Fasti Web Site




Fasti progresses

28 Mar 2006
Fasti/NICS installation report.
1 Feb 2006
Fasti installed at TNG focal plane, connected to NICS.
18 Apr 2005
The much cleaner signal obtained with the newer revision of Fasti-L3CCD
26 Apr 2004
Fasti noise at TNG with the complete NICS instrument.
04 Apr 2004
A More Flexible DIT Engine for Fasti SVB.
04 Mar 2004
Preliminary noise measurement taken with the HAWAII Multiplexer and the complete Nics electronics.
06 Feb 2004
Image of a mask taken with the HAWAII Multiplexer and the complete Nics electronics.
28 Mar 2003
Photos of the L3CCD buffer/Clock and ADC boards in their enclosures.
04 Nov 2002
Photos of the strong enclosure of Fasti focal plane electronics.
20 Sep 2002
Photos of the newly built BFD, the FIFO buffer board.
22 Mar 2002
The first frame acquired by means of the newly built A/D converter board.
28 Feb 2002
Photos of the newly built CAD, the A/D converter board.
18 Feb 2002
Photos of the newly built ASD board and LCD-Display module.
13 Dec 2001
Fasti-Nics waveforms.
13 Nov 2001
Photos of the newly built SVB board.
6 April 2001
Some exaples of Fasti waveforms.
20 December 2000
A preliminary Fasti layout