Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.arcetri.astro.it/irlab/luna/firpo/firpo.messages.php
Дата изменения: Unknown
Дата индексирования: Mon Feb 4 10:38:33 2013
Кодировка:

Поисковые слова: arp 220
FIRPO News


Main Sections
LabIR main page
Instrument page
Documentation
Science Publications

Special Sections
Software Page
Inside the Lab
LabIR staff

Companion Pages
Skysoft Home
Tirgo Page
Tirgo Archive
LabIR Hotlist
Lunar occultations
AO star finder
Simple calculator



FIRPO MESSAGES

Last modified on Feb 28, 1999 by A. Richichi

  • >message #1: from ChL, 23 Aug 96, about check and switch-on tests (in German)
  • >message #2: from AR, Aug 96, about the performance of the 1.23 masked mirror.
  • >message #3: from AR, Nov 96, about the 1.23 mirror and limiting magnitudes for Lo and photometry.
  • >message #4: from AR, Nov 96, about the setup in the control rooms of the 1.23 and 2.2
  • >message #5: from AR+SRi, Mar 97, about the ADC cards and the filter/clock box.
  • >message #6: from AR, Mar 97, about the limiting magnitudes after the March 97 run.
  • >message #7: from AR, May 97, about the characteristics of the new filter/offset box.
  • >message #8: from AR, Aug 97: the FIRPO photometric system and recommendations.
  • >message #9: from SRi, Aug 97: more on the new filter/offset box, and the use of a generator as a clock.
  • >message #10: from AR, Feb 99: about the new and old FIRPO setup.



Back to the following homepages: Lunar Occultations, FIRPO. Comments to luna@arcetri.astro.it