ATNF Technical Memos
10.1 Systems and Performance
- 10.1/021 ZOOM ARRAYS (R N Bracewell) 13-oct-1982, formerly ATDOC111
- 10.1/026 BACKGROUND CONFUSION & THE A.T. (D L Jauncey) 11-jan-1983
- 10.1/027 REPORT OF A.T. SYSTEM CONCEPT WORKSHOP HELD AT PARKES, 7-9 DECEMBER 1982 (J G Ables R H Frater A G Little J D O'sullivan C E Jacka P J Napier) 9-dec-1982
- 10.1/028 CONSIDERATIONS FOR SOLAR AND STELLAR OBSERVATIONS WITH THE AUSTRALIA TELESCOPE (G A Dulk) 07-apr-1983
- 10.1/029 AT FREQUENCY BANKS AND PREFERRED FREQUENCIES (R N Manchester) 22-mar-1983
- 10.1/030 CONSIDERATIONS FOR SOLAR AND STELLAR OBSERVATIONS WITH THE AUSTRALIA TELESCOPE (G A Dulk) 28-apr-1983
- 10.1/031 SOME IMPLICATIONS OF SELF CALIBRATION FOR SYNTHESIS ARRAY CONFIGURATIONS (T J Cornwell R D Ekers) apr-1983
- 10.1/032 ON THE USE OF REDUNDANT SPACINGS (J Noordam) 23-aug-1983
- 10.1/033 USE OF REDUNDANCY TO DETERMINE PHASE ERRORS (D Mclean) 2-nov-1983
- 10.1/034 A COMPACT ARRAY CONFIGURATION FOR THE AUSTRALIA TELESCOPE (P Wild) 15-dec-1983
- 10.1/035 FURTHER THOUGHTS ON CHOOSING REDUNDANT ARRAYS (D Mclean) 21-jan-1984
- 10.1/037 AT SYSTEMS DEFINITION (J W Brooks) 10-apr-1984
- 10.1/038 BETTER REDUNDANT CONFIGURATIONS FOR THE AT (D Mclean) 17-apr-1984
- 10.1/039 CALIBRATION OF THE AUSTRALIA TELESCOPE (M Komesaroff) 26-jul-1985
10.3 Receivers, LO Systems, and Data Links
- 10.3/001 PHASE SYNCHRONISATION OF WIDELY-SEPARATED FREQUENCY STANDARDS USING A SATELLITE-LINK (R T Schilizzi M W Sinclair K J Wellington) 12-jul-1982, formerly ATDOC104
- 10.3/002 CONSIDERATIONS FOR DIGITIZING THE IFS AT THE ANTENNAS FOR THE A.T. (P Napier) 22-jul-1982, formerly ATDOC107
- 10.3/003 NON-COSTLY LOCAL OSCILLATOR DISTRIBUTION IN PIPE (R N Bracewell) 13-dec-1982
- 10.3/004 LO PHASE STABILITY, ABSOLUTE POSITION MEASUREMENTS AND LINEAR POLARIZATION - CONSTRAINTS IMPOSED BY THE ATMOSPHERE AND IONOSPHERE (J R Forster) 20-dec-1982
- 10.3/005 OPTICAL FIBRE USAGE IN THE AT: REPORT ON THE SEVENTH AUSTRALIAN WORKSHOP ON OPTICAL COOMUNICATION (K J Wellington M W Sinclair) 12-jan-1983
- 10.3/006 HYDROGEN MASERS OR A SATELLITE LINK? (R T Schilizzi M W Sinclair K J Wellington) 13-jul-1982, formerly ATDOC105
10.4 Correlator Systems
- 10.4/001 PROPOSED AT SPECTRAL-LINE CORRELATION SYSTEM (J L Caswell J R Forster J B Whiteoak)
- 10.4/002 MUST WE RECIRCULATE THE AT CORRELATOR? (J D O'sullivan) 12-jul-1983
