Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.atnf.csiro.au/vlbi/wiki/index.php?n=Main.ActionsLBA-Ops-2014
Дата изменения: Unknown
Дата индексирования: Tue Apr 12 17:57:00 2016
Кодировка:

Поисковые слова: р п р п р п р п р п р п р п р п
VLBI Wiki | Main / ActionsLBA-Ops-2014
Recent Changes - Search:

Recent Changes

edit SideBar

ActionsLBA-Ops-2014

VLBI/eVLBI operations and technical meeting, Perth, 11-12 Feb 2014'


ACTIONS list

The ordering of this action list roughly follows the agenda of the meeting. Some actions were carried forward and modified from the previous meeting(s). A consolidated and integrated list is given here.

  1. ACTION: Proposals and scheduling
    • Monitor available LBA time and over-subscription (Phil) - CONTinuing
    • Increase LBA time? (Phil) - CONT
    • Encourage more ToOs qnd NAPAs(ATNF) - CONT
      • Insert sentence re ToO and NAPA in call for proposals (Phil)
    • More sessions of fewer days (e.g methanol cadence)? Produce early schedules and information. (Phil) - CONT
    • Sessions spread out in time. Eases observing and correlation (ATNF)
    • Offer Mk5 subnet recording alternative with higher-BW in call for proposals (ATNF) - CONT
    • Offer GRB transient monitoring on LBA subnet i.e. Ho, Ww, Ak, Mp ? (LBA)
    • Arrange EVN + LBA sessions.
  2. ACTION: SCHED issues
    • Keep PIs informed on SCHED developments (Cormac,Phil) - CONT
    • Cal flags in SCHED? Update sources.dat file with calibrator flags (Cormac,Chris) - CONT
      • fringe-finders; phase reference sources; calibrators on long baselines; new calibrators via eVLBI
      • ATCA developments for flag support (Jamie, Chris)
      • VEX2 implementation for flags (Cormac, Chris)
      • Flags in pipeline processing (Chris, Cormac)
    • Support in SCHED for new DAS - CONT
      • Xcube in SCHED (Chris)
      • Ensure consistent IF wiring for LBA obs by UTas and WW (UTas and AUT)
      • Check catalogues in SCHED and let Cormac know of issues (All)
      • Check on Mk5B format for LBA (Cormac)
      • VDIF code in SCHED (Chris, Cormac)
      • JPL format support (Cormac)
      • SCHED support after Craif Walker's retirement? (LBA, JIVE, KVN, CVN)
  3. ACTION: Wiki/Web
    • Continuing Wiki reorganisation/maintenance for accessibility (Chris,Cormac) - CONT
    • Automate creation of Tsys and flagging files on Wiki (Cormac,Chris)
    • Link Ho, Cd and Ww cal files to wiki (Cormac)
    • Development of Ww noise cal systems and logs (NZ, LBA)
    • Calibration data instructions on Wiki (Hayley) - CONT
    • Wiki "web-service"?
      • LBA monitor interface (Chris, Jamie, Cormac)
      • "chat" channel for important messages during observing?
      • "Google calendar" alarms?
  4. ACTION: Observing and monitoring
    • Ww Tsys monitoring (NZ)
    • Better LBA monitoring
      • Monica alarm functionality coordination at observatories (LBA)
      • Firewall issues with NZ (AUT, Chris)
    • Utilise all available time at Tid (Shinji, ATNF) - CONT
    • Get Parkes calibration data (Tasso, JER, Ettore) - CONT
    • Get Tsys data on ATCA (Chris, Tasso) - CONT
      • Tsys from ATCA data via Miriad? (ATNF)
    • Mopra Tsys processing (Tasso, Jamie)
    • ATCA Array phasing issues (Chris, Jamie, Tasso) -CONT
      • Ensure ABphase set when autophase on (Chris)
      • Show ABphase on Wiki (Chris)
    • Update notes on CABB gain equalisation via sampler stats (Jamie S)
    • Monitor H-maser rate at ASKAP (ATNF) - CONT
    • Move Cd to dBBC and Mk5c (UTas)
    • Determine Frequency to Channel mapping at Tid (Shinji)
