ATNF Technical Memos
10.1 Systems and Performance
- 10.1/021 ZOOM ARRAYS (R N Bracewell) 13-oct-1982, formerly ATDOC111
- 10.1/026 BACKGROUND CONFUSION & THE A.T. (D L Jauncey) 11-jan-1983
- 10.1/027 REPORT OF A.T. SYSTEM CONCEPT WORKSHOP HELD AT PARKES, 7-9 DECEMBER 1982 (J G Ables R H Frater A G Little J D O'sullivan C E Jacka P J Napier) 9-dec-1982
- 10.1/028 CONSIDERATIONS FOR SOLAR AND STELLAR OBSERVATIONS WITH THE AUSTRALIA TELESCOPE (G A Dulk) 07-apr-1983
- 10.1/029 AT FREQUENCY BANKS AND PREFERRED FREQUENCIES (R N Manchester) 22-mar-1983
- 10.1/030 CONSIDERATIONS FOR SOLAR AND STELLAR OBSERVATIONS WITH THE AUSTRALIA TELESCOPE (G A Dulk) 28-apr-1983
- 10.1/031 SOME IMPLICATIONS OF SELF CALIBRATION FOR SYNTHESIS ARRAY CONFIGURATIONS (T J Cornwell R D Ekers) apr-1983
- 10.1/032 ON THE USE OF REDUNDANT SPACINGS (J Noordam) 23-aug-1983
- 10.1/033 USE OF REDUNDANCY TO DETERMINE PHASE ERRORS (D Mclean) 2-nov-1983
- 10.1/034 A COMPACT ARRAY CONFIGURATION FOR THE AUSTRALIA TELESCOPE (P Wild) 15-dec-1983
- 10.1/035 FURTHER THOUGHTS ON CHOOSING REDUNDANT ARRAYS (D Mclean) 21-jan-1984
- 10.1/037 AT SYSTEMS DEFINITION (J W Brooks) 10-apr-1984
- 10.1/038 BETTER REDUNDANT CONFIGURATIONS FOR THE AT (D Mclean) 17-apr-1984
- 10.1/039 CALIBRATION OF THE AUSTRALIA TELESCOPE (M Komesaroff) 26-jul-1985
10.3 Receivers, LO Systems, and Data Links
- 10.3/001 PHASE SYNCHRONISATION OF WIDELY-SEPARATED FREQUENCY STANDARDS USING A SATELLITE-LINK (R T Schilizzi M W Sinclair K J Wellington) 12-jul-1982, formerly ATDOC104
- 10.3/002 CONSIDERATIONS FOR DIGITIZING THE IFS AT THE ANTENNAS FOR THE A.T. (P Napier) 22-jul-1982, formerly ATDOC107
- 10.3/003 NON-COSTLY LOCAL OSCILLATOR DISTRIBUTION IN PIPE (R N Bracewell) 13-dec-1982
- 10.3/004 LO PHASE STABILITY, ABSOLUTE POSITION MEASUREMENTS AND LINEAR POLARIZATION - CONSTRAINTS IMPOSED BY THE ATMOSPHERE AND IONOSPHERE (J R Forster) 20-dec-1982
- 10.3/005 OPTICAL FIBRE USAGE IN THE AT: REPORT ON THE SEVENTH AUSTRALIAN WORKSHOP ON OPTICAL COOMUNICATION (K J Wellington M W Sinclair) 12-jan-1983
- 10.3/006 HYDROGEN MASERS OR A SATELLITE LINK? (R T Schilizzi M W Sinclair K J Wellington) 13-jul-1982, formerly ATDOC105
10.4 Correlator Systems
- 10.4/001 PROPOSED AT SPECTRAL-LINE CORRELATION SYSTEM (J L Caswell J R Forster J B Whiteoak)
- 10.4/002 MUST WE RECIRCULATE THE AT CORRELATOR? (J D O'sullivan) 12-jul-1983
- 10.4/003 REPORT OF THE WORKSHOP ON THE AUSTRALIA TELESCOPE CORRELATOR SYSTEM (J D O'sullivan) 16-jan-1984
10.5 Computers & Processing
- 10.5/001 SOFTWARE FOR THE AUSTRALIA TELESCOPE PROJECT (R D Ekers) 21-mar-1983
- 10.5/001 SOFTWARE FOR THE AUSTRALIA TELESCOPE PROJECT (R D Ekers) 21-mar-1983 (2nd Copy)
- 10.5/002 REPORT OF THE WORKSHOP ON AUSTRALIA TELESCOPE COMPUTER SYSTEMS (Chair: R.H.Frater) 28-jul-1983
- 10.5/003 COMPUTER NETWORKS (M Ewing) 13-dec-1985
14.4 LO Systems and Data Links (Fibre Optics & Microwave Links)
- 14.4/001 EVALUATION OF MODERN HYDROGEN MASERS (JPL) 01-dec-1982
14.6 Computers & Processing II
- 14.6/001 ACCMAINT (H May) 10-feb-1988
14.7 General
- 14.7/001 CULGOORA WEATHER STATION USER GUIDE (M Kesteven) 27-jan-1987
15.5 Site Development & Construction - Interference Studies
- 15.5/012 SIDING SPRING A.T. INTERFERENCE SURVEY I (R A Kennedy G F Gerrard I McCurley) 24-jun-1983
- 15.5/018 INTERFERENCE SURVEY II RESUME (R A Kennedy) 17-aug-1983
- 15.5/019 SIDING SPRING INTERFERENCE SURVEY I RESUME (R A Kennedy) 15-jun-1983
- 15.5/020 AT INTERFERENCE SURVEY NO 2 (R A Kennedy) 19-jun-1984
- 15.5/022 INTERFERENCE SURVEY III (R A Kennedy J W Brooks) 19-mar-1984
- 15.5/024 INTERFERENCE SURVEY - NO IV (R A Kennedy A G Little M J Kesteven G F Gerard J W Brooks) 06-jul-1984
- 15.5/025 FREQUENCY ALLOCATIONS (ALSO ON AT 15.7.017) (BJR) 28-aug-1984
- 15.5/027 INTERFERENCE SURVEY 5 - TASMANIA (R A Kennedy P Button G Gowland) 26-oct-1984
- 15.5/030 INTERFERENCE SURVEY 6 - DENNING SITE (R A Kennedy M Gray) 30-jan-1985
- 15.5/037 ALLOWABLE LEVELS OF C.W. INTERFERENCE FOR THE AUSTRALIA TELESCOPE (G Nelson R Forster) 20-sep-1985