- 10.4/003 REPORT OF THE WORKSHOP ON THE AUSTRALIA TELESCOPE CORRELATOR SYSTEM (J D O'sullivan) 16-jan-1984
10.5 Computers & Processing
- 10.5/001 SOFTWARE FOR THE AUSTRALIA TELESCOPE PROJECT (R D Ekers) 21-mar-1983
- 10.5/001 SOFTWARE FOR THE AUSTRALIA TELESCOPE PROJECT (R D Ekers) 21-mar-1983 (2nd Copy)
- 10.5/002 REPORT OF THE WORKSHOP ON AUSTRALIA TELESCOPE COMPUTER SYSTEMS (Chair: R.H.Frater) 28-jul-1983
- 10.5/003 COMPUTER NETWORKS (M Ewing) 13-dec-1985
14.4 LO Systems and Data Links (Fibre Optics & Microwave Links)
- 14.4/001 EVALUATION OF MODERN HYDROGEN MASERS (JPL) 01-dec-1982
14.6 Computers & Processing II
- 14.6/001 ACCMAINT (H May) 10-feb-1988
14.7 General
- 14.7/001 CULGOORA WEATHER STATION USER GUIDE (M Kesteven) 27-jan-1987
15.5 Site Development & Construction - Interference Studies
- 15.5/012 SIDING SPRING A.T. INTERFERENCE SURVEY I (R A Kennedy G F Gerrard I McCurley) 24-jun-1983
- 15.5/018 INTERFERENCE SURVEY II RESUME (R A Kennedy) 17-aug-1983
- 15.5/019 SIDING SPRING INTERFERENCE SURVEY I RESUME (R A Kennedy) 15-jun-1983
- 15.5/020 AT INTERFERENCE SURVEY NO 2 (R A Kennedy) 19-jun-1984
- 15.5/022 INTERFERENCE SURVEY III (R A Kennedy J W Brooks) 19-mar-1984
- 15.5/024 INTERFERENCE SURVEY - NO IV (R A Kennedy A G Little M J Kesteven G F Gerard J W Brooks) 06-jul-1984
- 15.5/025 FREQUENCY ALLOCATIONS (ALSO ON AT 15.7.017) (BJR) 28-aug-1984
- 15.5/027 INTERFERENCE SURVEY 5 - TASMANIA (R A Kennedy P Button G Gowland) 26-oct-1984
- 15.5/030 INTERFERENCE SURVEY 6 - DENNING SITE (R A Kennedy M Gray) 30-jan-1985
- 15.5/037 ALLOWABLE LEVELS OF C.W. INTERFERENCE FOR THE AUSTRALIA TELESCOPE (G Nelson R Forster) 20-sep-1985
- 15.5/040 22 KV ELECTRICAL INTERFERENCE AND THE AT (G J Nelson) 21-oct-1985
15.6 Culgoora
- 15.6/001 AT COMPACT ARRAY LINE SURVEY (Parts 1-4 incl.) (R.A. Kennedy) 28-Jun-1984 to 2-May-1985
- 15.6/255 AUSTRALIA TELESCOPE OPERATING INSTRUCTIONS - CULGOORA ANTENNAS (Macdonald Wagner Pty Ltd) 20-may-1987
17.2 Technical Advisory Groups - Configuration Study Group
- 17.2/003 A CONFIGURATION FOR THE AT COMPACT ARRAY (ALSO ON AT 10.1/036) (R N Manchester) 29-feb-1984
- 17.2.1/001 THE OPTIMUM LENGTH OF THE AT SPUR (R Norris) 17-oct-1984
- 17.2.1/002 FURTHER THOUGHTS ON THE LENGTH OF THE AT SPUR (J R Forster) 22-oct-1984
17.3 Long Baseline Array
- 17.3.1/001 OPTIONS FOR THE LBA COMMUNICATION LINKS - A REPORT OF THE LBA WORKING GROUP (R P Norris) 12-oct-1984
