Procedure to Use Emergency
Closing Generator
for the Wind Baffle and Enclosure
Prepared by French Leger
Reviewed by Mark Klaene
Maintained by Gretchen Van Doren
Last modified on
The proper procedure to set up the wind baffle and enclosure to be
powered by the emergency generator in the event that both commercial
and site emergency generator power is lost.
Cautionary
Notes
Equipment
Involved in this Procedure
Procedure
CAUTIONARY
NOTES:
THIS OPERATION MUST BE DONE
WITH TWO PEOPLE; STATION ONE ON THE OBSERVING DECK AND THE OTHER ON
THE LOWER LEVEL. PEOPLE ON DIFFERENT LEVELS MUST BE IN COMMUNICATION
WITH EACH OTHER.
The enclosure should be open
with telescope in an un-stowed position.
Ensure that the enclosure
main arc lamps and the re-circulation fan are off.
Carry a flash light if after
dark; power will be unavailable.
Only those persons having a
purpose and are trained may execute this procedure; see web-based
training
list.
Check the whiteboards in the
Ops building and both levels of the 2.5-m enclosure for the current
status of the telescope and any other notes which may pertain to this
procedure. Be sure to indicate your planned change of
status.
SAFETY WEAR: (recommended)
rubber-soled shoes
EQUIPMENT
INVOLVED IN THIS PROCEDURE
Emergency closing generator
(ECG); Location: on the lower level outside east grating
adjacent to the east wall; Appearance: covered under
tarp.
Power panel GEN;
Location: ?; Appearance: grey circuit breaker
box
Wind baffle (WB) control
power switch; Location: ?; Appearance: ?
Enclosure power switch
box; Location: ?; Appearance: ?
PROCEDURE:
accomplish in numerical order
Preparation
Place the WB and enclosure power switches in the off
position.
Start the ECG:
pull the choke control button out
twist the ignition switch until the motor starts
push choke button back to normal position.
The ECG should be allowed to run idle for at least 2 minutes
before placing a load on it. It requires about 5 minutes to set up
the telescope to move.
The "Emergency Closing
Procedures" for the enclosure are implemented at this point. Read
the complete instructions, cautions and equipment used. Sections are
included below.
Preparation
- Open the WB control box. Warning - there is
208 VAC in this box keep hands aware from circuitry.
- Find emergency closing
controller
- Open the power switch to the WB control box
by throwing the red handled lever mounted to the side of the
junction box located directly below the WB control box
- Disconnect the 2 Brundy cables located in
the bottom of the WB control box labeled "24 VDC and
Inhibs"
- Connect the appropriate cable from the
Emergency Closing (EC) controller to the EC power supply and the
other 2 cables to the 24 VDC and Inhibs connectors (connectors are
different so connections can not be confused)
- Make sure the EC controller toggle switches
labled AZ and ALT are "Off"
- Throw the WS control box power switch
"close" (up)
- Activate the on switch for the EC power
supply, if not already on
- Disconnect the az axis control brundy, left
side of box 1/3 way up from bottom
- Connect the WS manual pendent to this
connector, making sure that the "pot" reads "000" and the palm
switch is depressed
- Turn on the az switch on the EC controller;
this should fire up the 3-left Somitoma amps located top of box
and labled az amps
- Disengage the az brake by turning the az
brake valve to the "off" position
The telescope can now move in azimuth.
Continue the procedure in sequence.
- With one person on the observation deck,
the WB clear of the hand rail, and the alt above 20°, pull up
on the palm switch on the WS manual pendent to engage the
system
- Slowly turn the "pot" knob until the az
begins to move, about 1/2 to 1 1/2 turns, if moving in right
direction continue, if not reverse direction of "pot" and az will
reverse direction
- Continue to move az at comforable speed
until 121° markers line up, slow down when approaching
markers and set the "pot" to "000" before depressing the palm
switch
- Engage the az brake by moving the az brake
valve to the "on" position
- Turn off the az switch on the EC
controller
The telescope is now ready to lower altitude
axis. Continue the procedure in sequence
- Make sure the palm switch on the WB manual
pendent is depressed and the "pot" reads 000
- Change the WB manual pendent connector in
WB control box to ALT Axis Brundy, make sure the "pot" is at "000"
and the palm switch is depressed
- Switch on the alt switch on the EC
controller, the alt amp should fire up
- Proceed to the observation deck with the WB
manual pendent and station yourself at the drive chain side of the
WB, the south side when the az is at 121°
- Disengage the alt brake by turning the alt
brake valve to the "off" prosition
- Standing by the south side of the
telescope, check that 'pot' reads "000" then pull the palm
switch
- Turn 'pot' slowly to determine correct alt
movement
- Bring alt to 6° and slowly approach
and set 'pot' to "000" and, depressing the palm switch, on alt
brake
- Disconnect and reconnect all Brundy
connectors to bring system back to normal at the WB control
box
After placing the telescope in stow position return the WB switch
to the off position.
Place the enclosure switch in "generator power" position
Proceed to upper level and close enclosure and hatches
Close east and west doors
Return to lower level and place EC switch to off position and
reconnect WB switch to generator power
Returning to upper level stow telescope at 30° altitude using
the WB manual pendent
Return to lower level, place WB power switch to off position and
disconnect the WB interlock bypass pendent. Return WB controller axis
brakes to normal condition
Place both WB and EC switches to commercial power positions
Shut down emergency closing generator and close up access door
Log activity in status log located on north wall inside lower
level
END OF PROCEDURE