Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.atnf.csiro.au/pub/atnfdocs/proposals/old/pks_applic.ps.MayT00
Дата изменения: Mon Jan 17 06:16:01 2000
Дата индексирования: Wed Dec 26 02:21:29 2007
Кодировка:

Поисковые слова: eridanus
PKS
yr,term: 2000MAYT
ATNF use
ident:
rcvd:
AUSTRALIA TELESCOPE OBSERVING APPLICATION
PARKES TELESCOPE
SEND TO: Director, ATNF, P.O. Box 76, Epping, NSW 2121, Australia
For ATNF information see : http://www.atnf.csiro.au
1. Title of proposal:
2. Authors Institution/Country for Ph.D. Present at
Principal investigator on line 1 thesis ? Parkes ?
3. Contact author and mailing address:
phone: FAX: e-mail:
4. Continuation or resubmission of previous proposal? Previous proposal no:
Related ATNF proposal numbers (if any):
5. Scienti c categories: Solar System Stellar Galactic Mag. Clouds Extragalactic
6. Type of observation: Continuum Spectral line Point source Mapping
Monitoring Time binning High time resol. Survey
Lin pol Cir pol Solar Multibeam
7. Receiver(s):
8. Sidereal time range (please state):
9. Requested time this Term (hours or days y ): Minimum useful time (hr or d):
Estimated time to complete this project (hr or d) : Time allocated so far (hr or d):
(including above)
y \day" here denotes a unit of 24 hours, rather than an elapsed period of 24 hours.
10. Number of publications to date from this proposal? (List separately)
11. Short summary of proposal (150 words, minimum font size 8 point):
When your proposal is scheduled the contents of this application form (but not supporting material) will be made public.
This L A T E X form was generated by the author on January 17, 2000

PKS
Title of Proposal:
12. Please indicate the amount of additional help required:
None Consultation Friend (Epping: initial assistance with data reduction)
Observing assistance Sta Collaborator
13. Spectroscopy only: Line 1 Line 2 Line 3
transitions to be observed
velocity range (km s 1 )
number of channels per spectrum
approx observing frequency
number of simultaneous spectra
total bandwidth [MHz]
receiver tuning range
14. Back End System:
15. Feed(s):
16. Focal plane/vertex arrangements:
17. Computer programs:
18. Consumables (eg mag tape):
19. Number of sources: [If more than 6 sources, please attach list. If more than 30 give
only selection criteria and LST range(s)]
20. Name
[order of priority]
Coordinates (J2000)
RA DEC
(h,m) ( ф , 0 )
Band
(cm)
Intensity (cont)
total peak
(Jy) (mJy)
rms noise
required
(mJy)
Cal.
size
(Jy)
Possible
LST range
h ) h
Time
requested
(hr)
21. Special hardware, software or operating requirements:
22. Non-standard equipment supplied by user: (by arrangement, OIC, Parkes Observatory)
23. Preferred range of dates for scheduling:
24. Unsuitable dates:
25. Attach a scienti c justi cation. Maximum length 3 pages (incl. gures). Minimum font size 10 point.
pks applic.tex
2