- 15.5/040 22 KV ELECTRICAL INTERFERENCE AND THE AT (G J Nelson) 21-oct-1985
15.6 Culgoora
- 15.6/001 AT COMPACT ARRAY LINE SURVEY (Parts 1-4 incl.) (R.A. Kennedy) 28-Jun-1984 to 2-May-1985
- 15.6/255 AUSTRALIA TELESCOPE OPERATING INSTRUCTIONS - CULGOORA ANTENNAS (Macdonald Wagner Pty Ltd) 20-may-1987
17.2 Technical Advisory Groups - Configuration Study Group
- 17.2/003 A CONFIGURATION FOR THE AT COMPACT ARRAY (ALSO ON AT 10.1/036) (R N Manchester) 29-feb-1984
- 17.2.1/001 THE OPTIMUM LENGTH OF THE AT SPUR (R Norris) 17-oct-1984
- 17.2.1/002 FURTHER THOUGHTS ON THE LENGTH OF THE AT SPUR (J R Forster) 22-oct-1984
17.3 Long Baseline Array
- 17.3.1/001 OPTIONS FOR THE LBA COMMUNICATION LINKS - A REPORT OF THE LBA WORKING GROUP (R P Norris) 12-oct-1984
- 17.3.1/002 THE FEASIBILITY OF USING TAPE RECORDERS FOR AT LBA DATA TRANSMISSION (R P Norris J A Roberts) 13-aug-1984
- 17.3.1/003 A PROPOSAL FOR TAPE RECORDERS FOR THE AT LBA (R P Norris) 07-mar-1985
- 17.3.1/004 THE VLBA DATA ACQUISITION SYSTEM REPORT AND ITS IMPACT ON THE AT (R P Norris) 31-jul-1985
- 17.3.1/005 WHAT'S SO GREAT ABOUT PHASE STABILITY? (R P Norris) 14-oct-1985
- 17.3.1/006 A LOWER LIMIT TO LBA CLOCK ACCURACY (R P Norris) 14-mar-1986
- 17.3.1/007 VLBA DATA ACQUISITION SYSTEM (GLJ) 26-may-1986
- 17.3.1/008 REPORT OF THE AT LBA WORKSHOP (R P Norris) 29-may-1986
- 17.3.1/009 AD HOC MEETING ON AT LBA (J W Brooks) 04-sep-1986
- 17.3.1/010 MINUTES OF LBA DISCUSSION (J A Roberts) 11-sep-1986
- 17.3.1/011 FRINGE AND DELAY TRACKING AT ANTENNAS WITH INDEPENDENT LOCAL OSCILLATORS (J A Roberts) 25-sep-1986
- 17.3.1/012 MAXIMUM USABLE PHASE RATES ON THE AT (R P Norris) 11-nov-1986
- 17.3.1/013 A LYMAN/AT ANTENNA IN EASTERN AUSTRALIA? (R P Norris) 16-jun-1987
- 17.3.1/014 THE EFFECT ON THE AT OF AN ANTENNA AT ADELAIDE (R P Norris) 20-oct-1987
- 17.3.1/015 THE AT LONG BASELINE ARRAY (R P Norris) 17-feb-1988
- 17.3.1/016 THE EFFECT ON THE AT OF AN ANTENNA AT PERTH (R P Norris) 23-feb-1988
18.2 Working Documents
- 18.2/001 WORKING LIST OF POTENTIAL CALIBRATION SOURCES FOR SOUTHERN HEMISPHERE RADIO OBSERVATIONS (M J Batty) feb-1983
20.1 Overall Systems Performance & Operation - File Notes
- 20.1/004 CONSIDERATIONS ON DIGITAL FILTERS FOR THE AUSTRALIA TELESCOPE (J R Forster) 24-may-1983
- 20.1/005 AT COMPACT ARRAY: EFFECT OF DEVIATIONS FROM A LINEAR EAST-WEST ARRAY (J R Forster J D O'sullivan R N Manchester) 27-sep-1983
- 20.1/006 WIDE FIELD MAPPING: EFFECTS INCREASING WITH DISTANCE FROM THE FIELD CENTRE (J R Forster) 09-nov-1983
- 20.1/008 THE CHOICE OF INTEGRATION TIME FOR THE AT (R P Norris) 17-feb-1984
- 20.1/009 FURTHER THOUGHTS ON CHOOSING REDUNDANT ARRAYS (D Mclean) 21-jan-1984 (duplicates 10.1/035)
- 20.1/012 THE ASTRONOMICAL POTENTIAL OF THE LBA (R Norris) 16-apr-1984
- 20.1/013 STATUS AND FUTURE OF THE PTI (R P Norris) 21-mar-1986
- 20.1/014 THE SCHEDULING PROBLEM (M J Kesteven) 22-mar-1986
- 20.1/015 SURVEY AND POSITIONING TOLERANCES (M J Kesteven) 01-apr-1986
20.1.1 Overall Systems Performance & Operation - Technical Notes & Reports
- 20.1.1/001 FREQUENCY BANDS FOR THE AT (T M Percival) 05-jun-1984
- 20.1.1/002 A PROPOSAL FOR A PARKES-TIDBINBILLA INTERFEROMETER (R Norris) 15-jun-1984
- 20.1.1/003 THE EFFECT ON THE PERFORMANCE OF THE LBA OF A TELESCOPE AT HOBART (R Norris) 19-jun-1984
- 20.1.1/004 RESULTS FROM QUESTIONNAIRE ON PROJECTED AT USE (R P Norris) 4-aug-1984
- 20.1.1/005 POLARIZATION AND THE AT (M J Kesteven) 30-nov-1984
- 20.1.1/006 OBSERVATIONAL CONSEQUENCES OF LINEARLY POLARIZED FEEDS FOR THE AT (R Forster) 27-nov-1984
- 20.1.1/007 STAND ALONE OPERATION OF THE AT ANTENNAS (J R Forster) 10-dec-1984
- 20.1.1/008 SOME QUESTIONS ON THE OPERATION OF THE AT (R Norris) 01-may-1985
- 20.1.1/009 SCIENTIFIC IMPLICATIONS OF A 16 MHZ XCELL (J R Forster) 13-jun-1985
- 20.1.1/010 ALLOWABLE LEVELS OF C.W. INTERFERENCE FOR THE AUSTRALIA TELESCOPE (G Nelson R Forster) 20-sep-1985
- 20.1.1/011 OPERATION OF THE AUSTRALIA TELESCOPE (J Brooks G Nelson) 25-sep-1985
- 20.1.1/012 PULSAR OBSERVATIONS WITH THE AUSTRALIA TELESCOPE (G J Nelson) 11-jul-1985
