Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.kosmotras.ru/en/news/73/
Дата изменения: Unknown
Дата индексирования: Sat Apr 9 22:53:07 2016
Кодировка: koi8-r

Поисковые слова: arp 220
Dnepr Cluster Launch Preparations Nearing Completion at Baikonur
пСЯ Eng
 


Dnepr Cluster Launch Preparations Nearing Completion at Baikonur

Preparations for the Dnepr-DubaiSat-1 launch are well progressing at Baikonur Cosmodrome.

Integration of DubaiSat-1, UK DMC-2, Deimos-1, NanoSat-1B, AprizeSat-3 and AprizeSat-4 satellites with the Space Head Module (SHM) adapters and SHM close-out were completed on 17.07.2009. SHM electrical tests were finished on 23.07.09. The SHM/launch vehicle mating was successfully performed on 24.07.09 and SHM/launch vehicle electrical checkout activities were carried out on 25.07.09.

Final launch preparations are being conducted today. The launch is scheduled for 29.07.09 at 22hrs 46 min Moscow time.
27.07.2009


All news

Contacts

7 Sergey Makeev St., bld.2, Moscow 123100, Russian Federation

Telephone: +7 (495) 745-72-61 
Fax: +7 (495) 232-34-85
E-mail: info@kosmotras.ru

Dnepr Program

During 1992-2003 timeframe, a team of Russian and Ukrainian companies together with the Russian Ministry of Defense (MoD) were involved in developing a commercial space launch system based on the technology of the SS-18 ICBMs being withdrawn from service.

Description and main specifications

Dnepr LV



Description and main specifications
Creation site: Web2b