Документ взят из кэша поисковой машины. Адрес оригинального документа : http://www.atnf.csiro.au/vlbi/dokuwiki/doku.php/lbaops/telecon2013aug09
Дата изменения: Unknown
Дата индексирования: Mon Apr 11 01:38:41 2016
Кодировка: ISO8859-5
lbaops:telecon2013aug09 [ATNF VLBI Wiki]

User Tools

Site Tools


lbaops:telecon2013aug09

VLBI teleconference, Thursday 09 August 2013

03:30 UT - 11:30 Perth, 13:30 AEST, 15:30 New Zealand

Phone:

Vic:03 9545 8222
NSW:02 9490 8022
ACT:02 6276 6622
Qld:07 3214 2311
WA:08 6436 8844
SA:08 8273 8122
NT:08 8944 8488
Tas:03 6232 5188

Meeting ID: 4439

Chair: Tasso Tzioumis

Attendance: Cormac Reynolds, Hayley Bignall (Curtin); Tasso Tzioumis, Chris Phillips, Phil Edwards (CASS Marsfield); Jamie Stevens (CASS Narrabri); Shinji Horiuchi (ATDSCC); Jamie McCallum, Brett Reid, Simon Ellingsen (UTas); Oleg Titov (GA); Sergei Gulyaev, Tim Natusch, Stuart Weston (AUT, NZ)

Apologies:

Agenda

  • 14-19 August 2013 LBA session
    • Block schedule
    • Detailed schedules
    • Telescope availability/issues
      • ATNF
      • UTAS & AuScope
      • WW
      • South Africa
    • People availability
    • SOC remote observing
      • ATNF
      • UTas
      • NZ
    • Monitoring
    • Disks
    • Correlator
    • Real-time fringe tests
    • Possible NAPA?
  • Tests
    • NTFN testing
    • Xcube testing
    • Other testing
  • Upcoming RadioAstron observations ?
  • Korea VLBI technical meeting 10-12 Oct 2013
    • Attendance
    • Presentations
  • DiFX technical meeting 14-18 Oct, Korea
  • e-VLBI developments/demos
  • Future plans: LBA wide-banding?
    • Xcube tests
    • telescope issues
    • correlator issues
    • e-VLBI
  • Organise scientific meeting in Northern Territory in 2014?
  • AOB

Actions arising

CARRIED FORWARD/UPDATED/CONTINUING

  • LBA data archive consolidation and copy at CASS. (CASS, Curtin)
    • LBA data archive. Need ATNF disk space (Tasso, Shaun) Continuing
  • ATCA phasing. Check performance and implementation (Jamie S, Richard) Updated
    • Definitely need >200 mJy calibrators. Stress in documentation. (ATNF)
    • Recommend strong calibrators ТЛ 200 Mjy ~every hour (depends on weather) + possible weaker calibrators more often (ATNF)
    • Ask PIs to nominate phase-cals and check fluxes BEFORE scheduled observations (Phil, Jasmie S)
  • ATCA Tsys via CABB (CASS) Updated
    • Investigate implementation by Bob Sault (Tasso)
    • Consult with Carrad and Sault about Tsys implementation on the CABB (Tasso)
    • Check with WEW and test whether acal scale preserved when mode changed to VLBI (Jamie S)
  • Observer training and remote observing (Tasso) Continuing
  • Wiki logs (All) Continuing
    • Log transfers quickly to FTP area and/or Wiki (ALL) Continuing
    • Annual т??bestт?? wiki-log competition. To be judged by correlator at annual Ops meeting. (Cormac)
  • Schedule more 32 GHz tests with ATCA? (Phil) Continuing
  • Pawsey centre access for VLBI and eVLBI (Chris, Cormac) Continuing
  • Linear to Circular polarisation conversion. (Chris, Richard, Cormac) Continuing
  • Monitoring т??check-listт?? for ATNF telescopes (Chris, Jamie S) Continuing
  • Monica implementation at Ceduna (Jamie & Jamie) Done
  • Remote access to Ceduna VNC via Hobart? (Tasso, Jamie M.) Done
    • VNC within VNC ? (Jamie M, Tasso)
  • Remote access to Ww (Stuart, Tasso) Done
  • Simon Ellingsen complex schedules. Send frequency changes list to Ettore (Parkes) and Quick (Hart) for development of LO setups (Simon, Chris) Done
    • Rationalise Simon's schedules (Cormac, Simon, Chris)
  • DASPRO for Parkes needs updating to reflect Mars Rx changes (Chris) Done
  • Check-list for ASKAP Rx changes. Especially 100 MHz reference for X-band. (Tasso, Suzy). Continuing
    • Include on Wiki documentation (Tasso)
  • RTFC needs >0.5 hours for Mk5 and complex (e.g Simon's) setups (Phil) Done
  • Eliminate separate rtfc schedules except for special modes (Cormac) Done
    • include in main schedules for 1st hour
    • Inform PIs of suitable fringe-finders from block-schedule (Cormac, Chris)
    • List of 22 GHz calibrators for Hart (Chris)
    • Ask Roopesh for calibrator update at 8 and 22 GHz (Chris)
  • For ATCA include in Wiki log: ref ant, pad, tied-array. Default ant03 on W104. (Jamie S)
  • For Tid, determine which antenna is scheduled in block-schedule and modify setup files (Cormac, Shinji, Phil)
  • Xcube developments by August session (Xcube, Tasso, Chris) Updated

NEW ACTION ITEMS

  • Check on Mp power-up of systems (Chris) Done
  • Schedule 32 GHz tests for vt10s (Chris) Done
  • Implement т??intentsт?? keyword from Vex schedule into ATNF schedules for auto-phasing (Jamie, Chris) Continuing
  • Fix cdisko to record single polarisation, especially at Cd (Jamie S) Done
  • Check on datarates and disk availability (Chris, Jamie) Done
  • Remote access Ho and Cd via VNC for session. Need ssh tunneling. (UTas) Done
  • Monitoring improvements (Jamie) Done
  • Arrange tests on Curtin Xcube (Chris, Cormac) Continuing
  • Onsource info from ATCA. Fix cgi scripts (Chris) Continuing
  • Mk5 schedules and FS version. Tests needed (Jamie M) Done
  • Investigate desirability of upgrade NZ connection from 1 Gbps to 10 Gbps (All) Continuing

STANDING ACTION ITEMS

  • VLBI science meeting in 2014 at Darwin (?) and setup LOC, SOC (Tasso)

Next meeting: 27 August 2013

lbaops/telecon2013aug09.txt ТЗ Last modified: 2015/12/18 16:39 (external edit)