- 20.1.1/013 MILLISECOND INTEGRATION TIMES ON THE COMPACT ARRAY (G J Nelson) 11-jul-1985
- 20.1.1/014 BANDWIDTH SYNTHESIS ON THE COMPACT ARRAY (R N Manchester) 01-oct-1985
- 20.1.1/015 REPORT TO THE 11TH MEETING OF THE AT ADVISORY COMMITTEE (G J Nelson) 10-oct-1985
- 20.1.1/016 LEVEL AND GAIN CONTROL IN THE AT (G J Nelson) 06-feb-1986
- 20.1.1/017 A BRIEF LOOK AT AT CALIBRATION (D L Jauncey) 20-feb-1986
- 20.1.1/018 MOLECULAR LINES AND THE AT FREQUENCY BANDS (J R Forster) 25-feb-1986
- 20.1.1/019 COMPUTATIONAL LOAD FOR BANDWIDTH SYSTHESIS (G J Nelson) 05-mar-1986
- 20.1.1/020 SWITCHING WAVEFORMS FOR THE AT RECEIVERS (G J Nelson) 27-mar-1986
- 20.1.1/021 THE PROBLEM OF THE MISSING LOW SPATIAL FREQUENCIES (M Kesteven J Caswell) 15-mar-1986
- 20.1.1/022 SYSTEM DRAWINGS (G Nelson) 23-apr-1986
- 20.1.1/023 REPORT TO THE 12TH MEETING OF THE AT ADVISORY COMMITTEE - SYSTEM OVERVIEW (G J Nelson) 23-apr-1986
- 20.1.1/024 TIMING REQUIREMENTS FOR THE AT DELAY AND FRINGE TRACKING SYSTEM (J R Forster) 6-may-1986
- 20.1.1/025 INTERFEROMETRIC MAPPING USING THE HARTLEY TRANSFORM (R N Bracewell) 21-may-1986
- 20.1.1/026 DIFFERENTIAL DELAYS IN POLARIZERS (G J Nelson) 26-jun-1986
- 20.1.1/027 LABELLING DIGITIZED IF DATA WITH TIME INFORMATION (G J Nelson) 01-aug-1986
- 20.1.1/028 IMPLICATIONS OF INCLUDING THE INTERNATIONALLY PROTECTED BANDS 2690-2700 MHZ AND 10.6 - 10.7 GHZ IN THE AT BANDS (G J Nelson) 22-aug-1986
- 20.1.1/029 LEVEL CONTROL AND TSYS MONITORING IN THE AT (G J Nelson) 23-sep-1986
- 20.1.1/030 INTEGRATION AND CYCLE TIMES IN THE AT (G J Nelson) 24-sep-1986
- 20.1.1/032 DEFINITION OF TERMINOLOGY AND QUANTITIES FOR THE AT (R P Norris) 13-oct-1986
- 20.1.1/033 BANDWIDTH AND MOSAICING SYNTHESIS (R D Ekers) 15-oct-1985
- 20.1.1/034 BANDWIDTH SYNTHESIS AND MOSAICING - CONSTRAINTS ON INTEGRATION TIMES (R N Manchester M J Kesteven) 27-oct-1986
- 20.1.1/042 AT NOMENCLATURE (M Calabretta R Norris) 11-aug-1987
- 20.1.1/047 12 GHZ METHANOL RECEIVERS FOT THE AT (R P Norris) 19-nov-1987
- 20.1.1/051 SYSTEMS OVERVIEW (G J Nelson) 24-feb-1988
20.1.2 System Testing
- 20.1.2/015 THE POLARISATION CHARACTERISTICS OF THE AT ANTENNAS (M Kesteven W Wilson) 03-may-1989
20.2 Internal Memos
- 20.2/001 A WORKING LIST OF POTENTIAL CALIBRATION SOURCES FOR SOUTHERN HEMISPHERE RADIO OBSERVATIONS - SEE 18.2/001
- 20.2/002 HIGH-FREQUENCY SPECTRAL-LINE OBSERVATIONS ON THE AT (J B Whiteoak) 13-apr-1983
20.3 Meetings of Working Group
- 20.3/001 REPORT OF AT SYSTEM CONCEPT WORKSHOP HELD AT PARKES 7-9 DECEMBER 1982 - SEE 10.1.027
20.8 System Definition Documents
- 20.8/009 AT SYSTEMS DEFINITION, VERSION NO. 9 () 21-may-1987
21.1.1 Antenna Systems - File Notes
- 21.1.1/025 POSSIBLE STATION LOCATIONS FOR COMPACT ARRAY (R N Manchester) 28-jun-1983
21.1.1.1 Antenna Systems - Technical Notes & Reports
- 21.1.1.1/009 THERMAL DISTORTION OF THE AT ANTENNAS (M J Kesteven) 29-sep-1987
- 21.1.1.1/010 THERMAL DISTORTIONS II (G Nelson M Kesteven) 17-dec-1987
- 21.1.1.1/011 THERMAL DISTORTION OF THE AT ANTENNAS II (G Nelson M Kesteven) 17-dec-1987
21.3.1.1 Feeds - Technical Notes & Reports
- 21.3.1.1/001 EFFECTS OF AXIAL SUBREFLECTOR SHIFTS ON THE AT (R Kennedy) 16-mar-1984
- 21.3.1.1/004 FEEDS FOR THE AT: THE USE OF LINEAR POLARIZATION AS IT AFFACTS VLBI AND LBA MEASUREMENTS (M Komesaroff) 29-nov-1984
- 21.3.1.1/006 FEED AND RECEIVER CONFIGURATIONS FOR PARKES - FOR LBA AND FOR SINGLE DISH WORK (M Komesaroff) 03-oct-1985
21.4.1.1 Servo Mechanisms - Technical Notes & Reports
- 21.4.1.1/001 PRELIMINARY ERROR BUDGET FOR SERVO SYSTEM (M Beavis R Evans) 20-sep-1984
21.5.1.1 Subreflectors - Technical Notes & Reports
- 21.5.1.1/001 SCIENTIFIC CONSTRAINTS ON THE ALLOWABLE SUBREFLECTOR MOTIONS FOR THE AT ANTENNAS (J R Forster) 29-feb-1984
22.1.1 Receivers - Technical Notes & Reports
- 22.1.1/003 IF CONVERSION AND NARROW-BAND ANALOG FILTERING (G Graves) 30-may-1984
- 22.1.1/004 IF ANALOG FILTERS: THEIR BANDSHAPE (G Graves) 23-oct-1984
- 22.1.1/029 SPURIOUS SIGNALS, COMB LINES AND LOCAL OSCILLATORS (G Graves) 07-apr-1988
23.4 LO Systems
- 23.4/011 A SOFTWARE SOLUTION TO THE LO DOPPLER PROBLEM (R P Norris) 31-jan-1985
