Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.mcc.rsa.ru/www_old/Mir/www_eng/MIR/BNO/Arhiv/Inform_press1403.htm
Дата изменения: Wed May 28 21:15:02 2014
Дата индексирования: Sun Apr 10 02:59:35 2016
Кодировка:

Поисковые слова: arp 220
Press release

Press release 

 14.03.2001

Press release 

March 14 2001 09:00 (Moscow time)

The operation with OC "Mir" scheduled for March 13 is complete.

During the previous day regular checkout of the OC "Mir" and the cargo ship "Progress M1-5" onboard systems and automatic equipment was performed with the Motion Control System on. The reported results confirm the OC "Mir" readiness for de-orbit dynamic operations.

The complex remains pressurized, the thermal mode is normal.The batteries generate enough electric power to provide onboard systems nominal performance and register trajectory parametres.

The next status report will be issued on March 15.