Future ATNF Operations
Dave McConnell 6 November 2007


By 2012, the Australia Telescope National Facility will be operating four world-class observatories ensuring its continued status as a leading global contributor to the understanding of the universe.

Establish integrated operation of all four ATNF telescopes
1. Restructure into Science Operations & Engineering Operations 2. Establish Science Operations Centre (SOC) at central location (initially Marsfield) 3. Streamline supported modes according to scientific priorities
2


Development Projects
· Automation · Telescope safety · Scheduling · SOC facility

3


Science Operations Engineering Operations
Telescopes & Systems

National Facility Operations

Science Operations

Scientific services Computing infrastructure Scientific software & Archives Visitor services Receivers, LO, conversion

Engineering Operations

Digital, servo Cryogenics Mechanical, Drives & Electrical

4


Science Operations Centre
· · · · · Initially located at Marsfield Retain "User/Operator" model (except ASKAP) Fully supported observing available at SOC only When necessary, observations will be possible from the observatories. Comprehensive computer, visual and auditory monitoring

5


Streamlining operations
· · · ·
Synchronise schedules Reduce the frequency of CA reconfigurations and Parkes receiver changes Limit the range of instrumentation Limit availability of telescope time

6


Scheduling scheme
Parkes ATCA Mopra
Week 1 2 3 4 5 6 7 8 9

Maintenance


Sample one-year Parkes receiver schedule
Q1
10/50 20cm MB H-OH 2.3GHz 8GHz 12mm

Q2

Q3

Q4

1 year


Instruments to be decommissioned?
What 70 cm receiver Methanol receiver (6/12GHz) 1.3cm receiver WideBand Correlator S2 VLBI recorders Mark3A VLBI recorder AT Correlator Analogue Filter Bank Methanol Multibeam Where Parkes Parkes Parkes (replaced by new 12mm Parkes Parkes, ATCA, Mopra Parkes Parkes, ATCA, Mopra Parkes Parkes (send to JB)
rx)

When 2007 2007 2007 2007 2007 2007 2008 2008 2010


ATNF instrumentation
2006 - 2010
2006
ATCA
20/13cm (1.25-1.8, 2.2-2.5 GHz) 1.2-3.0 GHz [600MHz bw:2GHz bw ] 6/3cm (4.4-6.9, 8.0-9.2 GHz) 4.0-12 GHz [old:new] LNAs 12mm (16-25GHz) 7mm (26-50GHz) 3mm (83.5-105GHz) AT Correlator CABB 2pol x 2GHz [1 freq; 2 freq] Broadband link (1 Gbit/s) NASA Spacecraft tracking (10 hrs/week)

2007

2008

2009

2010

Parkes
70cm (440MHz; 36MHz BW) 10/50cm (0.64-0.704, 2.6-3.6GHz) 20cm multibeam (13 beams; 1.23-1.53GHz) H-OH (1.2-1.8GHz) Galileo (2.2-2.5GHz) AT Multiband (2.2-2.5,4.5-5.1,8.1-8.7 GHz) Methanol multibeam (7beams; 6.0-6.7GHz) Mars (8.1-8.6 GHz) 2.2cm (12.0-15.0GHz) 1.3cm (21.0-24.0) 13mm (16-26GHz) AT correlator (128 MHz BW) Multibeam correlator (64 MHz BW) Wideband correlator (1GHz BW) Pulsar DFB [0.25GHz : 0.5GHz : 1GHz] CPSR2 (Swinburne) CPSR3 (Swinburne) Broadband link (1 Gbit/s)

Mopra
20/13cm (1.25-1.8, 1.8-3.0 GHz) 6/3cm (4.4-6.9, 8.0-9.2 GHz) 12mm (16-25GHz) 7mm (26-50GHz) 3mm (78-116GHz) AT Correlator MOPS [2GHz : 8GHz] Broadband link (1 Gbit/s) Remote operation

LBA
AT Correlator/S2 recording 32MHz S/W correlator/Disk 512 MHz [1:2:5] days CABB correlation (2GHz BW)

Tidbinbilla
12mm (bw?) [1 IF:2 IFs]

ATNF_instruments.ps v. 15 Feb 2007

D McConnell


ATNF instrumentation
2007 - 2012
2007
ATCA
20/13cm (1.25-1.8, 2.2-2.5 GHz) 1.2-3.0 GHz [600MHz bw:2GHz bw ] 6/3cm (4.4-6.9, 8.0-9.2 GHz) 4.0-12 GHz [old:new] LNAs 12mm (16-25GHz) 7mm (26-50GHz) 3mm (83.5-105GHz) AT Correlator CABB 2pol x 2GHz NASA Spacecraft tracking (10 hrs/week)

2008

2009

2010

2011

2012

Parkes
10/50cm (0.64-0.704, 2.6-3.6GHz) 20cm multibeam (13 beams; 1.23-1.53GHz) H-OH (1.2-1.8GHz) Galileo (2.2-2.5GHz) AT Multiband (2.2-2.5,4.5-5.1,8.1-8.7 GHz) Methanol multibeam (7beams; 6.0-6.7GHz) Mars (8.1-8.6 GHz) 12mm (16-26GHz) Multibeam correlator (64 MHz BW) Pulsar DFB 1GHz APSR (Swinburne)

Mopra
20/13cm (1.25-1.8, 1.8-3.0 GHz) 6/3cm (4.4-6.9, 8.0-9.2 GHz) 12mm (16-25GHz) 7mm (26-50GHz) 3mm (78-116GHz) MOPS 8GHz

LBA
S/W correlator/Disk 512 MHz [1:2:5] days CABB correlation (2GHz BW)

Tidbinbilla
12mm (bw?) [1 IF:2 IFs]

ASKAP

ATNF_instruments.ps v. 31 Oct 2007

D McConnell For discussion


Schedule
2008 Form SO, EO Establish SOC Streamline modes Automation Telescope safety Scheduling SOC facility Communication Systems Engineering 2009 2010 2011

12


Significant milestones
· · · · · · ·
7 Dec 07 Written report to ATSC Dec 07 ATSC consultation Dec 07 Written report to ATUC 31 Mar 08 Projects approved 1 Jul 08 New formal structures in place Mid 2010 SOC operational 2011 ASKAP operational
13