|
FIRPO MESSAGES
Last modified on Feb 28, 1999 by
A. Richichi
-
>message #1: from ChL, 23 Aug 96, about check and
switch-on tests (in German)
-
>message #2: from AR, Aug 96, about the
performance of the 1.23 masked mirror.
-
>message #3: from AR, Nov 96, about the
1.23 mirror
and limiting magnitudes for Lo and photometry.
-
>message #4: from AR, Nov 96, about the
setup in the control rooms of the 1.23 and 2.2
-
>message #5: from AR+SRi, Mar 97, about the
ADC cards and the filter/clock box.
-
>message #6: from AR, Mar 97, about the
limiting magnitudes after the March 97 run.
-
>message #7: from AR, May 97, about the
characteristics of the new filter/offset box.
-
>message #8: from AR, Aug 97: the
FIRPO photometric system and recommendations.
-
>message #9: from SRi, Aug 97: more on
the new filter/offset box, and the use of a generator as a clock.
-
>message #10: from AR, Feb 99:
about the new and old FIRPO setup.
|