Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.apo.nmsu.edu/Site/SDSS.progress/mirrorfid0108/mirrfid0108.html
Дата изменения: Fri Jan 8 22:41:09 1999
Дата индексирования: Sun Apr 10 02:29:57 2016
Кодировка:
ARC Projects

Prep Work for Mirror Fiduciaries; January 8, 1999

Caption above photo

Beginning pictures for setting mirror fiduciaries. Steve Bastian/FNL is seen drilling location holes in the mirror cell.

More prep work. Also, note new status board located inside the enclosure.

The M1 is scheduled to be brought into the enclosure on Monday.

Photos taken by Gretchen Van Doren/APO.