HVAC Duct Work and Completion of Platform Destruction: Sept. 1, 1999


Basin Pipe and Metal completed the destruction of the enclosure platform with nice results

Cosmetic work will be completed at a later date.

Basin Pipe completes work on the duct vent plates located on the pier. This is what they are looking like on the observing level.

Southwest Air (Alamogordo subcontractor) is doing the duct work. These are various views of duct work on the lower level-west end. The closeup is the duct work passing through the pier flooring.

Top left-view of the duct work on lower level passing out the building to the utility breezeway. The other two views are of duct work on the lower level-east end.

Duct work pass throughs on east end of lower level. All the duct work and finishing is not completed.