref ant, pad, tied-array. Default ant03 on W104. (Jamie S, ALL observers)
- Curtin Xcube testing. Unit installe at ASKAP. Commission. (Chris, Cormac, Tasso) Continuing
- On-source info from ATCA. Fix cgi scripts (Chris) Continuing
- DA role during LBA sessions (Phil, Tasso, Jamie S)
- Procedures for raising Ho observers on Skype. Telephone? (UTas)
- Implement lists on Skype and/or Wiki for observers(ATNF)
- Get Ww FS log comments onto Wiki. Use UTas "floggit" script and automate? (Stuart, Chris, Jamie M.)
- Fix recmon to track correct experiment name, especially due complex recordings for Ellingsen (Chris, Jamie S)
- List Mk5 rtfc times for each observation from schedules (Cormac, Chris)
- RadioAstron schedules and check setups (Chris)
- Use new numbers for ATCA (4077 for DA; 4078 for Observer)
- For wideband systems more efficient to stop data recording in slews/stops AND better effieciency in correlator.
- Cd upgrades
- DAS replacement by dBBc (UTas).
- L-band sensitivity measurements. (UTas)
- Tid tests for JPL DAS and Mk5c recorder
- Let JPL know re VDIF format (Chris)
- Web monitoring? Ports?
- ASKAP VLBI monitoring (Chris, Jamie S)
- Xcube testing (Chris)
- CABB wide-band proges?
- Email Tim Bateman and get report (Tasso)
NEW ACTION ITEMS
- Cd drive-PC. Fix in short-term. Replace long-term? (UTas)
- Ho, Cd need setup information early. Problems when schedules are late. (Phil, UTas)
- Ensure correct wraps and limits are supported in Vex, especially for At and Mp. (ATNF, Cormac)
- Setup of circ pol hybrids at Mp. Need to tweak (ATNF)
- Tsys logs from Mp may be wrong if polarisation hybrid not setup properly. Need to average the 2 channels (ATNF)
- Mp L-band and X-band low power and no atten to adjust. Check with Jock (ATNF)
- Pks update of documentation. Polarisations are usually swapped. (ATNF, JER)
- Pkvsi1 and pam-store disks dead! Check re backups (ATNF)
- Antenna positions at ASKAP. May need geodetic run for new antenna. (ATNF, JER)
- Train/qualify more PIs for ATNF remote observing (ATNF)
- Investigate more remobs for UTas telescopes (UTas, ATNF)
- Streamline monitoring. Check ssh tunnel setups. (Jamie + Jamie, Chris)
- Disks to Cd )Hayley)
- grid-ftp on Cortex. Move to new systems (Cormac)
- Supercomputer for DiFX. Approved. Initiate port. (Cormac)
- Coordinate data transfers so full experiments are ready for correlation (All, Hayley)
- Liaise with Ojha re auto-pcal in his observations (ATNF)
STANDING ACTION ITEMS
- Plan for replacements of old LBA DAS and some failing recorders.
- Plans to replace at each station (UTas, CASS)
- VLBI science meeting in 2015 at Darwin/Katherine (NB. Now in 2015!!)
- Setup LOC, SOC (Tasso, Jim)
Next meeting: TBD
|