23.4.1 LO Systems - Technical Notes & Reports
- 23.4.1/002 COMMUNICATION LINKS FOR THE LBA (A C Young) 10-aug-1984
- 23.4.1/003 PHASE (AND DATA) TRANSFER BY POINT-TO-POINT RADIO LINK (B Anderson) oct-1984
- 23.4.1/004 PHASE TRANSFER VIA AUSSAT (B Anderson) oct-1984
- 23.4.1/006 AT ONE DAY SYMPOSIUM ON DIGITAL VS ANALOGUE FILTERS AND THE IMPLICATIONS ON LO DESIGN (R Gough) 24-may-1984
- 23.4.1/011 A MATTER OF TERMINOLOGY 'CLOCKS' AND 'FREQUENCY STANDARDS' (J Roberts) 17-apr-1986
- 23.4.1/012 CONTROL INFORMATION FOR THE LO AND CORRELATOR (M Kesteven R P Norris) 23-nov-1986
- 23.4.1/015 LO LINE STABILISATION AND THE INTEGRATION CLOCK (M Kesteven A Young) 24-mar-1987
- 23.4.1/016 DATA TRANSMISSION SYNCHRONISATION (W E Wilson) 18-mar-1987
24.1.1 Correlator Systems - Technical Notes & Reports
- 24.1.1/005 SCIENTIFIC IMPLICATIONS OF A 16 MHZ XCELL - SEE 20.1.1.009
- 24.1.1/010 AT CORRELATOR BLOCK TECHNICAL INFORMATION (D Loone) 27-oct-1986
25.1 Computers & Processing - File Notes
- 25.1/016 CALIBRATION NOTES II - DELAYS AND PHASES THAT NEED TO BE CALIBRATED (M J Kesteven) 24-apr-1986
- 25.1/017 MONITOR POINTS WHICH PROVIDE CONTROL INFORMATION (M J Kesteven) 24-apr-1986
- 25.1/027 THE SAMPLER SYNCHRONISING CYCLE (M J Kesteven) 25-sep-1986
- 25.1/028 THE AT CLOCK(S) (M J Kesteven) 04-oct-1986
- 25.1/029 OFFLINE COMPUTER SYSTEM FOR THE AT (J E Baldwin W N Brouw R D Ekers) 30-oct-1986
- 25.1/031 THE EMPEE PROGRAM (J D Argyros) 12-jan-1987
- 25.1/035 THE XMNMP PROGRAM (J D Argyros) 06-aug-1987
25.1.1 Computers & Processing - Technical Notes & Reports
- 25.1.1/001 DATA STORAGE AND TRANSPORT REQUIREMENTS FOR THE AT (R Norris) 23-may-1984
- 25.1.1/002 ON LINE AT CORRECTIONS REVISED (M J Kesteven) 26-oct-1984
- 25.1.1/003 A SOURCE CATALOGUE FOR THE AT (R Norris) 17-sep-1984
- 25.1.1/006 THE SCHEDULING PROBLEM PART II (M J Kesteven) 23-oct-1984
- 25.1.1/007 COMPUTING REQUIREMENTS FOR AT SOFTWARE DEVELOPMENT (R Wand M Kesteven P Rayner) 24-feb-1994
- 25.1.1/007 ON-LINE SOFTWARE II (M J Kesteven) 23-oct-1984
- 25.1.1/010 REPORT OF THE DATA PROCESSING MEETING 28 MAY 1984 PART II (M J Kesteven Jrf Rpn Ptr Rhw) 28-may-1984
- 25.1.1/011 SELFCAL AND THE AT (R Norris M Kesteven) 25-nov-1984
- 25.1.1/013 AT/RP COMPUTING IN 1988 AND BEYOND (M J Kesteven) 16-jan-1985
- 25.1.1/021 A UV DATA FORMAT FOR THE AT (R Norris) 08-may-1985
- 25.1.1/024 THE CULGOORA DATA COLLECTION SYSTEM (Rhw) 28-sep-1985
- 25.1.1/025 STEERING THE AT - THE EPHEMERIS ROUTINES (M Kesteven M Calabretta) 05-mar-1986
- 25.1.1/026 OPERATING THE CA AS A TIED ARRAY THE PHASING PROBLEM (M J Kesteven) 22-jan-1986
- 25.1.1/028 DRAFT SPECIFICATION FOR RPFITS (R P Norris) 24-feb-1986
- 25.1.1/029 CALIBRATION NOTES I ANTENNA ERRORS (M J Kesteven Mrc) 17-apr-1986
- 25.1.1/030 IONOSPHERIC CORRECTIONS (M J Kesteven) 31-mar-1986
- 25.1.1/033 THE AT CATALOGUE (R P Norris) 29-sep-1986
- 25.1.1/037 DEFINITION OF TERMINOLOGY AND QUANTITIES FOR THE AT (R P Norris) 13-oct-1986
- 25.1.1/038 AT PROGRAMMING STANDARDS (R P Norris) 19-dec-1986
- 25.1.1/041 MAXIMUM DATA RATES BETWEEN ACC AND DATA SETS (D Ferris) 28-jan-1987
- 25.1.1/043 CONTROL INFORMATION (M J Kesteven) 14-mar-1987
- 25.1.1/044 DATA SET TYPES AND OPTIONS (D Ferris) 26-feb-1987
- 25.1.1/045 PROGRAMMER'S GUIDE TO THE AT DATASET (M Kesteven R Ferris) 22-jan-1987
- 25.1.1/047 DATA PROCESSING FOR THE AUSTRALIAN TELESCOPE (R P Norris) 11-sep-1987
- 25.1.1/050 DATA TRANSFER FOR THE AT (R P Norris) 07-jan-1987
- 25.1.1/051 CALIBRATION OF THE AUSTRALIAN TELESCOPE (R P Norris) 22-feb-1988
27.7 VLBI
- 27.7/002 AN ASIAN/PACIFIC VLBI FACILITY (R P Norris) 15-sep-1987
- 27.7/003 FUTURE DEVELOPMENT OF THE PTI (R P Norris) 25-feb-1988
29.1 QUASAT - File Notes and General
- 29.1/008 QUASAT REPORT ON THE PHASE A STUDY (B Anderson A Van Ardenne A Baudry A Benz R S Booth A Ferrari D W Murphy E Preuss R T Schilizzi G Tofani P N Wilkinson) oct-1988
39.0 AT Operations Files - Technical Documents
- 39.0/001 ATNF DOCUMENTATION (W Walsh) 24-jun-1991
- 39.0/003 CSIRO-DIT COLLABORATION TECHNOLOGY REVIEW (M Lloyd) 23-apr-1993
