Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.apo.nmsu.edu/Site/SDSS.progress/199804172ndSupp/secondary.html
Дата изменения: Wed Apr 29 02:12:49 1998
Дата индексирования: Sun Apr 10 02:29:04 2016
Кодировка:
SDSS Secondary Support Installation

SDSS Secondary Support Installation: April 17-20, 1998

The secondary support was reassembled, installed and aligned with the primary mirror during this period. The UW team (Pat Waddell, Larry Carey, French Leger and Russ Owen) were helped by APO staff Mark Klaene, Jon Davis, with Steve Bastian and Angie Prosapio from FNL.

Nice photos of the primary mirror installed and parked at horizon.

Being prepared for secondary support installation.

The secondary support is reassembled on the pier prior to moving it to the telescope.

The support is maneuvered under the doors and into position to attach to the telescope.

The secondary support is maneuvered into position.

The secondary support system is attached to the telescope.

Views of the secondary mirror support after support is installed.

Assembling secondary mirror controls

Secondary mirror adjustments.

The secondary support assembly, as well as the secondary mirror installed on the telescope.

Pictures taken by Dan Long/Apache Point Observatory.