    • Xcube in real-time fringe checker (Chris)
  5. ACTION: Continue wiki contest for best logs (LBA)
    • Winners for 2013: 1st - Tid; 2nd - UTas; 3rd - ATNF
  6. ACTION: eVLBI pointing for Ww (Chris, Cormac, Jamie M, NZ) - CONT
  7. ACTION: Data storage and transfers
    • Review data transfer options - CONT
    • Spare Mk5 to Geraldton for Ye data transfers? (AuScope, ATNF)
    • rsync to PBStore and check transfers.
    • Investigate 10 Gbps links at UTas. (UTas)
    • Investigate feasibility of centralised data transfer (LBA)
    • Setup Radioastron data transfers via PBStore (Chris)
    • Thank J. Quick for excellent Hart data transfers. 9LBA)
  8. ACTION: Correlators
    • Advance warning (in proposal) to correlator of technical requirements of observations (PIs) - CONT
    • Feedback from PIs. Add to PI letter from correlator(Correlator, PIs)
    • Pipeline imaging (Cormac, Chris)
      • Reduction pipeline on Cave for e-VLBI (Chris, Cormac) - CONT
      • make pipeline available to PIs? Inform in correlator letter. - CONT
      • Pipeline reduction for cals only - CONT
        • Cal flux-vs-time and compare with ATCA.
        • 1921-293 flux vs ATCA.
        • 1934-638 cal data from ATCA.
      • Telescopes check back in pipeline archive for issues (All telescopes)
    • Document Tsys labelling after correlation for "mixed-mode" observations.
    • Copy LBA data archive to ATNF (Curtin, ATNF) - CONT
      • Integrate with S2 archive (ATNF)
      • Write software to read RPFITS.
      • Get enough disk storage at ATNF (ATNF)
    • LBA archive online via ATOA? (Tasso) - CONT
      • Investigate RPFITS and IDIFITS issues in ATOA (ATNF)
      • IDIFITS reader (Jamie)
      • Metadata transfer and storage? (ATNF)
    • CAL notes on Wiki and inform PIs (LBA) - CONT
    • Aim for ANTAB data at correlator (Curtin, ATNF)
      • Issues of Tsys quality from stations.
    • DiFX on Pawsey computers (Cormac)
      • explore other supercomputer options
      • Investigate eVLBI modes.
    • Linear to circular conversion in DiFX after FFT. Check on ATCA. (Chris)
  9. ACTION: Networks and e-VLBI Demos - CONT
    • Invite IVEC to networking meetings (ATNF)
    • UTas firewall issues (UTas)
    • Overseas telescopes in eVLBI? (Tasso)
      • Indian connectivity? Letter to GMRT re VLBI timing issues (Tasso)
      • Regular Asia eVLBI tests?
      • Malaysia connectivity? (ATNF)
    • Demos
      • ASKAP-KAT7 in eVLBI? -
      • 10 GBps correlation (Chris, Cormac) - CONT
        • Investigate Pawsey and other SPCs in Oz.
        • Telecon within ~6 weeks (Ben, Cormac, Chris)
      • Brazil eVLBI demo? (Tasso)
        • Brazil-SouthAfrica-Oz-Ww-Argentina?
  10. ACTION: e-VLBI developments - CONT
    • Promote eVLBI better (All)
    • eVLBI scheduling (cf EVN of ~10sessions/year) (ATNF)
    • Utilise more e-VLBI test-time (ATNF)
    • Investigate Tid e-VLBI connectivity (Tasso)
  11. ACTION: VLBI/eVLBI technical developments
    • Monitor developments of DBBCs, DBEs etc (All)
      • new DAS?
      • Xcube commissioning
      • Progress in CABB wide-band system (ATNF)
    • Monitor recorder/Disk developments (all)
      • Replacement of LBA recorders/Disks?
    • Cal scheme for linear-circular polarisation conversion (Chris, Cormac)
  12. ACTION: VLBI Science meeting in Darwin/Katherine. Mid-2014? (Tasso, Jim)
  13. ACTION: Next Ops meeting venue at Tidbinbilla (Shinji))
  14. ACTION: Update news page on CSIRO website.
Edit - History - Print - Recent Changes - Search
Page last modified on February 05, 2015, at 06:32 PM