39.1 AT Manuals
- 39.1/008 PHOENIX SOFTWARE (M Kesteven E Troup) 01-feb-1995
- 39.1/009 PHASE TRANSFER SYSTEM TECHNICAL MANUAL (A Young G Mcculloch M Hayes R Gardyne) 01-apr-1996
- 39.1/010 AUSTRALIA TELESCOPE LOCAL OSCILLATOR SYSTEMS (A C Young) 24-jan-1990
39.2 AT Technical Data
- 39.2/010 MEASUREMENTS OF THE ATCA PRIMARY BEAM (M H Wieringa M J Kesteven) 08-sep-1992
- 39.2/011 TILT RESULTS (I) (H Du M Kesteven) 21-nov-1992
- 39.2/012 TILT RESULTS (II) (H Du M Kesteven) 05-dec-1992
- 39.2/013 INTELLIGENT AT FAULT DIAGNOSIS SYSTEM USERS' MANUAL (R Landau) 04-may-1993
- 39.2/014 THE AUSTRALIA TELESCOPE DATA ARCHIVING PROBLEM (S W Amy D Mcconnell R M Wark) 28-apr-1993
- 39.2/015 SCHEDULING COMPACT ARRAY CONFIGURATIONS (G Nelson) 02-jun-1993
- 39.2/016 CRYOGENICS MAINTENANCE MANUAL NARRABRI & MOPRA (M Bland) 27-nov-1992
- 39.2/017 WIND TORQUES ON ANTENNAS (Connell Wagner Pty Ltd) 20-apr-1993
- 39.2/018 TRANSIENT RESPONSE OF THE RECEIVER SYSTEM - IMPLICATIONS FOR BANDWIDTH SYNTHESIS (R Gough) 17-aug-1993
- 39.2/019 ARRAY CONFIGURATIONS AND LENGTH OF SCHEDULING PERIOD (G Nelson) 04-nov-1993
- 39.2/020 PHASE JUMPS IN THE AT PHASE ROTATOR MODULES (A Bish) 22-nov-1993
- 39.2/021 MOPRA MEETING MINUTES AND THEIR UPDATE (G Baines) 19-jul-1993
- 39.2/022 RECEIVER SYSTEM TEMPERATURES (R Gough) 19-jan-1994 (duplicates 39.3/034)
- 39.2/024 ATCA RECONFIGURATION CALIBRATION AND IMPLICATIONS FOR NEW CONFIGURATIONS AND STATIONS (D J Mckay) 22-nov-1996
- 39.2/031 THERMAL CONDUCTIVITY CONSIDERATIONS OF STAINLESS STEEL COMPONENTS (B Kingdom) 23-nov-1992
- 39.2/032 INTELLIGENT AT FAULT DIAGNOSIS SYSTEM: REPORT TO DATE (R Landau) 19-nov-1992
- 39.2/033 DATA SET PRODUCTION: THE FINAL RECKONING? (D Ferris) 11-mar-1993
- 39.2/034 AT TECHNICAL REPORT NO. E1: CULGOORA WEATHER STATION (M J Kesteven) 29-jun-1988
- 39.2/035 THE AT MONITORING SYSTEM (M J Kesteven) 26-mar-1990
- 39.2/036 COMPACT ARRAY COMPUTERS AND SOFTWARE (M J Kesteven) 13-oct-1990
- 39.2/037 INTELLIGENT MONITOR SYSTEM FOR THE AUSTRALIA TELESCOPE (M Kesteven) 01-jun-1990
- 39.2/053 VLBI TEST TONE UNIT (R Gough G Herbert) 22-sep-1993
- 39.2/055 INTERFERENCE ON THE COMPACT ARRAY AND SHIELDING RECOMMENDATIONS (R Gough) 22-mar-1994
- 39.2/056 RECEIVER UPGRADE FOR S2 METHANOL VLBI OBSERVATIONS AT 12.2 GHz (R Gough) 28-mar-1994
- 39.2/059 FAULTY: REPORT FROM IJCAI-93 ARTIFICIAL INTELLIGENCE CONFERENCE IN FRANCE (R Landau) 30-aug-1993
- 39.2/060 MOPRA POINTING INTERIM REPORT #1 (M J Kesteven) 22-may-1994
- 39.2/061 MOPRA HOLOGRAPHY INTERIM REPORT #1 (M J Kesteven) 22-may-1994
- 39.2/063 HOT BOX MEASUREMENT OF COMPACT ARRAY RECEIVER SYSTEM TEMPERATURES (R Gough) 22-jul-1994
- 39.2/064 CRYOGENIC PERFORMANCE OF DRP 12 GHz MMIC AMPLIFIER (R Gough) 21-nov-1995
- 39.2/065 ATMOSPHERIC NOISE CONTRIBUTION TO RECEIVER SYSTEM TEMPERATURE AT 35-50 GHZ (R Gough) 05-feb-1996
- 39.2/066 CRYOGENIC PERFORMANCE OF DRP 25-40 GHz MMIC AMPLIFIER (R Gough) 09-mar-1996
- 39.2/067 12 MM RECEIVER FOR SHANGHAI OBSERVATORY (R Gough) 12-apr-1996
- 39.2/068 PERFORMANCE OF THE 12MM RECEIVER ON SHANGHAI 25M RADIOTELESCOPE / SHANGHAI TRIP REPORT (R Gough) 14-may-1996
- 39.2/071 MANUAL NO. K2, ANALYSIS OF AUSTRALIA TELESCOPE COMPACT ARRAY DATA WITH AIPS (N Killeen) 27-nov-1993
- 39.2/072 CRYOGENIC PERFORMANCE OF DRP 1-14 GHz MMIC AMPLIFIER (R Gough) 29-aug-1996
39.3 AT Technical Document Series
- 39.3/001 AT TECHNICAL REPORT NO E1 CULGOORA WEATHER STATION (M J Kesteven) 29-jun-1988
- 39.3/002 THE POLARISATION CHARACTERISTICS OF THE AT ANTENNAS (M Kesteven W Wilson) 03-may-1989
- 39.3/003 THE AT MONITORING SYSTEM (M J Kesteven) 26-mar-1990
- 39.3/004 MILLIMETRE WAVE CAPABILITY FOR THE AUSTRALIAN TELESCOPE: A DISCUSSION DOCUMENT FOR USERS (P Hall) 11-jul-1990
- 39.3/005 COMPACT ARRAY COMPUTERS AND SOFTWARE - SEE 39.2.036
- 39.3/006 EFFECTS OF SHADOWING AT THE AT (R Subrahmanyan) 07-jan-1991
- 39.3/007 SOME SIMULATIONS OF SELF-CALIBRATION FOR THE AT -- SEE 39.3.058
- 39.3/008 SOME SIMPLE MOSAICING CALCULATIONS FOR THE AT -- SEE 39.3.059
- 39.3/009 LBA - A DISCUSSION DOCUMENT (A Tzioumis) 18-apr-1991