- 17.3.1/002 THE FEASIBILITY OF USING TAPE RECORDERS FOR AT LBA DATA TRANSMISSION (R P Norris J A Roberts) 13-aug-1984
- 17.3.1/003 A PROPOSAL FOR TAPE RECORDERS FOR THE AT LBA (R P Norris) 07-mar-1985
- 17.3.1/004 THE VLBA DATA ACQUISITION SYSTEM REPORT AND ITS IMPACT ON THE AT (R P Norris) 31-jul-1985
- 17.3.1/005 WHAT'S SO GREAT ABOUT PHASE STABILITY? (R P Norris) 14-oct-1985
- 17.3.1/006 A LOWER LIMIT TO LBA CLOCK ACCURACY (R P Norris) 14-mar-1986
- 17.3.1/007 VLBA DATA ACQUISITION SYSTEM (GLJ) 26-may-1986
- 17.3.1/008 REPORT OF THE AT LBA WORKSHOP (R P Norris) 29-may-1986
- 17.3.1/009 AD HOC MEETING ON AT LBA (J W Brooks) 04-sep-1986
- 17.3.1/010 MINUTES OF LBA DISCUSSION (J A Roberts) 11-sep-1986
- 17.3.1/011 FRINGE AND DELAY TRACKING AT ANTENNAS WITH INDEPENDENT LOCAL OSCILLATORS (J A Roberts) 25-sep-1986
- 17.3.1/012 MAXIMUM USABLE PHASE RATES ON THE AT (R P Norris) 11-nov-1986
- 17.3.1/013 A LYMAN/AT ANTENNA IN EASTERN AUSTRALIA? (R P Norris) 16-jun-1987
- 17.3.1/014 THE EFFECT ON THE AT OF AN ANTENNA AT ADELAIDE (R P Norris) 20-oct-1987
- 17.3.1/015 THE AT LONG BASELINE ARRAY (R P Norris) 17-feb-1988
- 17.3.1/016 THE EFFECT ON THE AT OF AN ANTENNA AT PERTH (R P Norris) 23-feb-1988
18.2 Working Documents
- 18.2/001 WORKING LIST OF POTENTIAL CALIBRATION SOURCES FOR SOUTHERN HEMISPHERE RADIO OBSERVATIONS (M J Batty) feb-1983
20.1 Overall Systems Performance & Operation - File Notes
- 20.1/004 CONSIDERATIONS ON DIGITAL FILTERS FOR THE AUSTRALIA TELESCOPE (J R Forster) 24-may-1983
- 20.1/005 AT COMPACT ARRAY: EFFECT OF DEVIATIONS FROM A LINEAR EAST-WEST ARRAY (J R Forster J D O'sullivan R N Manchester) 27-sep-1983
- 20.1/006 WIDE FIELD MAPPING: EFFECTS INCREASING WITH DISTANCE FROM THE FIELD CENTRE (J R Forster) 09-nov-1983
- 20.1/008 THE CHOICE OF INTEGRATION TIME FOR THE AT (R P Norris) 17-feb-1984
- 20.1/009 FURTHER THOUGHTS ON CHOOSING REDUNDANT ARRAYS (D Mclean) 21-jan-1984 (duplicates 10.1/035)
- 20.1/012 THE ASTRONOMICAL POTENTIAL OF THE LBA (R Norris) 16-apr-1984
- 20.1/013 STATUS AND FUTURE OF THE PTI (R P Norris) 21-mar-1986
- 20.1/014 THE SCHEDULING PROBLEM (M J Kesteven) 22-mar-1986
- 20.1/015 SURVEY AND POSITIONING TOLERANCES (M J Kesteven) 01-apr-1986
20.1.1 Overall Systems Performance & Operation - Technical Notes & Reports
- 20.1.1/001 FREQUENCY BANDS FOR THE AT (T M Percival) 05-jun-1984
- 20.1.1/002 A PROPOSAL FOR A PARKES-TIDBINBILLA INTERFEROMETER (R Norris) 15-jun-1984
