The system temperature for interim correlator boards
3 and 4 increased
by about 3 K sometime around 21jun11 (we're not exactly sure when the
problem first occurred). After trouble shooting we found that the +5
analog voltage for halfband filters 3 and 4 (in the same chassis) had a
2V repetitive dropout. We replaced the power supply and the system
started to work.
The halfband configuration is:
halfband filters hb1->sbc1 ,hb2->sbc2 are in the same
chassis and share the same power supplies
halfband filters hb3->sbc3 ,hb4->sbc4 are in the same
chassis and share the same power supplies.
We took some data before and after the changes. The
setup was:
lbw 1405 Mhz sent to all 4 interrim correlator boards with 1024
lags.
cycle through bandwidths 25 down to 195 Khz second
The bandwidth numbers used for the plots are:
2-25Mhz,3-12.5Mhz,4-6.25Mhz .. 9-.195Mhz
For each bandwidth do a 10 second calOn, calOff observation.
We computed the total power Tsys (using the cal value).