Документ взят из кэша поисковой машины. Адрес
оригинального документа
: http://www.astro.louisville.edu/moore/cdk700/cdk700_gallery/index.html
Дата изменения: Thu Oct 3 07:43:51 2013 Дата индексирования: Thu Feb 27 20:33:34 2014 Кодировка: Поисковые слова: п п п |
Rick Hedrick (left) and Joe Haberman (right) with an early prototype at the Planewave factory in September 2009.
Karen Collins at the Planewave factory on October 7, 2010.
Rick Hedrick testing the CDK700 on October 8, 2010.
The finished telescope was delivered by air freight from California to Toowoomba in July 2013, and then to the mountain by truck. A crane lifted the mount with the lower truss, including the primary mirror, into the dome.
The crane was guided by Rhodes Hart to place the mount on a base that had been previously installed in the dome.
The upper truss was aligned and attached.
Rick Hedrick prepared the primary mirror in August.
The telescope is seen settled in its new Queensland home.