- 20.1.1/003 THE EFFECT ON THE PERFORMANCE OF THE LBA OF A TELESCOPE AT HOBART (R Norris) 19-jun-1984
- 20.1.1/004 RESULTS FROM QUESTIONNAIRE ON PROJECTED AT USE (R P Norris) 4-aug-1984
- 20.1.1/005 POLARIZATION AND THE AT (M J Kesteven) 30-nov-1984
- 20.1.1/006 OBSERVATIONAL CONSEQUENCES OF LINEARLY POLARIZED FEEDS FOR THE AT (R Forster) 27-nov-1984
- 20.1.1/007 STAND ALONE OPERATION OF THE AT ANTENNAS (J R Forster) 10-dec-1984
- 20.1.1/008 SOME QUESTIONS ON THE OPERATION OF THE AT (R Norris) 01-may-1985
- 20.1.1/009 SCIENTIFIC IMPLICATIONS OF A 16 MHZ XCELL (J R Forster) 13-jun-1985
- 20.1.1/010 ALLOWABLE LEVELS OF C.W. INTERFERENCE FOR THE AUSTRALIA TELESCOPE (G Nelson R Forster) 20-sep-1985
- 20.1.1/011 OPERATION OF THE AUSTRALIA TELESCOPE (J Brooks G Nelson) 25-sep-1985
- 20.1.1/012 PULSAR OBSERVATIONS WITH THE AUSTRALIA TELESCOPE (G J Nelson) 11-jul-1985
- 20.1.1/013 MILLISECOND INTEGRATION TIMES ON THE COMPACT ARRAY (G J Nelson) 11-jul-1985
- 20.1.1/014 BANDWIDTH SYNTHESIS ON THE COMPACT ARRAY (R N Manchester) 01-oct-1985
- 20.1.1/015 REPORT TO THE 11TH MEETING OF THE AT ADVISORY COMMITTEE (G J Nelson) 10-oct-1985
- 20.1.1/016 LEVEL AND GAIN CONTROL IN THE AT (G J Nelson) 06-feb-1986
- 20.1.1/017 A BRIEF LOOK AT AT CALIBRATION (D L Jauncey) 20-feb-1986
- 20.1.1/018 MOLECULAR LINES AND THE AT FREQUENCY BANDS (J R Forster) 25-feb-1986
- 20.1.1/019 COMPUTATIONAL LOAD FOR BANDWIDTH SYSTHESIS (G J Nelson) 05-mar-1986
- 20.1.1/020 SWITCHING WAVEFORMS FOR THE AT RECEIVERS (G J Nelson) 27-mar-1986
- 20.1.1/021 THE PROBLEM OF THE MISSING LOW SPATIAL FREQUENCIES (M Kesteven J Caswell) 15-mar-1986
- 20.1.1/022 SYSTEM DRAWINGS (G Nelson) 23-apr-1986
- 20.1.1/023 REPORT TO THE 12TH MEETING OF THE AT ADVISORY COMMITTEE - SYSTEM OVERVIEW (G J Nelson) 23-apr-1986
- 20.1.1/024 TIMING REQUIREMENTS FOR THE AT DELAY AND FRINGE TRACKING SYSTEM (J R Forster) 6-may-1986
- 20.1.1/025 INTERFEROMETRIC MAPPING USING THE HARTLEY TRANSFORM (R N Bracewell) 21-may-1986
- 20.1.1/026 DIFFERENTIAL DELAYS IN POLARIZERS (G J Nelson) 26-jun-1986
- 20.1.1/027 LABELLING DIGITIZED IF DATA WITH TIME INFORMATION (G J Nelson) 01-aug-1986
- 20.1.1/028 IMPLICATIONS OF INCLUDING THE INTERNATIONALLY PROTECTED BANDS 2690-2700 MHZ AND 10.6 - 10.7 GHZ IN THE AT BANDS (G J Nelson) 22-aug-1986
- 20.1.1/029 LEVEL CONTROL AND TSYS MONITORING IN THE AT (G J Nelson) 23-sep-1986
- 20.1.1/030 INTEGRATION AND CYCLE TIMES IN THE AT (G J Nelson) 24-sep-1986