- 39.3/010 SYSTEM TEMPERATURE CALIBRATION OF THE AUSTRALIA TELESCOPE RECEIVER SYSTEMS (M W Sinclair R G Gough) 13-jul-1991
- 39.3/011 THE MONITORING SYSTEM FOR THE AUSTRALIA TELESCOPE (R G Gough M J Kesteven) 12-jul-1991
- 39.3/012 AT PRIMARY BEAM MEASUREMENTS AT 20CM (L Staveley-smith M J Kesteven R Subrahmanyan) 26-jul-1991
- 39.3/013 INITIAL RESULTS OBTAINED WITH THE 30 GHz RADIOMETER (R Gough R K Flavin) 02-sep-1991
- 39.3/014 AUSTRALIA TELESCOPE CORRELATOR COMPUTER UPGRADE (D Loone) 10-sep-1991
- 39.3/015 AT POLARISATION CALIBRATION (R J Sault N E B Killeen M J Kesteven) 19-sep-1991
- 39.3/016 AIPS++ USER SPECIFICATIONS (Atnf Staff And Users) 18-dec-1991
- 39.3/017 INSTALLATION OF A 70-115 GHZ RECEIVER ON THE MOPRA ANTENNA (J M Payne) mar-1992
- 39.3/018 ATNF AIPS++ TECHNICAL SPECIFICATIONS (N Killeen) 01-may-1992
- 39.3/019 MULTI-FREQUENCY SYNTHESIS WITH THE ATCA (R J Sault) 08-may-1992
- 39.3/020 A SURVEY OF THE INTERFERENCE IN THE 13 AND 20CM BANDS AT THE ATCA (M H Wieringa R Subrahmanyan) 18-may-1992
- 39.3/021 REMOTE AND UNATTENDED OBSERVING AT NARRABRI (P Hall) 19-may-1992
- 39.3/022 AIPS++ CONSORTIUM USER SPECIFICATIONS: ATNF PRIORITIES (Atnf Staff And Users) 19-may-1992
- 39.3/023 INTERFERENCE WITHIN THE ANTENNA CONVERSION SYSTEM (G Graves R Gough S Amy M Wieringa) 01-sep-1992
- 39.3/024 MEASUREMENTS OF THE ATCA PRIMARY BEAM (M H Wieringa M J Kesteven) 08-sep-1992
- 39.3/025 AT OPERATION AT MILLIVETRE WAVES: PROGRESS REPORT FOR USERS (P J Hall M H Wieringa D A Abbott D McConnell M J Kesteven) 06-nov-1992
- 39.3/026 EXTRA STATIONS FOR THE COMPACT ARRAY (J L Caswell L Staveley-smith) 19-nov-1992
- 39.3/027 THE AUSTRALIA TELESCOPE DATA ARCHIVING PROBLEM -- SEE 39.2.014
- 39.3/028 AT COMPACT ARRAY BANDPASS VARIABILITY (R J Sault) 25-mar-1993
- 39.3/028a A 21-CM MULTI-BEAM RECEIVER (R D Ekers K C Freeman R F Haynes D S Mathewson L Staveley-smith A E Wright) 19-mar-1993
- 39.3/029 HI MULTIBEAM RECEIVER: RECORD OF PLANNING SESSION 16-sep-1993
- 39.3/030 AUSTRALIA TELESCOPE COMPACT ARRAY AUTOMATIC TURRET ROTATION (D Mcconnell) 20-aug-1993
- 39.3/031 COMPACT ARRAY POINTING THERMAL EFFECTS (R Wark D Hong D Mcconnell) 22-sep-1993
- 39.3/032 AUSTRALIA TELESCOPE COMPACT ARRAY SPECTRAL PERFORMANCE AT 8 GHZ (D Mcconnell K R Anantharamaiah W E Wilson) 23-sep-1993
- 39.3/033 THE SIGN OF STOKES V, ET CETERA (R J Sault) 14-jan-1994
- 39.3/034 RECEIVER SYSTEM TEMPERATURES (R Gough) 19-jan-1994 (duplicates 39.2/022)
- 39.3/035 MULTIBEAM PROJECT CORRESPONDENCE (L Staveley-smith) 03-mar-1994
- 39.3/036 MULTIBEAM PROJECT CORRESPONDENCE (L Staveley-smith) 23-feb-1994
- 39.3/038 PRELIMINARY INTERFERENCE SURVEY - NO. 1 (MOPRA) (M W Sinclair M A Bowen) 11-may-1994
- 39.3/039 AUSTRALIA TELESCOPE COMPACT ARRAY FLUX CALIBRATION (D Mcconnell D J Mckay)
- 39.3/040 A REVISED FLUX SCALE FOR THE AT COMPACT ARRAY (J Reynolds) 29-jul-1994
- 39.3/041 SETI CIRCULAR POLARISATION REQUIREMENTS (G Graves) 05-sep-1994
- 39.3/043 MODIFIED MOPRA CONVERSION SYSTEM (G Graves) 20-sep-1994
- 39.3/044 THE PARKES SPECTRAL LINE BASELINE PROBLEM- WILL IT BE EXACERBATED BY THE UPGRADE? (M Kesteven) 09-dec-1994
- 39.3/045 THE SYN PROJECTION (M Calabretta M Kesteven) 03-mar-1995
- 39.3/046 PRIMARY BEAMS AND MOSAICING (Miriad User's Guide)
- 39.3/047 THE COST OF THE MM UPGRADE OF THE MOPRA ANTENNA (M Kesteven) 07-jan-1995
- 39.3/048 MODIFICATIONS TO THE MOPRA ANTENNA TO ENHANCE THE MM WAVE CAPACITY (J M Payne) mar-1995
- 39.3/049 SUMMARY OF THE INITIAL TESTS OF THE MOPRA MM RECEIVER (G Moorey M Kesteven) 30-dec-1994
- 39.3/050 PHASE CORRECTION (P Hall) 24-apr-1995
- 39.3/051 COMPACT ARRAY HOLOGRAPHY (M J Kesteven G R Graves D J Mckay) 30-jun-1995
- 39.3/052 NARRABRI S-BAND BEAM PATTERNS (M Kesteven) 10-jul-1995
- 39.3/053 SOME COMPARISONS BETWEEN THE DIFFERENT DESIGN CONCEPTS UNDERPINNING THE WIDEBAND QUAD-RIDGED CIRCULAR-WAVEGUIDE OMTS FOR THE L/S AND THE C/X DUAL-BANDS (B MacA Thomas) 16-aug-1995
- 39.3/054 AN L-S BAND FRONT END UPGRADE FOR THE COMPACT ARRAY AND MOPRA (M W Sinclair) 01-nov-1995
