Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.mcc.rsa.ru/www_old/Mir/www_eng/MIR/BNO/Arhiv/Inform_press0603.htm
Дата изменения: Wed May 28 21:15:01 2014
Дата индексирования: Sun Apr 10 02:58:27 2016
Кодировка:

Поисковые слова: рер р р р р р т т т т т т т т
Press release

Press release 

 06.03.2001

Press release 

March 06 2001 09:00 (Moscow time)

The OC "Mir" operations scheduled for March 05 are complete.

The station continues in free drift.
The recent telemetry data confirmed the OC "Mir' remains sealed. The onboard systems perform nominal, the Complex arrays generate enough electricity, the thermal mode is normal.
Command complex was powered on and command software was entered in tne cause of communication sessions, pressure was equalized in pneumatic and hydrobus fuel tanks of the joint propulsion system of the core block of OC "Mir".

The next status report is scheduled for Match 7, 2001