- 20.1.1/032 DEFINITION OF TERMINOLOGY AND QUANTITIES FOR THE AT (R P Norris) 13-oct-1986
- 20.1.1/033 BANDWIDTH AND MOSAICING SYNTHESIS (R D Ekers) 15-oct-1985
- 20.1.1/034 BANDWIDTH SYNTHESIS AND MOSAICING - CONSTRAINTS ON INTEGRATION TIMES (R N Manchester M J Kesteven) 27-oct-1986
- 20.1.1/042 AT NOMENCLATURE (M Calabretta R Norris) 11-aug-1987
- 20.1.1/047 12 GHZ METHANOL RECEIVERS FOT THE AT (R P Norris) 19-nov-1987
- 20.1.1/051 SYSTEMS OVERVIEW (G J Nelson) 24-feb-1988
20.1.2 System Testing
- 20.1.2/015 THE POLARISATION CHARACTERISTICS OF THE AT ANTENNAS (M Kesteven W Wilson) 03-may-1989
20.2 Internal Memos
- 20.2/001 A WORKING LIST OF POTENTIAL CALIBRATION SOURCES FOR SOUTHERN HEMISPHERE RADIO OBSERVATIONS - SEE 18.2/001
- 20.2/002 HIGH-FREQUENCY SPECTRAL-LINE OBSERVATIONS ON THE AT (J B Whiteoak) 13-apr-1983
20.3 Meetings of Working Group
- 20.3/001 REPORT OF AT SYSTEM CONCEPT WORKSHOP HELD AT PARKES 7-9 DECEMBER 1982 - SEE 10.1.027
20.8 System Definition Documents
- 20.8/009 AT SYSTEMS DEFINITION, VERSION NO. 9 () 21-may-1987
21.1.1 Antenna Systems - File Notes
- 21.1.1/025 POSSIBLE STATION LOCATIONS FOR COMPACT ARRAY (R N Manchester) 28-jun-1983
21.1.1.1 Antenna Systems - Technical Notes & Reports
- 21.1.1.1/009 THERMAL DISTORTION OF THE AT ANTENNAS (M J Kesteven) 29-sep-1987
- 21.1.1.1/010 THERMAL DISTORTIONS II (G Nelson M Kesteven) 17-dec-1987
- 21.1.1.1/011 THERMAL DISTORTION OF THE AT ANTENNAS II (G Nelson M Kesteven) 17-dec-1987
21.3.1.1 Feeds - Technical Notes & Reports
- 21.3.1.1/001 EFFECTS OF AXIAL SUBREFLECTOR SHIFTS ON THE AT (R Kennedy) 16-mar-1984
- 21.3.1.1/004 FEEDS FOR THE AT: THE USE OF LINEAR POLARIZATION AS IT AFFACTS VLBI AND LBA MEASUREMENTS (M Komesaroff) 29-nov-1984
- 21.3.1.1/006 FEED AND RECEIVER CONFIGURATIONS FOR PARKES - FOR LBA AND FOR SINGLE DISH WORK (M Komesaroff) 03-oct-1985
21.4.1.1 Servo Mechanisms - Technical Notes & Reports
- 21.4.1.1/001 PRELIMINARY ERROR BUDGET FOR SERVO SYSTEM (M Beavis R Evans) 20-sep-1984
21.5.1.1 Subreflectors - Technical Notes & Reports
- 21.5.1.1/001 SCIENTIFIC CONSTRAINTS ON THE ALLOWABLE SUBREFLECTOR MOTIONS FOR THE AT ANTENNAS (J R Forster) 29-feb-1984
22.1.1 Receivers - Technical Notes & Reports
- 22.1.1/003 IF CONVERSION AND NARROW-BAND ANALOG FILTERING (G Graves) 30-may-1984
- 22.1.1/004 IF ANALOG FILTERS: THEIR BANDSHAPE (G Graves) 23-oct-1984