- 39.3/055 EFFECT OF OMT FIN SHAPE ON THE ATNF L/S HORN PERFORMANCE: RPP NO 3794 (C Granet) 29-sep-1995
- 39.3/056 A FUTURE DEVELOPMENT PROJECT THE L-S BAND UPGRADE (M Kesteven) 18-dec-1995
- 39.3/057 EFFECTIVE SPECTRAL RESOLUTION OF THE ATNF CORRELATOR (N Killeen) 24-jan-1996
- 39.3/058 SOME SIMULATIONS OF SELF-CALIBRATION FOR THE AT (R J Sault) 16-apr-1991
- 39.3/059 SOME SIMPLE MOSAICING CALCULATIONS FOR THE AT (R J Sault) 16-apr-1991
- 39.3/060 LIMITS TO THE AT ANTENNA POINTING PRECISION (I) - TILTMETER TESTS (M Kesteven D J Mckay) 16-nov-1996
- 39.3/062 PARKES HOLOGRAPHY AND OPTICAL SURVEY (M Kesteven G Graves M Calabretta B Parsons) 02-nov-1995
- 39.3/063 THE 1KT ARRAY: SOME THOUGHTS ON THE OVERALL ANTENNA SPECIFICATIONS AND CONCEPTS FOR AND PERFORMANCE OF A (100M) PHASED-ARRAY ELEMENT (B MacA Thomas) 03-feb-1997
- 39.3/064 THE 1KT - APPLICATION OF PHASED ARRAY TECHNOLOGY (PART 2) (B MacA Thomas) 01-may-1997
- 39.3/065 INTERFERENCE EXCISION TECHNICAL MEETING NO. 1 (B MacA Thomas) 14-apr-1997
- 39.3/066 CEDUNA-1 SURVEY (M Kesteven B Parsons) 11-oct-1996
- 39.3/067 CEDUNA-1 SECOND SURVEY (M Kesteven B Parsons) 25-jun-1997
- 39.3/068 AUSTRALIA TELESCOPE DATA ANALYSIS: CONTINUUM MAPPING USING THE AIPS SYSTEM (R F Haynes R T Stewart N Junkes) 08-nov-1989
- 39.3/069 HAS THE PARKES REFLECTOR SURFACE CHANGED AS A RESULT OF THE UPGRADE? (M Kesteven B Thomas G Graves B Parsons M Calabretta) 28-jan-1997
- 39.3/070 MECHANICAL STABILITY OF THE AT SUBREFLECTORS (M Kesteven B Parsons) 08-jul-1997
- 39.3/071 FIELD ROTATION DUE TO AN ANTENNA'S POINTING MODEL (M Kesteven) 24-jul-1997
- 39.3/072 ANTENNA ON THE RAIL OBSERVATIONS (M Kesteven B Parsons) 03-oct-1997
- 39.3/073 THE AUSTRALIA TELESCOPE MILLIMETRE-WAVE UPGRADE (P J Hall J W Brooks M W Sinclair W E Wilson M J Kesteven) 03-oct-1997
- 39.3/074 THE TIDBINBILLA 34M BEAM WAVEGUIDE ANTENNA: FEEDING ARRANGEMENTS AND OPERATIONS AT 4.8 TO 6.8 GHZ (B MacA Thomas) 22-oct-1997
- 39.3/075 MEASUREMENT OF FIBEROPTIC LINK PERFORMANCE (J W Lamb) 09-apr-1997
- 39.3/076 THE 1KT PROJECT: ANTENNA REFERENCE RADIATION PATTERNS FOR ARRAY ELEMENTS FOR SYSTEM PERFORMANCE EVALUATION: PART 1 - REFLECTOR ANTENNAS (B MacA Thomas) 29-jan-1998
- 39.3/077 THE TIDBINBILLA 34 M BEAM WAVEGUIDE ANTENNA: USE OF THE 2.86 TO 5.35 GHZ HORN FOR 4.8 GHZ OPERATION (B MacA Thomas) 03-feb-1998
- 39.3/079 THE SIDELOBE PERFORMANCE OF THE UNIVERSITY OF TASMANIA CEDUNA 30 M ANTENNA NEAR 6.7 GHZ (B MacA Thomas) 29-oct-1997
- 39.3/080 THE UNIVERSITY OF TASMANIA CEDUNA ANTENNA: FEED HORN DESIGN AND PERFORMANCE NEAR 22 GHZ (B MacA Thomas) 16-mar-1998
- 39.3/082 THE GRAVITATIONAL DEFORMATION OF THE CEDUNA-1 ANTENNA (M Kesteven B Parsons) 09-jul-1998
- 39.3/083 TRITON ANTENNA SURVEYS (B Parsons B Wilcockson M Kesteven) 30-jul-1998
- 39.3/084 THE BASELINE RIPPLE PROBLEM: THE MEASUREMENT PROGRAM AT PARKES IN JUNE 1998 (B MacA Thomas G R Graves L Staveley-smith M J Kesteven R M Price) 16-jan-1999
- 39.3/085 AT SUBREFLECTOR ADJUSTMENT - THEORY AND PRACTICE (M Kesteven B Parsons) 02-dec-1998
- 39.3/086 EMA-FN98/13: DROP IN GAIN OF THE AUSTRALIA TELESCOPE ANTENNAS AT 86 GHZ DUE TO AXIAL SUBREFLECTOR MOVEMENT (C Granet) 16-dec-1998
- 39.3/087 AN EVOLUTIONARY APPROACH TO THE DEVELOPMENT OF THE "SQUARE KILOMETRE ARRAY" (B MacA Thomas) 22-jan-1999
- 39.3/088 THE ATCA 13-CM POLARIMETRIC RESPONSE (R J Sault M Ehle) 14-may-1996
- 39.3/089 SOME GENERAL ANTENNA CONSIDERATIONS FOR LF-SKA AND WHY THE "MAGIC-CARPET" CONCEPT COULD BE A "DINGO" (B MacA Thomas) 11-feb-1999
- 39.3/091 THE ATNF NARRABRI FACILITIES: SUMMARY OF THREE STUDIES TO ENABLE THE 6-KM ANTENNA TO BE SHIFTED TO THE MAIN 3-KM TRACK (B MacA Thomas) feb-1999
- 39.3/092 30GHZ HOLOGRAPHY RECEIVERS (G Graves) 19-apr-1999
- 39.3/093 HOLOGRAPHY INSTRUMENTATION (G Graves M Kesteven) 06-may-1999
- 39.3/095 FOCAL-PLANE ARRAYS - SOME BASIC CHARACTERTISTICS AND AND AN APPLICATION TO HF-SKA (B MacA Thomas) 16-jul-1999
- 39.3/096 SKA: MATCHING THE SPECIFICATIONS AND ANTENNA TECHNOLOGIES (B MacA Thomas) 19-jul-1999
- 39.3/097 THE ANALYSIS OF AN INPUT TRANSITION FOR THE CEDUNA HORN NEAR 12GHZ (B MacA Thomas C Granet) 03-aug-1999
