Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.apo.nmsu.edu/Telescopes/ARCprogress/einstall1110/ein2.html
Дата изменения: Fri Nov 13 23:43:53 1998
Дата индексирования: Sun Apr 10 01:32:47 2016
Кодировка:

Поисковые слова: mercury surface
ARC Projects

Echelle Installation: Day Two; November 10, 1998

Caption above photo

Today's crew is Jeff Sundwall, Shu-i Wang, Larry Fiscelli, and Dave Woods.

Last night the cold really settled in and its a bit raw in the enclosure this morning. Jeff has everything set out to mount the front end of the camera and work on the alignment. The front end is hiding behind the coiled wire in front of the tank.

The front end is hoisted and alignment supports are attached to the back.

A different angle on the installation while folks tighten this and that.

Shu-i and Jeff unpack alignment rods.

Work begins in ernest on the alignment. Shu-i adjusts the collimator while Jeff adjusts the mirrors while working the laser (note right arm). I think that's how it went.

Additional installation pictures tomorrow.

Photos taken by Gretchen Van Doren/APO.