- 22.1.1/029 SPURIOUS SIGNALS, COMB LINES AND LOCAL OSCILLATORS (G Graves) 07-apr-1988
23.4 LO Systems
- 23.4/011 A SOFTWARE SOLUTION TO THE LO DOPPLER PROBLEM (R P Norris) 31-jan-1985
23.4.1 LO Systems - Technical Notes & Reports
- 23.4.1/002 COMMUNICATION LINKS FOR THE LBA (A C Young) 10-aug-1984
- 23.4.1/003 PHASE (AND DATA) TRANSFER BY POINT-TO-POINT RADIO LINK (B Anderson) oct-1984
- 23.4.1/004 PHASE TRANSFER VIA AUSSAT (B Anderson) oct-1984
- 23.4.1/006 AT ONE DAY SYMPOSIUM ON DIGITAL VS ANALOGUE FILTERS AND THE IMPLICATIONS ON LO DESIGN (R Gough) 24-may-1984
- 23.4.1/011 A MATTER OF TERMINOLOGY 'CLOCKS' AND 'FREQUENCY STANDARDS' (J Roberts) 17-apr-1986
- 23.4.1/012 CONTROL INFORMATION FOR THE LO AND CORRELATOR (M Kesteven R P Norris) 23-nov-1986
- 23.4.1/015 LO LINE STABILISATION AND THE INTEGRATION CLOCK (M Kesteven A Young) 24-mar-1987
- 23.4.1/016 DATA TRANSMISSION SYNCHRONISATION (W E Wilson) 18-mar-1987
24.1.1 Correlator Systems - Technical Notes & Reports
- 24.1.1/005 SCIENTIFIC IMPLICATIONS OF A 16 MHZ XCELL - SEE 20.1.1.009
- 24.1.1/010 AT CORRELATOR BLOCK TECHNICAL INFORMATION (D Loone) 27-oct-1986
25.1 Computers & Processing - File Notes
- 25.1/016 CALIBRATION NOTES II - DELAYS AND PHASES THAT NEED TO BE CALIBRATED (M J Kesteven) 24-apr-1986
- 25.1/017 MONITOR POINTS WHICH PROVIDE CONTROL INFORMATION (M J Kesteven) 24-apr-1986
- 25.1/027 THE SAMPLER SYNCHRONISING CYCLE (M J Kesteven) 25-sep-1986
- 25.1/028 THE AT CLOCK(S) (M J Kesteven) 04-oct-1986
- 25.1/029 OFFLINE COMPUTER SYSTEM FOR THE AT (J E Baldwin W N Brouw R D Ekers) 30-oct-1986
- 25.1/031 THE EMPEE PROGRAM (J D Argyros) 12-jan-1987
- 25.1/035 THE XMNMP PROGRAM (J D Argyros) 06-aug-1987
25.1.1 Computers & Processing - Technical Notes & Reports
- 25.1.1/001 DATA STORAGE AND TRANSPORT REQUIREMENTS FOR THE AT (R Norris) 23-may-1984
- 25.1.1/002 ON LINE AT CORRECTIONS REVISED (M J Kesteven) 26-oct-1984
- 25.1.1/003 A SOURCE CATALOGUE FOR THE AT (R Norris) 17-sep-1984
- 25.1.1/006 THE SCHEDULING PROBLEM PART II (M J Kesteven) 23-oct-1984
- 25.1.1/007 COMPUTING REQUIREMENTS FOR AT SOFTWARE DEVELOPMENT (R Wand M Kesteven P Rayner) 24-feb-1994
- 25.1.1/007 ON-LINE SOFTWARE II (M J Kesteven) 23-oct-1984
- 25.1.1/010 REPORT OF THE DATA PROCESSING MEETING 28 MAY 1984 PART II (M J Kesteven Jrf Rpn Ptr Rhw) 28-may-1984
- 25.1.1/011 SELFCAL AND THE AT (R Norris M Kesteven) 25-nov-1984