- 39.3/102 Circular Polarization User's Guide (D Rayner) 16-nov-2000
- 39.3/103 Sydney Uni. Report on Optical Fibre signal distribution & Filters for SKA Array Interference Mitigation (RA Minasian/KE Alameh) 30-aug-2000
- 39.3/104 1. LO leakage into Water Vapour Radiometer (G Graves/M Bowen) 20-dec-2000
- 39.3/105 2. Calibration using noise from the fibre optic Local Oscillator System (G Graves/M Bowen/M Leach) 28-jan-2001
- 39.3/106 Wide-band circular polarizers made with quarter-wave and half-wave plates (P Lilie) 6-nov-2001
- 39.3/107 Cryogenic Plumbing Installation, Mt Pleasant observatory, Tasmania (P Sykes) 7-may-2001
- 39.3/108 18-25 GHz Prime-focus horn for Uni of Tasmania antenna, Hobart (B Thomas) 4-may-2001
- 39.3/109 Photogrammetric Measurement Report: Deformation Measurements of Antenna #2 ATNF, Narrabri by Vision Metrology Services Uni of Melbourne 12-feb-2002
- 39.3/111 The Photogrammetric Study of a Narrabri Antenna (M Kesteven/B Parsons) 15-apr-2002
- 39.3/112 Parkes Wind Loading - Calibration (M Kesteven) 29-apr-2002
- 39.3/113 mm Performance of the ATCA Antennas I: Effects of Tilts & Displacements in the Optics (R Subrahmanyan) 23-apr-2002
- 39.3/114 Parkes Rack Bolts Report (J Reynolds) 6-may-2002
- 39.3/115 mm Performance of the ATCA Antennas II: Effects of
Gravity Deformations (R Subrahmanyan) 25-july-2002
- 39.3/116
ATCA
Antenna Beam Patterns and Aperture Illumination (J Cole & R
Subrahmanyan) 30-July-2002
- 39.3/117 Mm performance of the ATCA antennas III: compensating for the effects of gravity deformation (R Subrahmanyan) 23-Sept-2002
- 39.3/119 Gravity Distortion Correction via Subreflector Motion (Bill Imbriale ) 19-Mar-2003
- 39.3/120 Fibre Optic Transmitter Module B1 & Receiver module B2 technical manual Ver 2.1 (Brett Hiscock) 08-Aug-2003
- 39.3/121 Aperture illumination in the Compact Array antennas across the 12mm band (Nicholas Ebner & Ravi Subrahmanyan) 19-Jan-2004
- 39.3/122 Results from the CA Seeing Monitor (Enno Middelbert) 19-Apr-2005
- 39.3/123 ATNF Scientific Computing Group Review (Vince McIntyre) 3-May-2005
- 39.3/124 ATCA Flux Density Scale at 12mm (Bob Sault) 7-Dec-2003
- 39.3/125 Review of Narrabri/Mopra On-line Software (Bob Sault, John Reynolds & Dave McConnell) 16-Nov-2005
- 39.3/126 An Analysis of Tropospheric Properties of the Mileura Site (Bob Sault) 18-Oct-2005
- 39.3/127 Cryogenic Performance of Millitech Model FBI-22 Waveguide Isolator (Russell Bolton & Russell Gough) 2-May-2006
- 39.3/128 Commissioning Report for the ATCA L/S Receiver Upgrade Project (N. M. McClure-Griffiths, J. B. Stevens, & S. P. O’Sullivan) 8-June-2011
- 39.3/129 Calibrating linear polarization data at 16 cm with ATCA/CABB (D. Schnitzeler, J. Banfield, B. Emonts, C. Hales, E, Lenc, R. Norris, N. McClure-Griffiths, D. McConnell, S. O’Sullivan and J. Stevens) 7-December-2011
- 39.3/130 Required cadence for the 10/50cm dual band receiver for pulsar observations (G. Hobbs, M. Keith, W. Coles, R. Manchester, R. Shannon, V. Ravi) 11-July-2012
- 39.9/131 Modelling sources in broad-band ATCA visibility data (D. McConnell) 17-January-2013
- 39.9/132 Accelerometer measurements on the Parkes Telescope (D. McConnell, B. Preisig) 13-December-2012
40.3 Parkes Technical Document Series
- 40.3.1/033 Parkes Radiotelescope - Report on Telescope Behaviour & Operation Under Wind Loading Conditions (Connell Wagner Pty Ltd) April-1993
- 40.3.1/038 Pointing and Carriage Motion Algorithms - Preliminary Version (M.Kesteven) 22-Nov-1995
- 40.3.1/039 Parkes 64M Radiotelescope: Estimated Surface Power Transmission Factors for the perforated and mesh surfaces
- 40.3.1/101 Parkes windloading following the JPL upgrade (Mike Kesteven) 8-Apr-2002
- 40.3.1/102 Parkes Counterweight Issues (Mike Kesteven) 4-May-2002
- 40.3.2/001 Parkes RFI Environment and Mitigation (R. N. Manchester) May-2013
- 40.3.2/002 Development of an Ultra-Wideband (UWL) Receiver System at Parkes (R. N. Manchester (for the PPTA team), E. Carretti, R. P. Norris and C. J. Phillips) 7-Jun-2013