Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.mrao.cam.ac.uk/projects/OAS/pmwiki/pmwiki.php/MROIFastTipTilt/TechMeet6?action=diff
Дата изменения: Unknown
Дата индексирования: Sat Mar 1 21:48:26 2014
Кодировка:
OptInt PmWiki : Tech Meet 6 | History
Return to Tech Meet 6  (Edit)

MROIFastTipTilt.TechMeet6 History

Hide minor edits - Show changes to markup

June 24, 2010, at 04:54 PM by jsy1001 -
Changed line 22 from:
to:
June 24, 2010, at 04:52 PM by jsy1001 -
Added lines 21-22:
Zoom Transmissive
Variation from TechMeet7

Attach:TechMeet7/zoom.jpg

June 24, 2010, at 04:37 PM by jsy1001 -
Changed line 17 from:
Reflective, folded
Focal length 1600mm, OAP off-axis angle 10 deg
to:
OAP (reflective, folded)
Focal length 1600mm, OAP off-axis angle 10 deg
June 03, 2010, at 06:38 PM by jsy1001 -
Changed lines 3-4 from:

This meeting will take place on at 14:00 on Thursday 3rd June, in Room 911.

to:

This meeting took place at 14:00 on Thursday 3rd June. Attendees: JSY, MF, ADR, XS, CAH, DMAW, EBS

Changed line 15 from:

We have selected the following 3 conceptual layouts to present at CoDR. The drawings below are preliminary - the layouts are to be refined by Alex.

to:

We have selected the following 3 conceptual layouts to present at CoDR (with error budgets). The drawings below are preliminary - the layouts are to be refined by Alex.

June 03, 2010, at 06:34 PM by jsy1001 -
Changed line 14 from:

Conclusions

to:

Selected Layouts

Changed lines 17-41 from:
to:
Reflective, folded
Focal length 1600mm, OAP off-axis angle 10 deg
Dog-leg Transmissive
Focal length 1525mm
Direct Transmissive
Focal length 1525mm

Other Conclusions

  • Reflective layout now requires a folding mirror; in previous layouts FTT beam is probably occulted by AAS beamsplitter
  • OAP off-axis angle ~30 deg is probably ok according to ICOS
  • No significant benefits from not respecting AO or future dichroic mount envelopes
  • Addition of a negative lens will be considered as a variation on the above layouts

New Tasks

All high priority unless stated.

  • ADR: Refine selected layouts
  • JSY: Query with NMT:
    • AAS envelope
    • Space to overhang table
    • Clearance above table
    • M4 position
  • ADR: Tolerancing of direct transmissive layout under table bending
  • CAH: Request permission and funding to measure Nasmyth table deformation and temperature gradient at AMOS (during next trip to NMT)
June 03, 2010, at 06:16 PM by jsy1001 -
Changed lines 16-17 from:
to:
June 03, 2010, at 06:10 PM by jsy1001 -
Added lines 13-16:

Conclusions

We have selected the following 3 conceptual layouts to present at CoDR. The drawings below are preliminary - the layouts are to be refined by Alex. Attach:directTransmissive.png

June 02, 2010, at 01:53 PM by jsy1001 -
Added lines 1-12:

Technical Meeting #6: Optical layout for CoDR

This meeting will take place on at 14:00 on Thursday 3rd June, in Room 911.

Agenda

  • Impacts of coupling component mounts together (e.g. on a common baseplate)
    • With reference to error budgets
  • Need for flat folding mirrors
    • What factors drive this?
  • Selection of layouts and error budgets to present at CoDR
    • Variations on selected layouts to present at CoDR (e.g. "telephoto" lens arrangement)
Recent Changes (All) | Edit SideBar Page last modified on June 24, 2010, at 04:54 PM Edit Page | Page History
Powered by PmWiki