Документ взят из кэша поисковой машины. Адрес
оригинального документа
: http://www.atnf.csiro.au/vlbi/dokuwiki/doku.php/correlator/geo_correlation
Дата изменения: Unknown Дата индексирования: Mon Apr 11 02:54:24 2016 Кодировка: IBM-866 Поисковые слова: galactic cluster |
Mostly, correlation of geodetic data is just as for astronomical data and uses espresso. Some additional considerations are noted below.
Curtin geodetic correlation records spreadsheet. To be kept up to date as experiments are observed/transferred/correlated.
Status of e-transfers from Hobart
Status of e-transfers from Warkworth
Field System logs, .skd and .vex files are available from: ftp://ivs.bkg.bund.de/pub/vlbi/ivsdata/aux/{year}/{expcode}
To get all of the above files (run as corr from cuppa in the experiment directory ~/LBA/{year}/{month}/{expcode}):
wget -t45 -l1 -r -nd ftp://ivs.bkg.bund.de/pub/vlbi/ivsdata/aux/{year}/{expcode}/ -A тАЬ*.*тАЭ
If necessary, run fromdos {vexfile}
to convert to Unix format.
The IVS master schedule, which includes links to station feedback is available from: http://lupus.gsfc.nasa.gov/sess/
A current list of Austral experiments is available on the AuScope VLBI operations wiki at UTas: http://auscope.phys.utas.edu.au/opswiki/doku.php?id=schedules:austral2014
IVS emails (тАЬcompletedтАЭ messages contain log comments with any problems noted etc.): http://lupus.gsfc.nasa.gov/data10/sessions/{year}/{expcode}/maillist.html
Jamie McCallum sends pre-correlation summary emails noting any known problems to the auscope-correlator mailing list.
The following should not be necessary for recent schedules: Edit $TRACKS section of vex file for Mark5B tracks (copy from previous experiments).
Copy .v2d file from a previous experiment, update experiment name, comment out any stations not involved.
Select scans for clock searching; I usually just choose a production job that contains all stations.
When sufficient data are correlated, run difx2fits
and LBA pipeline for clock searching.
For production, DiFX default resolutions (0.5 MHz, 2s integrations) are generally OK.
After production correlation, in the output directory /data/corr/corrdat/{expcode}
, run difx2mark4 -d -e nnnn
where nnnn
is the experiment number; we number the experiments sequentially. For the a13xx experiments, the experiment number is is 1240+xx. The experiment number (mark4 output directory) defaults to 1234 if not specified.
Note that re-running difx2mark4 will add to existing directory (but overwrite a scan if it exists(?)).
The raw output can be tar'ed for distribution (done automatically by archivec.py).
tar cvfz A1306.MARK4.tar.gz 1246
Also run difx2fits
and pipeline (LBA.py) to check the output. For ease of transfer, copy the .vex and .v2d files to the pipeline output area, and create a corr_notes.txt
file (default containing string 'none') to assist with compilation of the correlator report.
NB. As of 15/09/2014 cortex is unavailable for storing new data. The archive has been moved to iVEC's new data store. See the new notes on Archiving LBA or AuScope data products from the correlator.
Archive the output data and pipeline products as usual with:
<code>
archivedifx.py /data/corr/corrdat/{expcode}/ hbignall@cortex.ivec.org/pbstore/groupfs/astrotmp/as03/VLBI/Archive/Curtin/AuScope/{expcode}
gloPut7T.sh /data/corr/pipe/{expcode}/out/ hbignall@cortex.ivec.org /pbstore/groupfs/astrotmp/astronomy/anonymous/{expcode}
</code>
See the new page on distribution of output data to PIs/analysts.
Post-correlation processing is currently done at Hobart.
(To verify in fourfit:
fourfit [options] 1234
Type vhelp fourfit
for help.)
Example of how to account for integer second timing offset problems (as occurred at Katherine in aust25):
Unlike the .v2d file, the .vex can handle different clock offsets at different times. So appending a $CLOCK section to the vex file may be an easier way to account for clock changes, rather than having multiple breaks and setting different clocks in .v2d files. Some useful vex syntax documentation can be found here: https://safe.nrao.edu/wiki/bin/view/VLBA/Vex2doc#A_61_36CLOCK_61_Block
Note: .vex and .v2d files use opposite sign conventions for clock offsets!
The three steps to fix are:
ref $CLOCK = KE;
*----------------------- begin $CLOCK ----------------------* $CLOCK; def KE; * Valid from clock_early clock_early_epoch rate clock_early = 2014y146d07h00m : 6.321 usec : 2014y146d07h00m : 0.0 ; clock_early = 2014y146d13h20m : -999993.679 usec ; *1s offset clock_early = 2014y146d21h01m : -1999993.679 usec ; *2s offset enddef; *----------------------- end $CLOCK ----------------------*
Running difx2mark4 will just put all scans in a single output directory as usual, but running difx2fits on the output will create a new FITS file for each clock change.
Sometimes these FITS files can be joined in the pipeline; just specify for
fits_file
in the pipeline input file all /paths/files separated by commas.
However, if data out of time order errors are seen, it may be necessary to pipeline each FITS file separately. AIPS and the pipeline don't necessarily handle subarrays well. Also, currently the pipeline processes only the first subarray.
[Also note: possible AIPS bug found in aust31 which apparently caused INDXR to enter an infinite loop when two FITS files were combined in the pipeline, and kept writing CL entries until disk was filled. Watch out for thisтАж if it occurs, pipelining the output FITS files separately may be necessary.]