- 25.1.1/013 AT/RP COMPUTING IN 1988 AND BEYOND (M J Kesteven) 16-jan-1985
- 25.1.1/021 A UV DATA FORMAT FOR THE AT (R Norris) 08-may-1985
- 25.1.1/024 THE CULGOORA DATA COLLECTION SYSTEM (Rhw) 28-sep-1985
- 25.1.1/025 STEERING THE AT - THE EPHEMERIS ROUTINES (M Kesteven M Calabretta) 05-mar-1986
- 25.1.1/026 OPERATING THE CA AS A TIED ARRAY THE PHASING PROBLEM (M J Kesteven) 22-jan-1986
- 25.1.1/028 DRAFT SPECIFICATION FOR RPFITS (R P Norris) 24-feb-1986
- 25.1.1/029 CALIBRATION NOTES I ANTENNA ERRORS (M J Kesteven Mrc) 17-apr-1986
- 25.1.1/030 IONOSPHERIC CORRECTIONS (M J Kesteven) 31-mar-1986
- 25.1.1/033 THE AT CATALOGUE (R P Norris) 29-sep-1986
- 25.1.1/037 DEFINITION OF TERMINOLOGY AND QUANTITIES FOR THE AT (R P Norris) 13-oct-1986
- 25.1.1/038 AT PROGRAMMING STANDARDS (R P Norris) 19-dec-1986
- 25.1.1/041 MAXIMUM DATA RATES BETWEEN ACC AND DATA SETS (D Ferris) 28-jan-1987
- 25.1.1/043 CONTROL INFORMATION (M J Kesteven) 14-mar-1987
- 25.1.1/044 DATA SET TYPES AND OPTIONS (D Ferris) 26-feb-1987
- 25.1.1/045 PROGRAMMER'S GUIDE TO THE AT DATASET (M Kesteven R Ferris) 22-jan-1987
- 25.1.1/047 DATA PROCESSING FOR THE AUSTRALIAN TELESCOPE (R P Norris) 11-sep-1987
- 25.1.1/050 DATA TRANSFER FOR THE AT (R P Norris) 07-jan-1987
- 25.1.1/051 CALIBRATION OF THE AUSTRALIAN TELESCOPE (R P Norris) 22-feb-1988
27.7 VLBI
- 27.7/002 AN ASIAN/PACIFIC VLBI FACILITY (R P Norris) 15-sep-1987
- 27.7/003 FUTURE DEVELOPMENT OF THE PTI (R P Norris) 25-feb-1988
29.1 QUASAT - File Notes and General
- 29.1/008 QUASAT REPORT ON THE PHASE A STUDY (B Anderson A Van Ardenne A Baudry A Benz R S Booth A Ferrari D W Murphy E Preuss R T Schilizzi G Tofani P N Wilkinson) oct-1988
39.0 AT Operations Files - Technical Documents
- 39.0/001 ATNF DOCUMENTATION (W Walsh) 24-jun-1991
- 39.0/003 CSIRO-DIT COLLABORATION TECHNOLOGY REVIEW (M Lloyd) 23-apr-1993
39.1 AT Manuals
- 39.1/008 PHOENIX SOFTWARE (M Kesteven E Troup) 01-feb-1995
- 39.1/009 PHASE TRANSFER SYSTEM TECHNICAL MANUAL (A Young G Mcculloch M Hayes R Gardyne) 01-apr-1996
- 39.1/010 AUSTRALIA TELESCOPE LOCAL OSCILLATOR SYSTEMS (A C Young) 24-jan-1990
39.2 AT Technical Data
- 39.2/010 MEASUREMENTS OF THE ATCA PRIMARY BEAM (M H Wieringa M J Kesteven) 08-sep-1992
- 39.2/011 TILT RESULTS (I) (H Du M Kesteven) 21-nov-1992
- 39.2/012 TILT RESULTS (II) (H Du M Kesteven) 05-dec-1992
- 39.2/013 INTELLIGENT AT FAULT DIAGNOSIS SYSTEM USERS' MANUAL (R Landau) 04-may-1993
