ATNF Opera-ons
ATUC
Douglas Bock, Assistant Director -
Opera-ons 11 June 2013
CSIRO Astronomy and Space Science


Changes to the Parkes Infrastructure
· Major program of Electricity reliability upgrades complete · UPS for Parkes drives (park dish safely) · Remote control of instrumentaEon and drives · Timing system , incl. new maser enclosure · Telescope protecEon system, incl. drive stability monitor · New digital backend (UWA etc.) · (BUT no new receivers)

ATUC 2013 June -
-
ATNF OperaEons


Changes to the Parkes Model
· Default remote observing (from the SOC) · Project experts provide team "self-
support" · Stow unEl morning · New performance metrics and targets that capture down Eme. § Data quality responsibility of the observer § Telescope safety responsibility of the observatory
ATUC 2013 June -
-
ATNF OperaEons


Parkes Observing from the SOC (Sydney)

· OperaEonal Readiness Review (ORR) 24 June · Remote observing expected to become rouEne aVer that

ATUC 2013 June -
-
ATNF OperaEons


Parkes receivers ­ ATUC priori-es?
1. The Pulsar Timing Array (PTA) is a key science area for Parkes. The telescope must be equipped with a world-
leading Pulsar receiver, like the present 10-
50 cm
receiver.


2. T

he top spectral line use currently is studies of HI to trace galaxy evoluEon, from the MW and MCs to distant galaxies, using a range of techniques including intensity fluctuaEon mapping. are important star formaEon tracers, and Parkes is the only large single-
dish telescope readily available in the southern hemisphere to map these lines. with Parkes have become an important use of the telescope in recent years, and this is likely to conEnue.

3. Methanol and NH3



4. PolarisaEon surveys 5. VLBI

remains a crucial applicaEon, as Parkes is the only large aperture that is consistently available in the LBA, which is the only southern hemisphere VLBI facility.

ATUC 2013 June -
-
ATNF OperaEons


Parkes Down-me due to Zenith Brakes
ISSUE SUMMARY ь April/May: Intermiaent fault with potenEally serious consequences ь Root Cause: Change to brake actuator calibraEon procedure, complicated by: The many MCP/UPS/TPS/SERVO mulEple upgrade/system changes; reducEon of staff numbers with 64m drive system experEse; > ACTION: Upgrade of exisEng Fault ReporEng & Tracking and a new Work Order System will enforce configuraEon management. ATUC 2013 June -
-
ATNF OperaEons 6|


ATCA Support Infrastructure
ь ATCA Control Building AircondiEoning: Currently being replaced ь ATCA Power Reliability: `The Lemon' standby generator about to be replaced with a near new 250kVA unit.

7| ATUC 2013 June -
-
ATNF OperaEons


S-
band Wireless Rollout
OUTCOMES ь 200 NSW NBN base staEons coordinated under an NDA ь some RFI impact on PKS observing successful negoEaEons reduced worst case RFI levels by ~ 20dB; NBN agreed to remove one base staEon altogether; agreed changes to antenna type & orientaEon for a further 12 staEons a template for future NBN rollouts
8| ATUC 2013 June -
-
ATNF OperaEons


Mopra update
· Bushfire on 13 January (insured) · Observing restarted 6 May
· Electronics and surface OK · VLBI fringes found to Narrabri

· Contracts with NAOJ and UNSW (+Adel) signed (first "year" 13 months) · No May call for community Eme; next call (Dec) for 2014 Apr-
Oct

ATUC 2013 June -
-
ATNF OperaEons


Mopra Restora-on
ь Site cleanup, mains power, switchboards, standby generator + control systems, cryo leaks, drive system hydraulics, correlator, computers, smoke damaged instrumentaEon. ь Access to clean water, sanitaEon, protecEon from the elements for visiEng staff & contractors.
10 | ATUC 2013 June -
-
ATNF OperaEons


http:// youtu.be/ WlHP9J1UP rs

ATUC 2013 June -
-
ATNF OperaEons


Opera-ons staff update
ff (by sit(by site)May 2013 2013 ns Staff e) as at as at May
· SoVware and CompuEng Group (Juan Carlos Guzman) · Telescope Monitor and Control (JC Guzman) · Science Data Processing (Ben Humphreys) · Science Data Management (Jessica Chapman)
Jessica Chapman (M)

ilfredo Pena (G) (G) Michael ReaLou Puls (G) Barry Turner (G) Reay (G)emma Whiting urner (G) y (G) Michael G Barry T Ge (M) Shaun Amy mma Whiting Shaun Ka Kate n Jes Douglas Bock (M)Amy (M) te Brooks (M) Bock (M)sica ChapmaBrooks (M) Douglas (G) (G) (M)

· Deputy Head, ATNF OperaEons (Kate Brooks)
muehlumphreysElsa KacBalt lIadermuehlekadi KosElsa iKachwalla ny MahArk(M) Kosmynin hwa ln Vince McInt Ben H e To e adi Malte ny Maher (M) ave McConnell alte Vince McIntyree McConnNeale Morison (M) yre (M) To D M Dav (M) ell Ar myn n ) (M) (C) (M) (M) (C) (M) Marquading (M) (M)Marquading (M) (M) (M) (M) Neale Morison (M)

· Geraldton/MRO (Site Manager, Barry Turner) and SoVware & CompuEng groups have moved to operaEons · Jordan Rex (Mech.) and Murray Tindal (Elec./property) new staff members at Narrabri
Brian Johnson (N) Murray Tindal (N)

h Br m Chr sto m Xinyu Wu (M) ChristopJohneBateman Dave Brodrick i(N)ph BreSue Dodd (N) (C) an (N) (N) Brett Hiscock (N)Hill (N) Brian Johnson (N) Brett Hiscock (N) Ky bes Dodd Kylee Mike Dave Brodrick (N)lee ForSue (N) (N) (C)Mike Hill (N) Forbes (N) (N) (N)

me Gra eter (N)tschin (Nouise PrestagMunting (N) ting Mir L) Scott e Meg Reesouise Prestage L (N) Jordan Rex (N) Rees (N) Meg Mick Shields (N) Rex (N) Jordan Jamie Stevens (N) Mick Shields (N) GraeJamie Stevens Murray Tindal (N) eme (N) Sunderland (N) Sunderland (N) (N) (N)

ATUC 2013 June -
-
ATNF OperaEons ATNF Steering Commiaee -
OperaEons | Douglas Bock | Page 12
retti (P) ady (P) Scott Br Daniel Craig (P) Ettore Carretti (P) Crocker (P) Craig (P) John Daniel Glen D'Mello (P) John Crocker (P) Evans (P) D'Mello (P) Hockings Evans (P) (C) Anne Glen (C) Julia Anne (P) Julia Hockings Shirley Ingram (P) yle (P) (P) Simon Hoyle (P) Simon Ho Shirley Ingram (P)


ATNF Opera-ons Staffing Transi-on
Work area (FTEs) ASKAP ­ engineering & site ATCA/Mopra ­ engineering & site Parkes ­ engineering & site Marsfield engineering support Telescope ops and science Serv. Visitor services CompuEng infrastructure SoVware and compuEng Theme management Total 2013-
14 12 12 9 2 7 5 7 13 1 69 2015+ (baseline plan) 12 (currently 9) 12 9 2 12 5 7 10 * 1 71

ATUC 2013 June -
-
ATNF OperaEons


ATNF Opera-ons top priori-es
Sustainable funding Complete Parkes model transiEon Sustainable WA operaEons SupporEng ASKAP commissioning

ATUC 2013 June -
-
ATNF OperaEons


Informa-on & Input opportuni-es
· ATNF Community MeeEng; ASA Tue 9 July at 5:45pm · University visits beginning in August 1. ASKAP progress and scope 2. ASKAP early science 3. OpEons for the ATNF Observatories

15 | ATUC 2013 June -
-
ATNF OperaEons




Up all night with ATCA

hap://www.youtube.com/watch? feature=player_embedded&v=Gvd68kIPf3E hap://www.youtube.com/watch?v=TCVmacSNfQM hap://www.youtube.com/watch?v=NqGVv6JKC3c
ATUC 2013 June -
-
ATNF OperaEons


We acknowledge the Wajarri Yamatji people as the traditional owners of the Murchison Radio-Astronomy Observatory site.

Thank you
Astronomy & Space Science Douglas Bock Assistant Director, OperaEons t +61 2 9372 4100 E Douglas.Bock@csiro.au w www.csiro.au/atnf
Astronomy and Space Science

ATNF Steering Commiaee -
OperaEons | Douglas Bock | Page 17