- 39.2/014 THE AUSTRALIA TELESCOPE DATA ARCHIVING PROBLEM (S W Amy D Mcconnell R M Wark) 28-apr-1993
- 39.2/015 SCHEDULING COMPACT ARRAY CONFIGURATIONS (G Nelson) 02-jun-1993
- 39.2/016 CRYOGENICS MAINTENANCE MANUAL NARRABRI & MOPRA (M Bland) 27-nov-1992
- 39.2/017 WIND TORQUES ON ANTENNAS (Connell Wagner Pty Ltd) 20-apr-1993
- 39.2/018 TRANSIENT RESPONSE OF THE RECEIVER SYSTEM - IMPLICATIONS FOR BANDWIDTH SYNTHESIS (R Gough) 17-aug-1993
- 39.2/019 ARRAY CONFIGURATIONS AND LENGTH OF SCHEDULING PERIOD (G Nelson) 04-nov-1993
- 39.2/020 PHASE JUMPS IN THE AT PHASE ROTATOR MODULES (A Bish) 22-nov-1993
- 39.2/021 MOPRA MEETING MINUTES AND THEIR UPDATE (G Baines) 19-jul-1993
- 39.2/022 RECEIVER SYSTEM TEMPERATURES (R Gough) 19-jan-1994 (duplicates 39.3/034)
- 39.2/024 ATCA RECONFIGURATION CALIBRATION AND IMPLICATIONS FOR NEW CONFIGURATIONS AND STATIONS (D J Mckay) 22-nov-1996
- 39.2/031 THERMAL CONDUCTIVITY CONSIDERATIONS OF STAINLESS STEEL COMPONENTS (B Kingdom) 23-nov-1992
- 39.2/032 INTELLIGENT AT FAULT DIAGNOSIS SYSTEM: REPORT TO DATE (R Landau) 19-nov-1992
- 39.2/033 DATA SET PRODUCTION: THE FINAL RECKONING? (D Ferris) 11-mar-1993
- 39.2/034 AT TECHNICAL REPORT NO. E1: CULGOORA WEATHER STATION (M J Kesteven) 29-jun-1988
- 39.2/035 THE AT MONITORING SYSTEM (M J Kesteven) 26-mar-1990
- 39.2/036 COMPACT ARRAY COMPUTERS AND SOFTWARE (M J Kesteven) 13-oct-1990
- 39.2/037 INTELLIGENT MONITOR SYSTEM FOR THE AUSTRALIA TELESCOPE (M Kesteven) 01-jun-1990
- 39.2/053 VLBI TEST TONE UNIT (R Gough G Herbert) 22-sep-1993
- 39.2/055 INTERFERENCE ON THE COMPACT ARRAY AND SHIELDING RECOMMENDATIONS (R Gough) 22-mar-1994
- 39.2/056 RECEIVER UPGRADE FOR S2 METHANOL VLBI OBSERVATIONS AT 12.2 GHz (R Gough) 28-mar-1994
- 39.2/059 FAULTY: REPORT FROM IJCAI-93 ARTIFICIAL INTELLIGENCE CONFERENCE IN FRANCE (R Landau) 30-aug-1993
- 39.2/060 MOPRA POINTING INTERIM REPORT #1 (M J Kesteven) 22-may-1994
- 39.2/061 MOPRA HOLOGRAPHY INTERIM REPORT #1 (M J Kesteven) 22-may-1994
- 39.2/063 HOT BOX MEASUREMENT OF COMPACT ARRAY RECEIVER SYSTEM TEMPERATURES (R Gough) 22-jul-1994
- 39.2/064 CRYOGENIC PERFORMANCE OF DRP 12 GHz MMIC AMPLIFIER (R Gough) 21-nov-1995
- 39.2/065 ATMOSPHERIC NOISE CONTRIBUTION TO RECEIVER SYSTEM TEMPERATURE AT 35-50 GHZ (R Gough) 05-feb-1996
- 39.2/066 CRYOGENIC PERFORMANCE OF DRP 25-40 GHz MMIC AMPLIFIER (R Gough) 09-mar-1996
- 39.2/067 12 MM RECEIVER FOR SHANGHAI OBSERVATORY (R Gough) 12-apr-1996